Dental clinic set up feasibility study report how to write will not be so traditional

Generally speaking, the feasibility study report includes these contents:

1, the necessity of investment

Mainly based on the results of market surveys and forecasts, as well as relevant industrial policies and other factors, to demonstrate the necessity of the project investment and construction.

2, technical feasibility

Mainly from the technical point of view of the implementation of the project, the rational design of technical programs, and comparison and evaluation.

3, financial feasibility

Mainly from the perspective of the project and the investor, the design of a reasonable financial program, capital budgeting from the perspective of corporate finance, evaluation of the project's financial profitability, investment decision-making, and evaluation of shareholders' investment returns from the perspective of the main body of the financing (enterprise), cash flow plan and debt repayment ability.

4, organizational feasibility

Developing a reasonable project implementation schedule, designing a reasonable organizational structure, selecting experienced managers, establishing good collaborative relationships, and developing appropriate training programs to ensure the smooth implementation of the project.

5, economic feasibility

Mainly from the point of view of resource allocation to measure the value of the project, evaluation of the project in the realization of the objectives of regional economic development, the effective allocation of economic resources, increase supply, create employment, improve the environment, improve people's lives and other aspects of the benefits.

6. Social feasibility

Mainly analyze the impact of the project on the society, including political system, policy, economic structure, law and morality, religion and ethnicity, women and children and social stability.

Another attached a hospital project feasibility study template for reference.

Chapter 1 General Introduction

1.1 Project Overview

1.2 Basis and Scope of Preparation

1.2.1 Basis of Preparation

1.2.2 Scope of the Study

1.3 Main Conclusions

1.4 Recommendations

Chapter 2 Background and Necessity of Project Construction

2.1 Overview of the Project Area

2.2 Overview of the Hospital

2.2.1 Name of the Project

2.2.2 Selection of the Project Site

2.2.3 Grade of the Hospital

2.2.4 Planned Total Beds

2.3 Proposition of the Project

2.4 Necessity of the Project Construction

2.4 .1 Need to implement the "Opinions of the Central Government and State Council on Deepening the Reform of Medical and Health Care System"

2.4.2 Promote the coordinated and sustainable development of the local economy and society

2.4.3 Need to meet the increasing demand for medical services of the people

2.4.4 Objective need to build a regional center city

2.4.4 Need to build a regional center city

2.4.4 Need to build a regional center city

3 Objective needs

2.4.5 The project is needed to promote the development of local industries

2.4.6 The project is needed to realize the basic modernization of medical and health care in Guang'an area

Chapter 3: Forecast of Medical Services

3.1 Development Plan of Medical and Health Care Services

3.1.1 The National 12th Five-Year Plan for Medical and Health Care Services

3.1.1 The national " Twelfth Five-Year Plan"

3.1.2 Main Tasks of Sichuan Province during the Twelfth Five-Year Plan Period

3.1.3 Local Health Care Development Plan

3.2 Analysis of Local Medical Resources

3.2. 1 Local medical resources

3.2.2 Analysis of local bed shortage

3.2.3 Current status of hospital medical services

Chapter 4 Construction Scale and Construction Contents

4.1 Construction Scale

4.1.1 Overall planning of the hospital

4.1.2 Analysis of the reasonableness of the construction scale

4.2 Construction Content

Chapter 5: Site Selection and Construction Conditions

5.1 Site Status

5.1.1 Site Location

5.1.2 Land Ownership and Land Area

5.2 Site Conditions

5.2.1 Topographic and Geomorphologic Conditions

5.2.2 Geological Conditions

5.2.2 Site Engineering Conditions

5.2.3 Economic and Social Conditions

5.2.4 Infrastructure Conditions

5.3 Conclusion of Site Selection

Chapter 6 Construction Program

6.1 General Layout Design

6.1.1 Principle

6.1.2 General Arrangement

6.2 Construction Program

6.2.1.2 General Arrangement

6.2.2.1 General Arrangement of Construction 6.2.1 Design Basis

6.2.2 Building Profile

6.2.3 Elevation Design

6.2.4 Building Materials

6.2.5 Accessibility Design

6.3 Structural Program

6.3.1 Design Basis

6.3.2 Design Load

6.3.3 Seismic Resistance

6.3.1 Design Basis

6.3.2 Design Load

6.3.2 Design Loads

6.3.4 Structural Forms

6.3.5 Main Materials Used

6.4 Water Supply and Drainage Program

6.4.1 Design Basis

6.4.2 Design Scope

6.4.3 Water Supply System

6.4.4 Storm Sewerage System

6.4.5 Pipeline p>6.4.5 Recommended Materials for Piping

6.5 Electrical Engineering

6.5.1 Design Basis

6.5.2 Design Scope

6.5.3 Side and Distribution Systems

6.5.4 Lighting System

6.5.5 Laying of Wires

6.5.6 Lightning Protection for Buildings

6.5.6 Lightning Protection for Buildings

6.5.7 Earthing Protection Measures

6.5.8 Weak Electricity System

6.6 HVAC Engineering

6.6.1 Design Basis

6.6.2 Design Scope

6.6.3 Air Conditioning Design

6.6.4 Ventilation Design

6.6.5 Smoke Exhaustion

6.7 Fire Protection Engineering

6.7.1 Design Basis

6.7.2 Building Category and Fire Resistance Class

6.7.3 Building Fire Protection

6.7.4 Electrical Fire Protection

6.7.5 HVAC Fire Protection

6.7.6 Water Supply and Drainage Fire Protection

6.7.7 Configuration of Fire Extinguishers of the Building

6.8 Outdoor Supporting Works

6.8.1 Water Supply Pipeline Network

6.8.2 Drainage Pipeline Network

6.8.3 Electricity Communication Pipeline Network

6.8.4 Hardening of Grounds

Chapter VII: Energy Saving

7.1 Energy Saving Principle

7.2 Design Basis

7.3 Reasonable Energy Consumption Standards and Project Energy Consumption

7.3.1 Reasonable Energy Consumption Standards

7.3.2 Analysis of Project Energy Consumption

7.4 Energy Conservation Measures

7.4.1 Energy Consumption Technical Measures

7.4.2 Energy Consumption Management Measures

Chapter VIII: Evaluation of Environmental Impacts

8.1 Environmental Impacts Evaluation Basis

8.2 Environmental Impact and Treatment during Construction Period

8.2.1 Environmental Impact Factors during Construction Period

8.2.2 Environmental Protection Measures during Construction Period

8.3 Environmental Impact and Treatment during Operation Period

8.3.1 Analysis of Medical Pollution Sources

8.3.2 Various Pollution Treatment Measures

8.4 Greening

8.5 Environmental Protection Management

Chapter 9 Labor Safety and Health

9.1 Basis of Preparation

9.2 Labor Safety

9.2.1 Main Hazardous Factors and Degree of Hazard

9.2.2 Labor Safety Precautions

9.2.3 Safety Protection

9.3 Sanitation

9.3.1 Water Supply and Drainage Sanitary Protection

9.3.2 Medical Waste Sanitary Protection

9.3.3 Noise Sanitary Protection

Chapter 10 Engineering Construction Management Program

10.1 Project Organization

10.2 Project Organization and Management

10.2.1 Program Management

10.2.2 Quality Management

10.2.3 Financial Management

10.2.4 Progress Management

10.2.5 Data Management

10.3 Project Construction Management

10.3.1 Responsibility System of Project Legal Person

10.3.2 Project Fund Management System

10.3.3 Project Bidding System

10.3.4 Project Engineering Supervision System

10.3.5 Project Contract Management System

Chapter 11: Project Implementation Progress

11.1 Construction Duration

11.2 Implementation Progress Arrangement

Chapter 12: Bidding Program

12.1 Basis for Preparation of Tendering Program

12.2 Principles of Tendering

12.3 Scope of Tendering

12.4 Form of Tendering Organization

12.5 Tendering Methods

Chapter 13 Investment Estimation

13.1 Basis for Preparation

13.2 Scope of Investment Estimation

13.3 Investment Estimation

13.4 Funding

Chapter XIV Financial Evaluation

14.1 Evaluation Basis and Methodology

14.2 Forecasting Assumptions

14.3 Basic Parameters of Financial Evaluation

14.3.1 Calculation Period of the Project

14.3.2 Outpatient Attendance Rate <

14.3.3 Commercial Supporting Income

14.3.4 Costs and Expenses

14.3.5 Profit

14.3.6 Cash Flow

14.4 Uncertainty Analysis

14.4.1 Break-even Analysis

14.4.2 Sensitivity Analysis

14.5 Evaluation Conclusion

Chapter 15 Social Benefits and Risk Analysis

15.1 Social Impact Benefits

15.2 Mutual Adaptability Analysis

15.3 Risk Analysis

15.3.1 Social Risks

15.3.2 Policy and Environmental Risks

15.4 Conclusion on Social Benefits

Chapter 16 Conclusions and Recommendations

16.1 Main Concluding Remarks of the Project

16.2 Next Steps and Recommendations of the Project

Schedule