What does Jian 'an project cost include?

Jian 'an value-added tax, project cost, conscience. After the packing inspection, the invoice will be increased. -Supply-Issue-Tickets-

The following information is copied from other people's answers. If you use the above two sentences, you don't need to read the following information. Please fill in the details later.

Jian 'an project fee includes:

1, direct costs: labor costs, materials costs, machinery costs, organizational measures costs, technical measures costs;

2. Indirect costs: expenses;

3. profit;

4. Special expenses of the project;

5. taxes and fees.

1. Direct cost refers to the cost that constitutes an engineering entity and contributes to the formation of the project, including labor cost and material cost; Construction machinery use fee.

(1) Labor cost refers to various expenses of production workers directly engaged in construction and installation.

(2) Material cost refers to the cost of main materials, auxiliary materials, components, spare parts, semi-finished products and amortization cost of turnover materials consumed in the construction process.

(3) The construction machinery use fee refers to the machinery use fee incurred in the operation of construction machinery.

2. Other direct costs refer to other costs incurred in the construction process except direct costs, including:

(1) The increase in construction cost in rainy season refers to the cost of labor, materials, facilities and poor work efficiency caused by rain-proof, wind-proof and anti-skid measures taken to ensure the engineering quality in rainy season.

(2) The night construction increase fee refers to the night construction lighting facilities fee, work efficiency reduction fee and night meal fee, which are necessary for the normal process overlapping in the construction.

(3) The secondary loading and unloading fee refers to the secondary loading and unloading fee for the construction and installation materials, finished products and semi-finished products that constitute the project because the transportation road cannot be directly transported to the construction site or the site stacking conditions are limited.