What contents should be included in the construction monitoring plan compiled by the construction unit?

The construction monitoring plan prepared by the construction unit shall include the following contents:

The content is as follows:

1, stress monitoring of steel structure.

2, large-scale construction engineering stress change monitoring.

3. Structural health monitoring.

4. Monitoring of foundation pit.

5. Monitor the pouring temperature of concrete.

6. Tracking and dock monitoring.

7, tunnel surrounding rock displacement monitoring, etc.

Construction monitoring is an intelligent behavior that integrates testing, calculation, analysis and decision-making, and must be guaranteed by perfect organization.

In the process of construction, the following points should be noted:

1. safety: ensure that the site meets safety standards, including providing necessary safety equipment and training for workers.

2. Quality control: ensure that all materials and work meet the specified standards, so as to ensure that the final product meets the quality requirements.

3. Time plan: Establish a clear timetable and milestones to ensure that the project is completed on time.

4. Budget management: Monitor the cost to ensure that the project will not overspend.

5. Communicate with relevant parties: keep in touch with customers, contractors, designers and supervisors to ensure that they understand the progress and solve any problems in time.

6. Environmental protection: Abide by local environmental laws and regulations during construction to minimize the impact on the environment.

7. Change management: Any change request shall be recorded in time and properly evaluated to ensure that the final result meets expectations.