First, these Measures are applicable to enterprises and institutions engaged in interior decoration engineering design and management in China and obtained the qualification grade of interior decoration design.
Two. The charging method for general interior decoration works is shown in the table below, and other special engineering designs are discussed separately.
Answer: Four or five-star hotels, guesthouses, beauty salons, high-class restaurants, high-class bathrooms, high-class apartments, villas, planes, ships, luxury cabins and nightclubs charge% 8; Construction guidance fee %2-4
B: Three-star hotels, guesthouses, theaters, playgrounds, apartments, gyms, clubs and cafes charge% 7; Construction guidance fee %2-3
C: Design fees for first-and second-star hotels, guesthouses, banks, travel agencies, train carriages, canteens, general cafes and exhibition venues% 6; Construction guidance fee %2-3
D: general shops, offices, conference rooms, garden environment, courtyard (100_), general civil houses, publicity and design of external environment, etc. 5%; Construction guidance fee %2-3 Note: The fees for design, drawings, supervision and guidance in the table are the percentage of the estimated cost of interior decoration engineering (excluding the cost of supporting products without design).
Design units do not participate in construction supervision and guidance, and do not charge construction guidance fees.
3. The total cost of interior decoration project is 5 million yuan to100000 yuan, and the design fee rate is reduced by 0.5%; 1100,000 yuan to 20 million yuan, reducing the fee1%; From 20 million yuan to 30 million yuan, the handling fee will be reduced by1.5%; More than 30 million yuan, 2% fee reduction.
Four. If another designer (or his appointed agent) is hired to coordinate the design affairs on site, Party A shall bear the transportation, accommodation and service fees: 80- 120 yuan/day for senior interior designer, 60-40 yuan/day for assistant interior designer, 80 yuan/day for long-term staff, 30-30-50 yuan/day for 60 yuan/day.
Five, the above fees can be selected according to the specific circumstances of the project, and by the design and commissioning unit according to the actual situation, with reference to these measures to decide. If additional items are added to the project, the fee will be charged separately.
Six, the provisions of the installment fee:
1. 20% of the total design fee will be charged when signing the contract;
2. Charge 30% of the total design fee when submitting the preliminary design scheme.
3. When the construction design drawings are delivered, 40% of the total design fee will be charged.
4. After the project acceptance is completed, the total design fee 10% (all settled).
The above items shall be paid in one lump sum.