Specifically, winter decoration is nothing more than affected by low temperature and air drying.
Generally, low temperature weather has a certain influence on the decoration bricklayer and oilman. In cold weather, putty, wall paint, cement, waterproof, etc. will dry slowly. At this time, as long as you are patient, there will be no problem. It's just that if it's a decoration company worker's construction, such as painting and putty powder, we must remind the construction master to wait for the first layer to dry before painting the second layer. At the same time, if the indoor temperature is below zero, don't build bricks!
A dry environment may have a great influence on carpentry. Wood itself contains water. Although there is already a drying step in the factory, it will change with the change of air humidity after leaving the factory. If the wood itself is not dry enough, it will crack more easily in dry winter. In fact, this is also a method to test the quality of wood, and the pros and cons are half!
Usually winter decoration, water and electricity slotting and wiring work will be put before the Spring Festival, and other construction will be put after the Spring Festival, so that the renovation of new houses can be basically completed in spring. After the best drying time-drying in summer, you can basically stay in new houses in autumn.
I hope the above answers can help you! In this regard, if you have any better suggestions or opinions, you can leave a message in the comments area to share with everyone for the reference of friends in need!