What are the second phase 14 stations of Chongqing Rail Line 4?

By March 9, 20265438/KLOC-0, the specific stations of Chongqing Rail Transit Line 4 Phase II are:

Tieshanping Station, Ganbazi Station, Yu Zui Station, Yu Miao Road Station, Gaoshikan Station, Fusheng Station, Wang Jiacheng Station, Shengjibao Station, Longxing Station, Gaoshita Station, Pufu Station, Tongzilin Station, Ishikawa South Station and Ishikawa Station.

The second phase of Chongqing Rail Transit Line 4 (Tangjiatuo Station to Shichuan Station) has a total length of about 32.6 kilometers, with 4 stations/kloc-0, which will quickly reach Longxing and Fusheng areas in the east and the central city.

Extended data:

All stations in the first phase are Min 'an Avenue Station, Chongqing North Railway Station Guangbei Station, Toutang Station, Bonded Port Station, Cuntan Station, Heishizi Station, Gangcheng Station (temporarily opened), Taipingchong Station and Tangjiatuo Station.

As one of the important lines in Chongqing rail transit construction network, the first phase of Chongqing rail transit line 4 connects transportation hubs, industrial parks, tourist attractions and other important areas in series. Its opening will expand urban space and optimize urban layout.

Chongqing Rail Transit Line 4 takes "Chongqing Literature and Art" as its cultural theme, covering Chongqing literature, calligraphy, fine arts, photography, opera, acrobatics, film and television, arts and crafts, dance and other cultural elements. With outstanding literary and artistic works and figures as the theme, Chongqing's rich cultural accumulation is displayed through wall lamp relief and painting.

Baidu Encyclopedia-Chongqing Rail Transit Line 4