How long will it take for the wall painted with Nippon paint to move in?

Generally speaking, the wall paint can be dried into a film about 2 days after construction. If you have children, it is best to check in after a month of ventilation.

You can't live in a room decorated with glue paint immediately, so you should try to ventilate it, but you can't open all the doors and windows for ventilation, because this may bring disadvantages to the newly constructed wall top paint, which will make the wall top dry quickly, easily crack and damage the appearance.

How to get rid of the smell of paint in a newly decorated room: Fill the container with cold water, then add some vinegar in a ventilated room and open the furniture door. In this way, the coating surface at the top of the wall can be protected by evaporation of water, and the residual odor can be absorbed and eliminated. Buy some pineapples and put some in each room. You can put more in the big room. Because pineapple is a kind of crude fiber fruit, it can not only absorb the smell of paint, but also send out the fragrance of pineapple, speed up the removal of odor and achieve the best of both worlds.

To quickly remove the residual paint smell, you can soak cotton balls in citric acid and hang them indoors and in wooden furniture. Newly renovated houses often have the pungent smell of various chemical raw materials such as Tianna water. Put a broken jackfruit in the house. Because jackfruit is big (generally as big as watermelon), its smell is particularly strong, and it can be absorbed in a few days.

Extended data:

Latex paint hazards:

1, function

(1) Unique environmental protection: production at normal temperature and pressure, non-toxic, tasteless, pollution-free, water-soluble and environmentally friendly.

(2) Strong adhesion: Strong adhesion to mortar, concrete, stone, asbestos board, wood, metal and other building materials.

2. Precautions:

(1) Please read the construction instructions in the product packaging carefully before use, so as to obtain reliable and satisfactory painting effect.

(2) Try to open all doors and windows before operation and use to ensure good ventilation in the construction area.

(3) In case of skin allergy, always wear protective equipment when using; If your eyes are accidentally contaminated, immediately flush with plenty of water and seek medical help.