The so-called "three simultaneities" means that the safety facilities of a construction project must be designed, constructed and put into production and use at the same time as the main project. Investment in safety facilities should be included in the budget estimate of construction projects. Only by adhering to the "three simultaneities" and providing workers with labor safety and health facilities in line with state regulations can the health and safety of workers be better guaranteed.
The legal basis of "three simultaneities";
Article 53 of Chapter VI of the Labor Law clearly requires: "Labor safety and health facilities must meet the standards set by the state. Labor safety and health facilities for new construction, renovation and expansion projects must be designed, constructed and put into production and use at the same time as the main project. "
Article 28 of the Law on Safety in Production stipulates: "The safety facilities of new construction, reconstruction and expansion projects of production and business units must be designed, constructed, put into production and use at the same time as the main project, and the investment in safety facilities should be included in the budgetary estimate of construction projects."
Article 16 of the Law on the Prevention and Control of Occupational Diseases stipulates: "The cost of occupational disease prevention facilities for construction projects shall be included in the project budget of construction projects, designed, constructed and put into production and use at the same time as the main project."
20 15+ 1 The article 41 of China's Environmental Protection Law, which came into effect on June 0, stipulates: "The pollution prevention facilities in a construction project shall be designed, constructed and put into use at the same time as the main project. Facilities for pollution prevention and control shall meet the requirements of the approved environmental impact assessment documents and shall not be dismantled or left idle without authorization. "
Extended data:
The "three simultaneities" system eliminates the risk factors that may cause casualties and occupational diseases in various projects from the source, protects the safety and health of employees, ensures the normal operation of new projects, prevents accident losses, and avoids unnecessary investment caused by rework or remedial measures for safety problems.
The establishment of "three simultaneities" system is an effective legal system to prevent new projects from being put into production with illness and ensure the essential safety of things.
The combination of "three simultaneities" system and safety and health pre-evaluation system is the concrete embodiment of implementing the policy of "prevention first". The combination of the two can make new projects more reasonable, eliminate and reduce potential hazards to the maximum extent, and truly prevent problems before they happen.