1, the necessity of investment
Mainly based on the results of market surveys and forecasts, as well as relevant industrial policies and other factors, to demonstrate the necessity of the project investment and construction.
2, technical feasibility
Mainly from the technical point of view of the implementation of the project, the rational design of technical programs, and comparison and evaluation.
3, financial feasibility
Mainly from the perspective of the project and the investor, the design of a reasonable financial program, capital budgeting from the perspective of corporate finance, evaluation of the project's financial profitability, investment decision-making, and evaluation of shareholders' investment returns from the perspective of the main body of the financing (enterprise), cash flow plan and debt repayment ability.
4, organizational feasibility
Developing a reasonable project implementation schedule, designing a reasonable organizational structure, selecting experienced managers, establishing good collaborative relationships, and developing appropriate training programs to ensure the smooth implementation of the project.
5, economic feasibility
Mainly from the point of view of resource allocation to measure the value of the project, evaluation of the project in the realization of the objectives of regional economic development, the effective allocation of economic resources, increase supply, create employment, improve the environment, improve people's lives and other aspects of the benefits.
6. Social feasibility
Mainly analyze the impact of the project on the society, including political system, policy, economic structure, law and morality, religion and ethnicity, women and children and social stability.
Another attached a hospital project feasibility study template for reference.
Chapter 1 General Introduction
1.1 Project Overview
1.2 Basis and Scope of Preparation
1.2.1 Basis of Preparation
1.2.2 Scope of the Study
1.3 Main Conclusions
1.4 Recommendations
Chapter 2 Background and Necessity of Project Construction
2.1 Overview of the Project Area
2.2 Overview of the Hospital
2.2.1 Name of the Project
2.2.2 Selection of the Project Site
2.2.3 Grade of the Hospital
2.2.4 Planned Total Beds
2.3 Proposition of the Project
2.4 Necessity of the Project Construction
2.4 .1 Need to implement the "Opinions of the Central Government and State Council on Deepening the Reform of Medical and Health Care System"
2.4.2 Promote the coordinated and sustainable development of the local economy and society
2.4.3 Need to meet the increasing demand for medical services of the people
2.4.4 Objective need to build a regional center city
2.4.4 Need to build a regional center city
2.4.4 Need to build a regional center city
3 Objective needs
2.4.5 The project is needed to promote the development of local industries
2.4.6 The project is needed to realize the basic modernization of medical and health care in Guang'an area
Chapter 3: Forecast of Medical Services
3.1 Development Plan of Medical and Health Care Services
3.1.1 The National 12th Five-Year Plan for Medical and Health Care Services
3.1.1 The national " Twelfth Five-Year Plan"
3.1.2 Main Tasks of Sichuan Province during the Twelfth Five-Year Plan Period
3.1.3 Local Health Care Development Plan
3.2 Analysis of Local Medical Resources
3.2. 1 Local medical resources
3.2.2 Analysis of local bed shortage
3.2.3 Current status of hospital medical services
Chapter 4 Construction Scale and Construction Contents
4.1 Construction Scale
4.1.1 Overall planning of the hospital
4.1.2 Analysis of the reasonableness of the construction scale
4.2 Construction Content
Chapter 5: Site Selection and Construction Conditions
5.1 Site Status
5.1.1 Site Location
5.1.2 Land Ownership and Land Area
5.2 Site Conditions
5.2.1 Topographic and Geomorphologic Conditions
5.2.2 Geological Conditions
5.2.2 Site Engineering Conditions
5.2.3 Economic and Social Conditions
5.2.4 Infrastructure Conditions
5.3 Conclusion of Site Selection
Chapter 6 Construction Program
6.1 General Layout Design
6.1.1 Principle
6.1.2 General Arrangement
6.2 Construction Program
6.2.1.2 General Arrangement
6.2.2.1 General Arrangement of Construction p
6.2.1 Design Basis
6.2.2 Building Profile
6.2.3 Elevation Design
6.2.4 Building Materials
6.2.5 Accessibility Design
6.3 Structural Program
6.3.1 Design Basis
6.3.2 Design Load
6.3.3 Seismic Resistance
6.3.1 Design Basis
6.3.2 Design Load
6.3.2 Design Loads
6.3.4 Structural Forms
6.3.5 Main Materials Used
6.4 Water Supply and Drainage Program
6.4.1 Design Basis
6.4.2 Design Scope
6.4.3 Water Supply System
6.4.4 Storm Sewerage System
6.4.5 Pipeline p>6.4.5 Recommended Materials for Piping
6.5 Electrical Engineering
6.5.1 Design Basis
6.5.2 Design Scope
6.5.3 Side and Distribution Systems
6.5.4 Lighting System
6.5.5 Laying of Wires
6.5.6 Lightning Protection for Buildings
6.5.6 Lightning Protection for Buildings
6.5.7 Earthing Protection Measures
6.5.8 Weak Electricity System
6.6 HVAC Engineering
6.6.1 Design Basis
6.6.2 Design Scope
6.6.3 Air Conditioning Design
6.6.4 Ventilation Design
6.6.5 Smoke Exhaustion
6.7 Fire Protection Engineering
6.7.1 Design Basis
6.7.2 Building Category and Fire Resistance Class
6.7.3 Building Fire Protection
6.7.4 Electrical Fire Protection
6.7.5 HVAC Fire Protection
6.7.6 Water Supply and Drainage Fire Protection
6.7.7 Configuration of Fire Extinguishers of the Building
6.8 Outdoor Supporting Works
6.8.1 Water Supply Pipeline Network
6.8.2 Drainage Pipeline Network
6.8.3 Electricity Communication Pipeline Network
6.8.4 Hardening of Grounds
Chapter VII: Energy Saving
7.1 Energy Saving Principle
7.2 Design Basis
7.3 Reasonable Energy Consumption Standards and Project Energy Consumption
7.3.1 Reasonable Energy Consumption Standards
7.3.2 Analysis of Project Energy Consumption
7.4 Energy Conservation Measures
7.4.1 Energy Consumption Technical Measures
7.4.2 Energy Consumption Management Measures
Chapter VIII: Evaluation of Environmental Impacts
8.1 Environmental Impacts Evaluation Basis
8.2 Environmental Impact and Treatment during Construction Period
8.2.1 Environmental Impact Factors during Construction Period
8.2.2 Environmental Protection Measures during Construction Period
8.3 Environmental Impact and Treatment during Operation Period
8.3.1 Analysis of Medical Pollution Sources
8.3.2 Various Pollution Treatment Measures
8.4 Greening
8.5 Environmental Protection Management
Chapter 9 Labor Safety and Health
9.1 Basis of Preparation
9.2 Labor Safety
9.2.1 Main Hazardous Factors and Degree of Hazard
9.2.2 Labor Safety Precautions
9.2.3 Safety Protection
9.3 Sanitation
9.3.1 Water Supply and Drainage Sanitary Protection
9.3.2 Medical Waste Sanitary Protection
9.3.3 Noise Sanitary Protection
Chapter 10 Engineering Construction Management Program
10.1 Project Organization
10.2 Project Organization and Management
10.2.1 Program Management
10.2.2 Quality Management
10.2.3 Financial Management
10.2.4 Progress Management
10.2.5 Data Management
10.3 Project Construction Management
10.3.1 Responsibility System of Project Legal Person
10.3.2 Project Fund Management System
10.3.3 Project Bidding System
10.3.4 Project Engineering Supervision System
10.3.5 Project Contract Management System
Chapter 11: Project Implementation Progress
11.1 Construction Duration
11.2 Implementation Progress Arrangement
Chapter 12: Bidding Program
12.1 Basis for Preparation of Tendering Program
12.2 Principles of Tendering
12.3 Scope of Tendering
12.4 Form of Tendering Organization
12.5 Tendering Methods
Chapter 13 Investment Estimation
13.1 Basis for Preparation
13.2 Scope of Investment Estimation
13.3 Investment Estimation
13.4 Funding
Chapter XIV Financial Evaluation
14.1 Evaluation Basis and Methodology
14.2 Forecasting Assumptions
14.3 Basic Parameters of Financial Evaluation
14.3.1 Calculation Period of the Project
14.3.2 Outpatient Attendance Rate <
14.3.3 Commercial Supporting Income
14.3.4 Costs and Expenses
14.3.5 Profit
14.3.6 Cash Flow
14.4 Uncertainty Analysis
14.4.1 Break-even Analysis
14.4.2 Sensitivity Analysis
14.5 Evaluation Conclusion
Chapter 15 Social Benefits and Risk Analysis
15.1 Social Impact Benefits
15.2 Mutual Adaptability Analysis
15.3 Risk Analysis
15.3.1 Social Risks
15.3.2 Policy and Environmental Risks
15.4 Conclusion on Social Benefits
Chapter 16 Conclusions and Recommendations
16.1 Main Concluding Remarks of the Project
16.2 Next Steps and Recommendations of the Project
Schedule