With the popularization of legal knowledge, contracts can be used at any time and place in various situations. The purpose of signing a contract is to protect the interests of both parties and avoid unnecessary disputes. So how to draw up a contract? Presumably this makes everyone very upset. The following is a sample of a steel bar contract I collected for your reference, hoping to help friends in need.
Reinforcement Work Contract 1 Party A:
Party B:
Through friendly negotiation between Party A and Party B, Party A entrusts Party B to build _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
I. Overview of the Project
Project name:
Project location:
General situation of the project: all steel bar fabrication, binding and welding works in the above projects.
Second, the scope and mode of contracting
1. Contract content: all labor costs such as steel bar batching, sample turning, installation, butt welding, binding, post-construction cleaning, waste stacking, etc. , as well as all auxiliary materials such as reinforcement machinery, electric welding machine, vertical butt welding equipment, wire binding, covered electrode, welding tools, etc. Required for reinforcement engineering; Tool fee; Expenses for artificial aerial work in super-high and high-rise buildings, etc. ; To be borne by Party B. ..
2. Contracting methods: labor, quality, construction period, safe production, civilized construction, steel bar production, auxiliary materials (all materials and tools except steel bars) and mechanical equipment.
3. All work contents in reinforcement engineering (but not limited to the above work scope), such as horizontal transportation of reinforcement materials (from molding site to binding point), vertical transportation of reinforcement (using tower crane on site), on-site feeding and binding, on-site cleaning after completion of each construction period, sorting and recycling of redundant reinforcement, quality acceptance of reinforcement, and on-site civilized construction (including cooperation with Party A and other superior inspection units).
4. Except for the expenses arising from rework due to Party A's reasons, other expenses shall be calculated in real terms.
Third, the construction period and the time for workers to enter the site:
The workers of this project have been in construction since _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ In case of shutdown due to reasons such as Party A, Party B shall compensate all economic losses caused thereby.
Fourth, the contract unit price:
1, quality, safety, progress, civilized construction, etc. The above work content and scope are within the scope of the reinforcement project contract.
2. Calculation method:
According to the above-mentioned contracting scope and methods, all the labor costs of steel bar contracting in the construction blueprint of this project are calculated according to the drawing construction area of square meters. 45 yuan per square meter.
3. Quality, safety, progress and civilized construction are the requirements that Party B must meet within the contract scope, that is, it must meet the approval (acceptance) of Party A, the supervisor and the owner.
4. Settle the quantity of reinforcement, and deduct the binding reinforcement loss left by Party B in the binding process according to the drawing quantity. (that is, the binding quantity actually used by Party B for this project)
4. For Party A's odd jobs that are not within the contract scope of the construction drawing (except for the odd jobs that are calculated due to design changes that lead to Party B's rework, the increased costs of other design changes, designated orders and revised orders that do not cause rework are included in the unit price of this contract), Party B must complete the monthly accounts with Party A and join the monthly task list according to the daily working hours of 65,438+00 hours, and Party A and the company will not accept or deduct the odd jobs every other month.
Verb (abbreviation for verb) Responsibilities, obligations and rights of both parties:
(1) Party A
1. Provide necessary safety facilities, production facilities and living facilities.
2, responsible for the coordination between civil engineering, installation and other types of work.
3. Prepare the construction progress plan and provide data such as drawing axis and elevation. Responsible for construction technical disclosure and safety production disclosure.
4, according to the construction progress to do a good job of material supply.
5. The on-site safety officer of the project department is responsible for the safety inspection and guidance of each team, and the on-site builder is responsible for the technical guidance and supervision, coordinating the relationship with other types of work and assisting Party B to do all the work well.
6. Party A has the right to impose a penalty of not less than RMB 65,438+000 each time on Party B's construction personnel who violate the safety production and construction norms, and directly deduct it from Party B's monthly task list. Party A has the right to terminate the contract for those who refuse to mend their ways. If economic losses are caused to Party A, Party B will compensate Party A for all economic losses.
7. The on-site representative of Party A is responsible for overall management.
(II) Party B
1, the organization is between 20 and 45 years old, with strong strength, legal concepts and professional skills, and well-qualified employees enter the site. Adults over 46 years old, weak and unconscious are strictly prohibited from entering the venue.
2. The personnel entering the site must hold the resident ID card, health certificate and other necessary documents, and submit a 1 inch recent photo roster of the employees entering the site. Once registered, it shall not be changed at will. If it is necessary to transfer, it should be reported to the project department for the record.
3, strictly abide by the safety operation procedures, obey the safety education and guidance of the project safety officer and related functional leaders, adhere to the pre-shift education, safety first, enhance employees' awareness of self-protection and ensure safety in production. Who is responsible for production safety accidents?
4, according to the construction budget to the warehouse. Such as waste in construction, resulting in materials exceeding the construction budget quota, the excess will be deducted from labor costs.
5, must be civilized construction, it is forbidden to place materials, materials in the construction area must be controlled and quantified, so that the work is finished.
6. Party B shall be responsible for handling the engineering quality problems caused by steel bar binding. ..
7. For the parts that cannot be transported by vertical transportation machinery, Party B is responsible for the transportation of materials.
8. During the construction, all kinds of cushion blocks shall be installed by Party B, and marble cushion blocks and wall plastic cushion blocks shall be provided by Party A. ..
9. Party B shall send a representative to contact Party A during the construction period.
Six, quality requirements:
1. The quality index of this project reaches Oujiang Cup and meets the technical requirements and specifications of Party A, the supervisor and the owner.
2, quality evaluation in stages, at the same time by the project department for random sampling.
Seven, material saving and tool use:
1, measuring tape, steel scissors and other tools and labor protection articles shall be provided by Party B. ..
2. During the construction period, Party B must clean up the site after work, and whoever works will clean up. At the same time, Party B shall obey the supervision and guidance of Party A, and if it finds waste, it shall be fined not less than that in 500 yuan today depending on the circumstances. If the site is unclear and the finished materials are unclear, Party A has the right to order its team to clean up, and the expenses shall be borne by the responsible team.
Party A:
Party B:
Date of signing:
Reinforcement Work Contract II Party A:
Party B:
Based on the principle of voluntariness and equality, Party A and Party B have reached an agreement through consultation to sign this contract for mutual compliance.
I. Term of the Contract
The term of the contract shall be subject to the project contract signed by the general contractor and the construction party.
Second, the scope of contracting.
1. Contracting method: Party A will contract the buildings of Zhonghao International Star City Phase II 15# and 16# with labor services (excluding straight thread materials and labor services), auxiliary materials, machinery, electroslag pressure welding (materials and services), quality, construction period, safety production and civilized construction. All auxiliary materials (wire binding, shim) and machinery (except vertical transportation machinery, flash butt welding machine, electric welding machine, steel bar bending machine, steel bar cutting machine, straightening machine, electroslag pressure welding equipment, etc.). ) The materials required for construction shall be provided by Party B, and the main materials shall be provided by Party A, and the quota acquisition shall be implemented, and the consumption of all materials shall be controlled according to the quota acquisition.
2. Acceptance of engineering quantity: according to the construction drawing and the completed qualified physical engineering quantity, it shall be accepted according to the quality standards stipulated in this contract, and the acceptance of the project shall be subject to the acceptance opinions of the supervisor, the project quality inspector and the project manager.
3. Work content: preparation before construction, reinforcement sample turning, planning, horizontal and vertical transportation in the yard, raw material unloading, butt welding, blanking, cold rolling, marking and setting out ingredients, bending and binding, classified stacking of labeled semi-finished products, and cleaning up the steel yard to keep it clean. Steel binding is to cooperate with carpenters to build a self-use shelf, clean up the sundries and broken wires in the template, take a semi-finished steel bar from the yard, tie it up and put it in according to the design requirements. Including matching blanking and sampling, fabrication and installation of reinforced cushion blocks, and fabrication and binding of some prefabricated secondary components (concrete pump surplus).
Three. Contract price and adjustment method
Others: steel bar fabrication and binding: according to the construction area of RMB /m2, including electroslag pressure welding, wire binding, shim, flash butt welding machine, electric welding machine, steel bar bending machine, steel bar cutting machine, straightening machine, electroslag pressure welding equipment, etc. This unit price is a comprehensive duty-free lump sum price, including Party B's management fee (including the management fee of the labor service company), workers' entry and exit fees and labor insurance (helmets, raincoats, rain boots, etc.). ), insurance and medical expenses, labor costs, auxiliary materials costs (pads, wires, chalk, covered electrode, etc. ), machinery costs, civilized construction measures, overtime costs, unforeseen costs, profits, etc. And this unit price. If the unit price of hourly work is 50 yuan/man-day, the number of working days issued by the project shall prevail, but it shall not exceed 2% of the total settlement price. This contract adopts the comprehensive unit price, which is fixed. The unit price includes safety risk premium, and the risk range refers to the accident risk caused by Party B's illegal operation. This unit price has included design changes. When design changes are increased or decreased, the unit price will not be adjusted. The above unit prices are all high-quality projects. If the acceptance of government quality-related parts is due to Party B's failure to meet the above standards, the total contract price will be reduced by 65,438+00%.
Four. Payment and settlement of project funds
1, all construction personnel sign in twice every morning before leaving work and before going to work in the afternoon. The attendance sheet shall be kept by Party A and submitted to the general contractor.
2. Each worker shall sign a labor employment agreement with Party A, which shall be supervised and implemented by the general contractor.
3. Every time the project payment is made, the subcontractor shall prepare the workers' payroll according to the attendance sheet and the labor employment agreement. The payroll shall be signed by the general contractor, the project manager of Party A, the subcontractor's team leader and the workers themselves, and shall be paid by the ID card after being handprinted.
The above three items are indispensable as the basis for project payment. Only when the workers' wages are paid and there is no dispute can the project payment paid to the subcontractor be settled (after deducting the paid workers' wages and all taxes or fines that should be collected by the competent department and paid by Party A on behalf of Party B, the rest can be paid to the contractor).
4. Pay 15% of the total contract price within 30 days after the acceptance of the foundation works of the contract project. No progress payment exceeding 0.000 shall be paid before the concrete pouring of the foundation project and its basement roof is completed. 1 1+ 1 During the acceptance of the small high-rise main project, the project payment shall be paid in installments according to the unit project. Pay 7% of the labor cost agreed by the unit within 30 days after the concrete pouring of the four-story building structure is completed. Pay 7% of the labor cost agreed by the unit within 30 days after the concrete pouring of the seven-story building structure is completed. Pay 7% of the agreed labor cost of the unit within 30 days after the concrete pouring of the ten-story building structure is completed. Pay 14% of the project price of the unit within 30 days after the acceptance of the main project. Pay 10% of the project price of the unit within 30 days after the external scaffold is dismantled. The five major contractors shall pay 10% of the project price within 30 days after the completion acceptance. The balance shall be paid after the main body is completed and accepted.
Through negotiation between Party A and Party B, the normal construction of this project will be settled according to the settlement method agreed in the contract signed by both parties. If there is a dispute in the middle, and the workers leave the site before the completion of the construction, or are dismissed by Party A or the general contractor and subcontracting team, Party A will pay the daily wages of technicians and ordinary workers (unskilled workers) yuan according to the above conditions, and the labor service agreement will be terminated after the payment is completed. This team has nothing to do with Party A, the project department and the general contractor.
Verb (abbreviation of verb) Working conditions and labor protection
According to the actual situation of Party B's post, Party A shall provide Party B with dormitories and canteens as agreed in the labor contract (the meals shall be borne by Party B).
Inadvertent Verb Party B's Responsibilities and Obligations
1. Party B shall abide by national laws, regulations, construction specifications, safety and other rules and regulations.
2. If Party B violates labor discipline and relevant rules and regulations, Party A may criticize, educate and punish Party B until the labor contract is terminated.
3. Party B must provide Party A with the list of personnel entering the site, personal photos, copies of ID cards, qualification certificates of employees and certificates of technicians, and ensure that the ideological quality, technical quality and physical quality of the personnel entering the site can meet the needs of the project undertaken. The personnel entering the site must be 18 to 45 years old.
4. Party B shall pay a performance bond of RMB 10000 when entering the site, which will be refunded by Party A when the main structure is completed.
5. Machines used by Party B's construction personnel, such as steel bar bender, steel bar cutter, straightener, electric welding machine, flash butt welder, etc., and auxiliary materials, such as covered electrode, tie wire, pad, tape measure, inverted chain, wires from secondary distribution box, iodine tungsten lamp, etc., are provided by Party B to meet the construction needs, and Party A does not provide any machines and tools.
6. Party B must organize a capable team of skilled workers and professional construction management personnel according to the needs of the project progress, and complete the construction tasks assigned by Party A in advance with good quality and quantity. If Party A fails to meet the requirements of quality and construction progress, Party A has the right to change teams.
7. Party B must organize the construction according to the current relevant construction technical specifications and procedures and Party A's requirements. Abide by Party A's rules and regulations and relevant national laws and regulations, obey the supervision, coordination and deployment of site management personnel, do not leave the site at will, and prohibit the use of child labor. In case of violation of the above provisions or accidents, Party B shall bear all economic losses and responsibilities.
8. Party B must abide by the national, local and project regulations on safe production and civilized construction, give priority to safe production, and do not violate the rules. Construction personnel entering the site should take strict safety protection measures to ensure their own construction safety. Party B shall be responsible for the accidents caused by ineffective safety measures or Party B's own reasons, and all expenses arising therefrom shall be borne by Party B. At the same time, Party B shall assist Party A to jointly create a civilized construction model site.
9. Personnel entering Party B's site shall bring their own living expenses (at least one week's living expenses). Party B's personnel shall not stay at the construction site with their families.
10, all employees must receive safety production and vocational post training, and the certificate-holding rate of special jobs reaches 100%. Before entering the site, the work permit for special type of work must be submitted.
Seven, time limit for a project, quality, finished product protection, civilized construction, material recipients.
1. Time limit: Party B promises to organize the construction according to the time limit plan prepared by Party A on-site arrangement. For each day of delay, Party B shall bear all kinds of losses of Party A, and Party A will impose a fine of 5,000 yuan/day (except for force majeure factors) according to the specific circumstances, and all of them will be accumulated.
2. Quality: The quality goal of this project is to ensure the "Yu Xiang Cup" standard and strive for the "Yangtze Cup" standard. Party B shall strictly control the quality of its internal construction. It is required that the sub-item acceptance reaches 65,438+000%. If the quality fails to meet the design requirements, the rework cost shall be borne by itself, and the settlement unit price shall be calculated according to the contract unit price 10%.
3. Protection of finished products: Party B shall assist Party A to take measures to protect finished products. If Party B's personnel are found to have artificially damaged the finished product, Party A will impose a fine of 5 times depending on the degree of damage. Unintentional damage should be compensated and punished according to the degree of damage.
4. Civilized construction: Party B shall assist Party A in the civilized construction on site. In the process of construction, if the site is not cleared after the completion of construction, or materials are wasted due to Party B's reasons, Party A will impose a corresponding fine according to the specific situation, and compensate Party A according to 1.5 times of the total value of wasted materials. Party A will impose a fine of 200 ~ 2000 yuan according to the specific situation, and the contract unit price of completed quantities in that month will be reduced by 65,438+00%.
5. Environmental protection: Party A is responsible for regularly or irregularly educating and training Party B's personnel on occupational safety, health and environmental protection. Be responsible for the management, supervision and inspection of Party B's occupational safety and health and environmental protection according to the relevant regulations on safety production in engineering construction and the requirements of the company's environmental occupational safety and health management documents. Party A shall not require Party B to work in violation of safety management and environmental protection regulations, and shall be responsible for supervising and inspecting Party B's distribution of labor protection articles to on-site employees according to regulations. Party B shall distribute labor protection articles to its on-site employees according to the standards stipulated by Party A. If Party B fails to distribute labor protection articles according to the regulations, Party A will distribute them and use them, and the expenses of labor protection articles will be directly deducted from Party B's project payment. Party B shall abide by the regulations on safety in production in engineering construction and Party A's requirements on environment and occupational safety and health, and accept the supervision and inspection of relevant personnel of Party A at any time. Take necessary safety, health and environmental protection measures. Eliminate hidden dangers of accidents and pollution hazards to the environment. The safety and environmental accidents caused by Party B's ineffective measures shall be borne by Party B, and the construction period shall not be postponed. Party B shall educate employees in the workplace about safety and environmental protection, and be responsible for their safety and health.
6. Picking: On the premise of ensuring the quality, Party A and Party B control the materials, and Party B picks the materials according to the quota. According to the rebar material list reviewed by the rebar inspector of Party B and the project leader of Party A, it is absolutely not allowed to waste or use more materials, and the actual rebar should be saved by 3% on the basis of the material list. Steel scrap shall not exceed 0.5% of the total. If the materials beyond the picking range are borne by Party B, Party A will deduct them according to the unit price in the steel bar supply contract at the time of settlement. Party B shall be responsible for the daily maintenance of processing equipment. ..
7. Safety in production and occupational safety and health: put an end to major casualty accidents and minimize general industrial accidents. Party A shall make safety disclosure for the project undertaken by Party B, put forward clear safety requirements and conduct safety supervision and inspection. Party B must implement relevant safety production and occupational safety and health systems and operating procedures, and conduct civilized construction during the construction process. Party B must observe the rules and discipline, carry out the construction safely, and shall not operate illegally, command illegally or violate labor discipline. In the event of a safety accident, if the main responsibility and direct responsibility lie with Party B, Party B shall be responsible for compensating all casualties, accident handling expenses and fines arising therefrom; If Party B bears secondary responsibility, Party B shall be responsible for the compensation for casualties and the aftermath, and Party A shall compensate Party B according to the size of the responsibility.
Eight. others
1. The travel expenses of all local construction personnel of Party B shall be settled by Party B itself, and Party A shall not bear them.
2. Except for the exit caused by Party B and the unfinished project caused by breach of contract, Party B shall bear all the direct and indirect economic losses caused to Party A, and Party A reserves the right to claim compensation. If Party A violates this contract, the losses caused to Party B shall be borne by Party A. ..
3. During the construction period, Party B shall educate employees to abide by laws and regulations and the comprehensive management requirements of local and on-site areas. If any illegal fight is caused by Party B's reason (whatever the reason), Party A will not mediate and hold Party B accountable by means of economic punishment. The first fight will be fined 5,000 yuan, and the second fight will leave unconditionally, and the remaining quantities will not be settled, which will be regarded as a fine, and Party B will bear all the responsibilities for the impact and reputation of the unit.
4. If Party B fails to complete the work in the contract, Party A will punish it. If it is the work content in the contract, Party A's project foreman will issue a time work order, which is invalid and will not be recognized.
5. Party B is responsible for the cross-finishing project and completion maintenance. If Party B fails to reply three days after Party A notifies Party B, Party A has the right to handle it by itself, and all expenses shall be borne by Party B. ..
6. Party B's construction personnel must wear safety helmets, otherwise each person will be fined 50 yuan every time.
7. Party B's construction personnel must wear badges, otherwise each person will be fined 20 yuan every time.
8. Party B's construction personnel entering the site shall not steal any items on the construction site. Once found, it will be punished by 200 times its value and deducted directly from the project settlement.
9. Party A's management personnel arrange Party B's construction personnel to work overtime, and Party B must unconditionally accept the arrangement. Those who do not obey the arrangement of Party A's management personnel will be fined 5000 yuan for the first time, 10000 yuan for the second time, and Party A has the right to order Party B to leave unconditionally for the third time. No settlement will be made for the completed quantities of the team dissolved by the project.
Nine. termination of labor contract
Party A may terminate this Contract if Party B is in any of the following circumstances through negotiation between Party A and Party B:
1. During the probation period, Party B is found to be unqualified for employment;
2. Party B seriously violates labor discipline or Party A's rules and regulations;
3. Party B seriously neglects his duty and engages in malpractices for personal gain, thus causing great damage to the interests of Party A;
4, a serious violation of safety operation procedures, incorrigible, and cause major safety accidents, but also must bear all the losses;
5. Serious violation of construction drawings, change of negotiation, national, local and industry standards, resulting in major quality problems or quality and safety hazards, in addition to the termination of the labor contract, bear all labor and material losses;
6. The construction technical force is insufficient, and the project progress is seriously lagging behind.
X. Liability for Breach of Labor Contract Any party who violates the Labor Contract shall pay liquidated damages.
Party A:
Party B:
Date of signing:
Reinforcement Work Contract 3 Party A:
Party B:
According to the Economic Contract Law of the People's Republic of China, the Labor Law of People's Republic of China (PRC) and the Regulations on the Contract of Construction and Installation Projects, combined with the company's system and specifications and the specific design and requirements of this project, both parties signed the labor service construction contract on the basis of equality, voluntariness and consensus, and abided by them jointly.
Article 1: Project Overview
1-1project name:
1-2 Project location:
Structure of 1-3:
Article 2: Scope and other contents of labor contract
2- 1 labor contract mode: contract workers without materials.
2-2 scope of labor contract: the whole process of manufacturing, installation and binding of all reinforcement works from floor to roof, including ancillary structures above the roof, etc. , in order to achieve the purpose of formwork support and concrete pouring in the next process. Including the reinforcement engineering of the alteration project and the fabrication, installation and binding of the reinforcement engineering of the beam, wall, plate, column, prefabricated member, roof gutter cover plate and tower crane foundation of the secondary post-pouring belt until it is qualified.
2-3 Other contents of the labor contract (the charges for the following contents of the contract are all within the total contract price)
Figure 2-3- 1 Calculation of steel material list
2-3-2 Material unloading in reinforcement engineering. (including on-site material transfer)
2-3-3 Manufacture and bedding of protective layer and reinforcement of horse stool.
2-3-4 Reinforcement mechanical installation, site leveling, mechanical positioning, and specialist operation.
2-3-5 Responsible for arc welding, flash butt welding and mechanical connection of conduit. Install the casing manually (the labor cost of electroslag welding is calculated separately and can be included in the total contract price).
2-3-6 Listing, stacking and covering of raw materials and finished products of steel bars.
Figure 2-3-7: Pre-embed all kinds of holes and related parts of reinforcement, and conduct secondary binding.
2-3-8 Self-provided small machinery and labor protection articles.
2-3-9 During steel binding, scaffolding shall be erected, dismantled, classified and neatly stacked.
2-3- 10 site cleaning, coordination of civilized construction site and civilized construction.
2-3- 1 1 Responsible for compensation for requisition, return, damage, waste and loss of machines, tools and appliances. (If machinery and auxiliary materials are contracted to Party B, the expenses will be calculated separately and can be included in the total contract price. )
2-3- 12 quality shall be implemented according to relevant national standards, and construction shall be carried out according to design requirements. Party B shall bear the deductions, fines, rework fees and related responsibilities that are not up to standard.
2-3- 13 undertakes all the safety expenses and related responsibilities of the team, including the expenses of theft and fighting.
2-3- 14 is responsible for safety technical disclosure to the workers in this shift.
2-3- 15 to undertake the manufacture and installation of embedded iron pieces such as stair treads and railings.
2-3- 16 undertakes the responsibilities and expenses of safety, quality, progress and civilized construction caused by non-conformity.
2-3- 17 The accommodation, utilities and other expenses of the workers in this shift can be included in the total contract price (except those provided by Party A).
2-3- 18 is responsible for the post-laying trench, derrick, main elevator, chute, stepping, post-laying stairs and other legacy projects.
Article 3: Contract duration of this project
4-65438+ In case of quality accident, a fine of 50- 1000 yuan will be imposed depending on the circumstances. The cost of rework and materials shall be borne by Party B. In case of a major quality accident, Party B shall be ordered to leave the site, the labor cost shall not be settled, and all economic losses shall be compensated.
4-2 During the construction, Party B must protect the finished products and formulate the protection measures for the finished products in advance.
4-3 Construction requirements and quality acceptance standards shall be implemented according to the relevant regulations of the company.
Article 4: Contract Price and Payment Method
5- 1 Contract Price and Calculation Basis
5- 1- 1 No matter how many steel bars there are in this project, how difficult it is.
Party A:
Party B:
Date of signing:
;