In today's society, people gradually realize the importance of reporting, and reporting has the characteristics of being written afterwards. You didn't have a clue when you wrote the report? The following is the project fund application report I collected and sorted out, hoping to help everyone.
Project Fund Application Report 1 xx Municipal Water Conservancy Bureau:
Our village, xx Town, xx City, is located in Taiyuan District in the north of the city, with an existing population of xx people and an area of xx mu. There are xx villagers' groups and xx households. The main cash crops are cotton, wheat, corn and asparagus. The main source of villagers' income is crop income.
For many years, due to poor water conservancy conditions, it is difficult to irrigate wells normally, which leads to the stagnation of agricultural production and the low income of villagers. Although our xx village is the seat of xx town, the village collective economy is still very poor, and the villagers' income is very small. The existing mechanical wells in the village are far from meeting the irrigation needs of crops. Coupled with frequent local droughts, the situation of water conservancy irrigation is even worse, which brings huge losses to villagers and serious waste of water resources. The majority of villagers strongly hope to completely change this situation as soon as possible, change production and living conditions, fundamentally get rid of poverty, embark on a well-off road as soon as possible, and solve the difficulties of agricultural irrigation as soon as possible. In order to fundamentally change this situation, increase farmers' income and solidly promote the construction of new countryside. According to the suggestion of relevant experts, we plan to build a water-saving park in our village to effectively improve the irrigation conditions of agricultural production in our village.
The water-saving park project we implemented covers an area of xxx mu. According to the accounting of relevant technical personnel, it needs xxx yuan per mu, and the total amount of funds required is more than xx yuan. At present, it is difficult for some villagers to raise funds, and there are still vacancies of more than xx yuan. Therefore, please ask the superior leaders to understand and give appropriate support. Thank you again for your great concern and support for our xx village. By hiring
No, please indicate.
Applicant:
20xx year xx month x day
2 jiangdong district Municipal People's Government Project Fund Application Report:
With the implementation of the "six acceleration" strategy in Ningbo, the marine economy has accelerated, and the tasks of our bureau have increased this year, and the funds for investigation, research and meetings have increased. Because there is no budget for these work funds at the beginning of the year, there is a certain gap in the current 20xx annual work funds. It is proposed to apply for additional work funds of 350,000 yuan, including the work funds of the "Six Accelerations" leading group office, the marine economic development, the research funds of the 20xx economic and social development ideas, the research funds of the modern core city index system, and the annual expert consultation meeting and activities. The district government is invited to approve and agree to allocate funds.
No, please reply.
Applicant:
20xx year xx month x day
3. Report on application for project funds of Finance Bureau:
My town, Qinglian Village, is next to Shengli Town Highway. It was built in April of 20xx, with a total length of 2 kilometers. Some roads are mud and gravel roads, and some roads are dirt roads. Due to various reasons such as funds, it has been in disrepair for a long time. In addition, many rainstorms caused serious damage to the highway, which seriously affected the normal production, farming and life travel of nearly 1030 people along the route. The crowd reacted very strongly.
In view of the above situation, our town plans to harden village-level roads. At present, various ways have been adopted to promote the launch. Villagers and some villagers have donated 1.6 thousand yuan, and there is still a funding gap of more than 300 thousand yuan. I sincerely hope that the county bureau can solve it.
No, please instruct!
Xx people's government
20xx65438+February 9th
4 xxx County Finance Bureau Project Fund Application Report:
Yinhe Agricultural Planting Farm in xxx County is located in Jingtou and Beixianquan Village, my township head, with a planned project area of 1.47 square kilometers. The plantation plans to build a sustainable agricultural industrialization circular economy project, focusing on the integration of urban and rural areas such as green seedling base, high-quality dry and fresh fruit planting demonstration, characteristic breeding demonstration, facility agriculture, agricultural holiday and leisure sightseeing, and comprehensive energy development and utilization. The plan will be completed in three to five years. The construction of the project will be characterized by efficient use of resources and environmental friendliness, with the goal of green, ecological and sustainable development of circular agriculture industry projects.
The construction of the project will also connect the first, second and third industrial chains, which will play a good leading role in building a harmonious agricultural ecosystem, promoting the development of regional agricultural industrialization, increasing farmers' income and building a new socialist countryside, and has far-reaching social significance.
In this year's irrigation and water conservancy construction, professional planting farms have transferred 2,200 mu of land in Changjingtou, Beixianquan and Shuiquanzhuang villages by means of land contractual management right transfer, built 2 new reservoirs, laid 4,000 meters of water diversion pipes, built 0/00 solar greenhouses/kloc, and built more than 8,000 meters of supporting pipe networks. The new drilling depth reaches 380 meters. Up to now, the total investment of the project has reached more than 5 million yuan, and the company has raised funds by itself.
Project fund application report 5 Dear Water Conservancy Bureau xx:
There are now more than 300 people in Shi Mao, Daizishan and Minjiawan of Yangjialong Village, Huangtuzui Town, north of Liling City. More than 90 mu of grain needs to be irrigated by retreating water, and there are 4 fish ponds (about 12 mu). For a long time, its main crop is rice, and the main source of income for villagers is crop income.
Yangjialong Village, Shi Mao, Daizishan and Minjiawan are three groups of backbone canals, which originate from Shimao and end at Yunzhuwan, with a total length of about 1.200m and an irrigation area of about 200mu. Since the establishment of the group, the canal has made great contributions to the agricultural production and economic development of the group. In recent years, with the issue of "agriculture, countryside and farmers" put forward in China, the economy of our village with agriculture as its main industry has developed rapidly, and people are paying more and more attention to people's livelihood. As a pillar industry of our village's economic development, agriculture has played an important role in promoting our village's economic development.
Since XX years, on the one hand, due to the construction of national highways, railways, village roads and group roads in some sections of Shi Mao, Daizishan and Minjiawan, some available labor forces have been requisitioned, and villages and groups are raising funds to build cement roads, which have not yet been completed. Most of the villagers' funds were invested in road construction, and the canals that were not hardened with concrete were delayed again and again. On the other hand, due to the disrepair of water conservancy facilities in Shi Mao and other groups in our village, many places collapsed and leaked seriously, especially in the canal source section, and the damage was even more serious. Faced with the original wells and canals, villagers often fight for them, which makes it difficult for them to carry out normal agricultural irrigation. In this context, the irrigation of more than 200 mu of farmland of Shi Mao and other groups cannot be guaranteed. Agricultural production is stagnant, and the income of group members is very small, which directly leads to the differences in regional economic development in our village and the competition for irrigation water sources, forcing many members of my three groups to leave their homes and go out to work, and then there are more and more left-behind elderly people and left-behind children, and the young labor force flows out accordingly, and even the phenomenon of "empty nest" appears. Our group has gradually become the weakest link under the policy of "agriculture, countryside and farmers" in Yangjialong Village. With the intensification of the vicious circle, the problems of three "agricultural difficult groups" in our village need to be solved urgently!
According to preliminary estimation, the reinforcement and reconstruction project covers an area of 90 mu. According to relevant accounting, the capital required per mu is 2,500 yuan, totaling more than 200,000 yuan. Up to now, the road construction project of three groups of roads in our country has not been completed, and the village Committee is unable to allocate funds, so it is really difficult to implement the funds. In desperation, I hereby apply, and urge my superior xx to investigate and consider and give appropriate support! All the members of Shi Mao, Daizishan and Minjiawan express their heartfelt thanks for your support!
Applicant: xxx
Xx,xx,XX,XX
6 county development and Reform Commission project fund application report:
Xx village is located 8 kilometers northeast of xx town, belonging to the deep mountain area of xx town, with a natural area of 9.6 square kilometers, 19 villagers' groups and a population of 20 16. Group xx belongs to the village department of xx where the school is located. Residents in this group 136, students 106. Because this group is located in Ling Gang, most farmers live on the hillside, and people and animals need to drink water from the low-lying places below the mountain. However, the low groundwater level and poor water quality directly affect the drinking safety of local residents. Over the years, the group has had difficulty in using water, and has repeatedly asked the government to invest in drilling a deep well according to the safe drinking water standard to solve the drinking water safety of their people and animals. Therefore, the village Committee decided to declare xx group drinking water project for people and animals. Standard of water well: the opening diameter is 3m, and the depth is not less than 25m. The structure is brick-concrete structure and reinforced concrete frame.
Construction standard: It shall be built according to the engineering standard of Gao Xiao Pumping Tower.
Construction method: The village committee will invite public bidding, and select a professional engineering team with well drilling qualification to contract.
Capital budget: * * The total cost is 45,000 yuan.
The funds required for the above projects are * * * 45,000 yuan, and the county development and reform commission is invited to establish the project according to the relevant national policies.
Xx town xx village Committee
20XX May 20th
Project fund application report 7 xxx Leader:
According to the traditional practice of the industry, traditional festivals (Mid-Autumn Festival and Spring Festival) need to strengthen the horizontal communication of the external environment of enterprises. Maintain good interaction and communication with the competent department of the enterprise. To this end, the property company suggested the following:
1. Visitor: General Department of Municipal Housing Management Bureau, Property Service Center, Property Management Association and Z Police Station.
2. Gift form: Z gift card: 4600 yuan.
3. Banquet units: Municipal Housing Authority, Municipal Materials Association and Z Police Station.
Banquet venue: arranged at the carnival
To this end, the property company applied for a holiday fee of 4,600 yuan.
No, please instruct!
I am here to convey
Salute!
Applicant: xxx
20xx year x month x day
8. Lead the project fund application report:
I have been working in XXX since graduation, which has been more than half of XXX years. Has been serious, and strive to do a perfect job, for the development of the company to do their due responsibility. In addition, while doing a good job, I will take various training exams, such as XXX, to contribute to the future development of the company.
After careful consideration, I hereby ask you for a raise for the following reasons:
1. At present, my work contents include: business documentary assistant, external accessories operator, and assisting office back office work. As an assistant merchandiser, where do I need to go? This is busy with another, and a lot of work content has caused my current working state: I am not free when the salesman is busy, and I am busier when the salesman is busy.
2.XXX is one of the larger foreign companies in Xuzhou, but my salary is XXX (after-tax XXX), which is far lower than the average monthly salary of the whole city. There are fewer and fewer foreign orders that can bring me extra income, and the average monthly commission this year can only reach XXX/ month. Together, they are still lower than the minimum monthly salary in Xuzhou.
3. Taking the salary level of XXX employees as a parallel reference, the comparison results are as follows: I do more work with the same salary; It's still the same job, but my salary is very low.
Based on the above actual situation, I urge the leaders to inspect and agree to give me a salary increase.
I am here to convey
welcome
xxx
Xx,xx,XX,XX
Project fund application report 9 Dear leader,
Xunxian Mei Jie Water Washing Factory was established in XX with a registered capital of1100,000 yuan. Mainly engaged in medium-sized hotels, restaurants, clothing factories and other linen, cloth, finished and semi-finished clothing washing, ironing business. Legal Representative: ddxd, located at the interruption of Weihe Road in Xun County, with more than 30 employees.
Over the years, our factory has continuously improved its technology, invested a lot of resources and introduced many advanced washing equipment. Now there are four washing machines, three dryers, one ironing machine, three transport vehicles and two business contact vehicles.
The main customers come to hotels, restaurants and garment factories in Hebi New District of Xun County and its surrounding areas. The annual output value of our factory in XX and XX reached more than 2 million RMB.
In recent years, our factory has made great efforts to learn the advanced washing technology at home and abroad, keep the market information channels unobstructed, actively learn from the operating experience and innovation ability of the international market, and never lower the price in order to gain market share, which eventually leads to low profit, low profit or even loss-making operation. He Xianping, director of our factory, personally led technicians to Zhengzhou, Changyuan, Zhoukou and other places to learn and learn from advanced technology, advanced equipment and advanced management methods, which benefited a lot. At the end of this year, we plan to go to Shanghai Machinery Factory to learn new machine technology and buy the latest washing equipment, so that the advanced equipment of the enterprise can generate more profits.
Based on the tenet of "quality first, unity and pragmatism, innovation and high efficiency", our factory can provide the best service according to customers' needs at the fastest speed, and it is our eternal goal to provide customers with value-added products and services. Today, the healthy growth of Mei Jie Water Washing Plant depends on the strong support of customers for many years. In the future, we will constantly improve our internal management level, keep up with market changes, innovate constantly, improve our service quality and provide more benefits to our customers.
The development of hotel catering service industry has brought us new development opportunities. It was by seizing this opportunity that we decided to expand production. The estimated land area of this investment is about 10 to 20 mu, with a total investment of 5 million yuan. It is estimated that the annual output value after delivery will reach100000 yuan, and the annual tax revenue will reach100000 yuan. The workshop covers an area of about 3000 square meters. The warehouse covers an area of about1500m2. This office building covers an area of about 500 square meters. The staff dormitory covers an area of about 500 square meters. There are two workshops in the factory area, each covering an area of about 1500 square meters. It can solve about 200 laid-off workers.
After the new plant is put into operation, it will form a washing service processing base in Xunxian industrial cluster, radiating Hebi, hua county, Qixian, Tangyin and Puyang, and making more contributions to Xunxian's economic construction.
I hope the government departments will give support! thank you
I am here to convey
Salute!
xxx
Xx,xx,XX,XX
Project Fund Application Report 10 County Finance Bureau:
Shangbu Town is located in the southeast of Pingxiang City, 30 kilometers away from the urban area, with an area of 76.9 square kilometers. Jurisdiction 1 1 administrative village, 2 management offices and 5 residents' clubs with a population of 38,000. In recent years, with the support of higher authorities, our town has continuously strengthened the construction of rural roads, and the village-level road network has been continuously improved. More than 300 kilometers of roads have been hardened, and the roads between towns, villages and village groups have been completed, with more than 75% of joint roads. The construction of rural roads has strengthened the transportation industry, promoted the sustainable development of the electric porcelain industry in our town, and provided strong support for the economic upgrading of the town. However, the transportation industry has caused some damage to rural roads. According to statistics, there are nearly 20 kilometers of cement trucks in the town in urgent need of maintenance, and * * * needs more than 300,000 yuan of village-level road maintenance funds to apply for reporting. In view of the financial difficulties at the township level, we now request the superior to solve the rural highway maintenance fund of 6.5438+0.5 million yuan.
No, please indicate.
xxx
Xx,xx,XX,XX
;