In today's social life, the minutes of the meeting are more and more widely used in life, the minutes of the meeting requires a clear procedure, a clear purpose, the center is prominent, the generalization is accurate, the hierarchy is clear, the language is concise. Then the relevant minutes of the meeting in the end how to develop? The following is my union activities for you to organize the minutes of the meeting sample (general 5), welcome to read and collect.
Minutes of the meeting of trade union activities 1
XX January 28 afternoon, Song Qiang, deputy director of the city's building construction in the first quarter of this year to prevent serious accidents hosted a meeting. Cities and districts construction bureau in charge of safety deputy director, building management unit chief, supervision station chief; city construction project quality, safety supervision station chief; city costing station, construction industry association secretariat main person in charge of the meeting. The relevant leaders of the Municipal Bureau of Work Safety Supervision were invited to attend the meeting. The summary is as follows:
First, the meeting conveyed the first quarter of XX the province's building construction to prevent serious accidents work conference spirit.
XX year, the province's construction safety production situation is generally stable, mainly in the "two year-on-year decline":
First, the number of accidents and deaths year-on-year basically flat, a slight decline.
Secondly, the number of construction accidents and casualties in most areas decreased year-on-year. However, the number of deaths in construction accidents in our province is still ranked in the top three in the country's provinces and cities, and the situation of production safety is still serious.
Second, the meeting requested that all areas should grasp the following six aspects of work:
1, grasp the development of XX year safety work planning, planning. Each place should take the initiative to find ways to do the work in front of the early planning, early preparation to ensure that the city's construction safety production this year to continue to maintain overall stability.
2, ready to meet the production safety supervision responsibility assessment. This year, the provincial construction department will be at all levels of construction administrative departments and construction safety supervision agencies for the production safety supervision responsibility assessment, around the organization can organize their own pre-test, strengthen the supervision team construction and improve the relevant management system, at the same time, we should take the initiative to communicate with the higher authorities, and strive for the guidance of the higher authorities.
3, continue to grasp the "safe card" system implementation. At present, the city's construction workers "peace card" card rate of about 40%, one is to grasp the city's construction workers "peace card" card rate of increase, two is to make the "peace card" Management humanization.
4, to further enhance the "Guangdong Provincial Construction Department construction safety production dynamic management approach" implementation. Each place should effectively strengthen the supervision and inspection, the violation of the enterprise and individual resolutely deduct points.
5, to continue to implement the production safety license system, strengthen the construction units, supervision units and the awareness of the responsibility of the relevant personnel.
6, to strengthen the safety and technical management of construction projects, improve the construction organization design and special program implementation of the inspection efforts.
Third, the meeting emphasized that all localities should effectively do a good job of production safety in construction this winter and next spring, carefully deployed, and pay close attention to implementation.
In particular, the recent impact of low-temperature rain and fog, to attract great attention to ensure that the country's "two sessions" during the security incidents; to maintain a clear mind, to improve the understanding of the concept of "safety hazards", to be by In the past, only focus on the management of "things", transformed into both heavy "things" `management more important "people" management, because "people" management on the emergence of the "people" of the management of the "people" of the "people".
Participants: Jiangmen City Safety Supervision Bureau Zhang Yongle, Jiangmen City Construction Bureau Song Qiang, Qi Rongzhim, He Ming, Chen Guangyuan, Qiu Bairong, Huang Huixin, Hua Youkun, Lu Wenbin, Liu Guangsheng, Chen Wangdi, Zhao Jianbo, Pengjiang District Construction Bureau, Liang Yu, Liang Liru, Jianghai District Construction Bureau, Xu Yong'an, Yao Juncheng, Xinhui District Construction Bureau, Chen Wenjie, Liu Zhenning, Heshan City Construction Bureau, Li Yongcan, Yang Rihua, Kaiping City, Zhen Chaoyang, Yu Runhua. Construction Bureau Zhen Chaoyang, Yu Runsiang, Wu Mingqin, Taishan City Construction Bureau Liu Wen, Yang Jinhu, Enping City Construction Bureau Wu Lingyan, Zhang Timrong, the city's costing station, the Construction Industry Association Liu Wanbao, Chen Yimin, Chen Laixing.
Minutes of the meeting of trade union activities 2In the afternoon of June 9, 20XX, Jiangbei District Housing and Urban-Rural Development Bureau in the Hongtang West Road project, the second section of the site of the project department conference room hosted the completion of the Hongtang West Road project of the preliminary acceptance meeting, participated in the meeting of the Municipal Construction Committee, the Municipal Administration of City Administration of City, the Municipal Public Security Bureau of Traffic Police Department, the city Tongtou Company, the city of Municipal Municipal Quality Supervision Station, the city of Drainage, the city of the Water Supply Corporation, City Bus Company, City Street Lighting Management, Jiangbei Traffic Police Brigade, Jiangbei District Urban Management Bureau, District Transportation Bureau, District Agricultural and Water Bureau, Jiangbei Power Supply Bureau, Hongtang Street Office, Hefei Municipal Municipal Design Institute Limited, Ningbo High Commissioner Construction Supervision Co. Participants listened to the construction of the project, design, supervision, construction unit reports, and on-site field view and acceptance, on the problems in the project expressed their views and suggestions. Now the relevant matters are summarized as follows:
First, Hongtang West Road project from the North Outer Ring Road in the south, the north to Jiangbei Avenue, the design length of 1523.88 meters, the planning width of 44 meters. Construction standards for urban trunk roads. Main construction content: roads and ancillary works, a bridge, rainwater and sewage drainage pipes, water supply pipes, power ditches, supporting greening, street lights, bus stops and traffic sanitation facilities. Communication and gas pipelines are synchronized according to the planning.
Second, the delegates agreed that the overall construction quality and appearance of Hongtang West Road project feel good, agreed that the project through the completion of the preliminary acceptance.
Third, the meeting to clarify the relevant content:
1, because the southern end of the project involves the North Outer Ring Elevated Road construction borrowing the need for stake K0 + 018-K0 + 051 section is not implemented in place, reported to the Municipal Construction Commission and other relevant departments, agreed to the construction of this part of the project for the dumping of the project by the implementation of the North Outer Ring Elevated Road Unit Construction.
2, the east side of this road project (from Changxing East Road to Jiangbei Avenue) red line and the status quo has been built between the community walls, parks for greening, specifically by the design of the contact sheet. The cost is included in the total investment of this project.
3, in order to ensure that the road traffic safety, and Changyang East Road intersection by the original Changyang East Road implementation of the traffic island and the central isolation zone within the greening for transformation; bridge ends of the road side of the road side of the high difference between the road side of the road to set up plastic steel guardrail. This project and Changxing East Road intersection, and Changyang East Road intersection of road traffic facilities need to be further optimized, after the meeting by the Jiangbei District Housing and Urban Renewal Bureau in conjunction with the relevant units to determine. Specifically by the design of the contact sheet. The cost is included in the total investment in this project.
4, the bridge set bridge nameplate, load limit sign, pedestrian walkway set warning piles, specific by the design of the contact sheet. The cost is included in the total investment of the project.
5, due to the North Outer Ring elevated road and Jiangbei Avenue is under construction, the project road south and north ends of the 1-meter-high brick fence and reflective no-traffic signs.
Fourth, the project shall be rectified:
1, the completion of the information as soon as possible to the relevant units and the special acceptance.
2, local asphalt concrete surface damage to be rectified and reworked, local sidewalk paving irregularities should be rectified and reworked.
3, do a good job of finished product protection, greening seedlings to strengthen the maintenance of individual seedlings and dead seedlings do not meet the requirements should be replaced or replanted in due course.
4, please traffic facilities to implement the unit as soon as possible to complete the traffic painting line, sign setting and other traffic facilities.
5, the construction unit should be for the problems raised at this meeting, according to the design and specification requirements to grasp the rectification and implementation, grasp the preparation of the final account of the project and improve the construction data, and so on with the conditions of the comprehensive acceptance.
Meeting Name
Safety Production Summary Coordination Meeting
Meeting Time
Afternoon of August 16, 20xx
Meeting Location p>
Conference Room
Host
Attendees Sun Gangqiang, Wu Jianping, Wang Lu, Guo Zhaolu, Li Yanling, etc. Meeting content: the first half of the safety summary and the second half of the implementation of the safety plan of work at this meeting was presided over by the Han Jianshen, the meeting according to the general manager of the cadres held in the cadres of the spirit of regular meetings on the first half of the 20xx year to supervise and inspect the work of safety to make a summary, the next half of the safety work to be carried out. Inspection work to do a summary of the next step in the work of a new deployment.
1, safety supervision and inspection. The main participants safety officer, the main person in charge, according to the inspection situation issued rectification instructions; the end of each month to convene a regular meeting of the security, informed of the recent security work.
2, safety inspection system. On-site inspectors, safety officers, managers and other personnel should inspect and register each part according to the system. Inspection frequency is low, not according to the system implemented by the relevant provisions of the penalty;
3, the plant vehicle management. Now we have more cars in the company, to strengthen the supervision and management of site personnel, found violations, must stop or notify the Ministry of Defense to deal with.
4, sub-regional setting of security responsibility, special workers pre-service training. The development of part-time security responsibility for each region; the safety of each position operating procedures to be compiled into a booklet, the staff to carry out targeted training.
5, the use of operating license. Individuals are not in place for the use of the operating license, for the operating license signed by all levels of personnel at the same time is also a notification to you to view its precautions and arrange for personnel to check the assistance, which also reflects the degree of attention to safety. The next step in the inspection was found not to handle the operation ticket to be punished according to the regulations, if found to be illegal operation doubly penalized.
6, the project safety labeling is clear. Do it as soon as possible after the use, especially the distribution room, the operating table and other parts of the operator, the operator, outsiders play a warning role; plant labeling must be based on the issued national regulations to do.
7, lightning self-test. Equipment department with 揺meter on the distribution room grounding to do a self-test to see whether the grounding is in line with the regulations; now some units to reduce lightning, static electricity on electrical appliances or lines and other damage caused by the gas station so dangerous parts of the installation of a surge device, in order to prevent damage to the study of whether we want to install.
union activity minutes 4December 8, 20XX, municipal facilities management Qu Mingping, deputy director of the Yantai Village Committee in Yantai presided over the Ankang City Yantai Lane municipal comprehensive renovation project completion acceptance meeting. Hanbin District Planning and Design Institute, Shaanxi Anxin Supervision Company, Jiangbei Office, Yantai village and municipal office of the relevant departments attended the meeting. Now the meeting matters are summarized as follows:
First, the acceptance of the group and the participants of the site for site survey, detailed inspection of engineering information. The meeting first listened to the construction, supervision, design and other units to summarize the report, the construction unit on the implementation of the project construction report, acceptance of the inspection team made a report to the meeting. Acceptance assessment of Ankang city Yantai Lane municipal comprehensive renovation project quality qualified, standardized engineering data compilation, completion and acceptance procedures in line with the requirements.
Second, the final account of the project audited total investment of 763,422.67 yuan, of which: construction and safety engineering investment of 707,885.53 yuan (roads, drainage, water supply project cost 625,714.42 yuan, street lighting project 82171.11 yuan); to be amortized costs of 55,537.14 yuan (construction unit management fee of 14,157.71 yuan, design fees) 17697.14 yuan, supervision fee 18405.02 yuan, cost review fee is 5277.27 yuan).
Third, the completion of the acceptance of the collective assessment of the group: Ankang city Yantai Lane municipal comprehensive renovation project through the completion of the acceptance of the project, starting immediately, formally included in the Ankang Municipal Facilities Management Office of the management of the warranty period from the date of acceptance is calculated according to one year.
Fourth, on the meeting of some of the engineering defects and as-built drawings are incomplete and other issues, the construction unit was instructed to seriously sort out the investigation, one by one against the rectification and implementation, rectification results confirmed by the supervisory unit, according to the procedures in writing to the municipal management office for verification.
Minutes of the meeting of the labor union activities 5
July 20, 20xx, the labor union chairman Zhu Meilin in the company's 617 conference room presided over the third quarter of the trade union committee of the expanded meeting of the company's trade union committee, the company's trade union members and the chairman of the grass-roots branches attended the meeting.
First, the main agenda of the meeting:
(a) the chairman of the grass-roots branches to report on the second quarter of the work of the union;
(b) Zhu Meilin, chairman of the conveyance of the second quarter of the trade union union of the spirit of the second quarter of the trade union chairman of the trade union of the CIC;
(c) Zhu Meilin, chairman of the summarization of the second quarter of the work of the trade union, and lay out the third quarter of the trade union work.
Second, to convey the spirit of the higher trade union regular meeting
Zhu Meilin, chairman of the conveyed the spirit of the second quarter of the second quarter of the trade union chairman of the trade union of the Central China Shipping Industrial Union held on July 6 meeting, mainly including the following aspects:
1, do a good job of summer labor protection and prevention of heatstroke, supervise the administrative and logistical safeguards measures in place to ensure that the personal safety of employees, staff heat stroke accidents to zero.
2, care for the workers leaving the post, put the care and concern for the workers leaving the post in a certain position, the stabilization of the workers leaving the post and retiring to do deep and detailed work.
3, do a good job of the company's Golden Autumn Scholarship (bursary) work. The labor union to family difficulties, sick workers checking and mapping, to help the workers in difficulty, to make every employee family can afford to eat, afford to see a disease, can afford to go to school.
4, each unit to develop advanced model training plans and programs.
5, combined with the practical implementation of Lu Jinlin model labor innovation studio. The labor union of each company to learn Lu Jinlin labor model innovation studio experience, and strive to create the company's advanced collective, advanced team.
Third, the second quarter of the trade union work summary
(a) the company's trade unions won a series of commendations
April 24, the company debugging workshop, a team of Jiangdu District Federation of Trade Unions was awarded the "Worker Vanguard" title.
May 7, in Yangzhou City, the implementation of the "one million workers to practice and compete in the three-year plan" summary of the General Assembly, our company won the title of advanced collectives, auxiliary labor company welder He Min won the Yangzhou City, "May Day Labor Medal" and "skilled" title, the company's information system, the company's information system, the company's information system, the company's information system, the company's information system, the company's information system, the company's information system, the company's information system. "title, the company's information center Tong Xiong was 20xx annual Yangzhou City workers vocational skills competition computer operation "excellent player" title, auxiliary labor company welder Wang Chao welding "excellent player" title.
(B) to carry out corporate cultural activities, cultivate workers noble sentiments
In order to celebrate the 62nd "May Day International Labor Day", carry forward the "love me Zhonghai, the courage to create a first-class" spirit of enterprise, the company's labor union in April, the company has been working to promote the development of the company, the company's labor union in April, the company's labor union in April, the company's labor union in April, the company's labor union in April. Enterprise spirit, the company's labor union on April 28-30, organized the 20xx annual company advanced individuals, excellent party members, excellent party workers, excellent trade union cadres, trade union activists **** 40 people to go to Putuo Mountain in Zhejiang Province, Fenghua Xikou spring tour.
At the end of April, the trade union organized 156 participants in the physical examination, to participate in the "China Shipping Cup" Yangzhou Jianzhen International Half Marathon.
In May, the labor union organized the "China Shipping Shipbuilding Style" photography collection activities, received 86 pieces of photographic works of employees, after the selection: the first prize of 3, the second prize of 6, the third prize of 10. 20 works were selected to be submitted to the report. 20 works were selected to participate in Yangzhou City Federation of Trade Unions and Jiangdu District Federation of Trade Unions "We have the power of the workers" staff style photography exhibition, showing the spirit of Zhonghai people.
In June, the company's soccer team participated in the "Casilla Cup" and "Go China Fantasy European Cup" indoor 5-player tournament in Yangzhou.
On June 27, the large-scale dance "Hello Motherland" and the female singing "Call of the Heart" and "Navigating China" performed by the labor union of the company participated in the 15th Anniversary of the founding of China Shipping (Group) Company at Shanghai Oriental Art Center on behalf of CIC, which fully demonstrated that CIC has been actively pursuing the development strategy of "repairing and building" and has been actively promoting the development strategy of "repairing and building" and the development strategy of "building and building". The company's development strategy of "building and repairing" is fully demonstrated, and the spirit of vigorously upward.
In the second quarter, the labor union joined hands with the Yangzhou City Federation of Trade Unions and Jiangdu District Federation of Trade Unions to screen three movies for the contracted construction workers at the base of the No. 2 canteen.
(C) care about the life of employees, guide employees in the same boat **** degree of "winter"
April 28, the trade union organization to carry out the second quarter of 20xx to help the poor to send warmth to the activities of the sympathy of the three employees in need of condolences, the amount of condolences a total of 3,000 yuan.
On May 31st, the labor union bought books, food, umbrellas, etc., and paid condolences to two poor students in Tangtou Primary School in Guochun Town, a poverty-stricken area supported by the company in Jiangdu, encouraging them to study well and be active. Let the poor students spend a happy Children's Day.
In the second quarter, the labor union sent birthday cakes to 12 employees for their whole birthday, and condolences to 1 employee for the death of his parents, totaling 1800 yuan.
(4) to carry out the activities of excellence, do a good job of summer cooling
The second quarter has entered the hot season, the labor union in line with the "people-oriented" concept, care for the majority of employees and contracted companies to care for the health and personal safety. In the second quarter for the whole plant workers and laborers issued summer cooling supplies, and urged the contracted companies to do a good job of summer cooling. By the end of June, 27 direct drinking fountains, 30 automatic water boilers, 18 automatic beverage vending machines, and 98 refreshment points were installed in the plant ***, and the availability of these equipment and facilities provided the necessary safeguards for the production line workers to successfully pass through the high temperature period in summer.
According to the Industrial Trade Union No. 20 "Notice on the Organization of Employee Representatives' Inspection of Summer Labor Protection, Safety and Production and Prevention of Heat Stroke", the company's trade union also carried out a series of related activities:
1. In accordance with the requirements of the refinement of the safety of the production, to carry out the fifteenth "Zhonghai Cup" safety without defects Winning team activities;
2, June 21, trade unions organized staff representatives to inspect the summer labor protection and safety production and prevention of heat stroke, timely investigation of potential accidents 7 and deadline for rectification and implementation;
3, June 28, trade unions with the administration in accordance with the "repair of the shipbuilding team leader safety knowledge readings," the organization to carry out a team form of safety production responsibility learning and education activities;
3, the trade unions with the administration in accordance with the "repair of the shipbuilding team leader safety knowledge readings" organization to carry out a safety production responsibility study
4, do a good job of preventing heat stroke preparatory work, set up more than 1,000 square meters of the front-line high-temperature workers resting place, equipped with air conditioning, curtains, tea. Strengthen the knowledge of high-temperature operating personnel training, do a good job of canteen management and supervision, do a good job of summer "send cool" condolences to prepare for the work of the 14 summer to send tea workers for health checks.
Fourth, the layout of the third quarter of the trade union work
1, the establishment of the workers home: in the first canteen on the third floor to establish the activities of the room, equipped with table tennis, treadmill, combined fitness equipment, etc., for the majority of workers to open up, the development of the "China Shipping Industry (Jiangsu) Co. activity room.
2. 68 college students were introduced into the company in July, and the labor union cooperated with the administration department to arrange the accommodation for the college students. In the city of Jiangdu, a basketball court and a badminton court were established to enrich the amateur cultural life of college students.
3. In the third quarter, the labor union urged the contracted construction companies to carry out high-temperature inspection for the operators.
4, continue to carry out high-temperature midday rest place inspection and send water, send "cool" work.
5, continue to cooperate with the Yangzhou City Federation of Trade Unions, Jiangdu District Federation of Trade Unions monthly movie screenings for contracted construction workers.
6, the union will guide the contracted construction units to gradually set up trade union organizations.
7, in order to facilitate the workers, in the factory beach building to set up a small supermarket.
8, to further promote the implementation of the company's second labor conference related matters.
Proofreading: Wang Huijuan Copy: China Shipping Industry Labor Union
Cc: Party Committee of the company, the company's leadership, the company's grass-roots chapters
;