Northwestern Polytechnical University Chang 'an Campus Teaching Zone

The teaching area of Chang 'an Campus mainly includes teaching west building, teaching east building, experimental building, temporary library, digital building and engineering training center.

The West Teaching Building, with a total construction area of 46,800 square meters, is a digital complex composed of various classrooms and affiliated buildings. The whole building is divided into four areas: A, B, C and D. There are 142 classrooms in the west teaching building, including 56 multimedia classrooms, which can accommodate 16767 people at the same time. The building is equipped with direct drinking water system and electric water heater for the convenience of teachers and students.

The east teaching building is located in the north of the second-phase student living area, with the central green belt in the west, and the college building in the south and east, surrounded by the college building to form a college street mainly for walking. The whole building covers an area of 36,800 ㎡, and the main building has five floors, including12,200 classrooms, 20/kloc-0,60 classrooms and 26 65,438+.

With a total construction area of 26,540 square meters, the experimental building has eight teaching laboratories, including physics, chemistry, computer, electrician, electronics, machinery, mechanics and foreign language pronunciation classrooms, which can undertake all basic experimental teaching tasks.

Digital Building has a building area of 10876 square meters, which is the core of digital campus. It is the center of all weak electricity, including campus network equipment, all-in-one card and security monitoring. It is also the news center of our school's Chang 'an campus, where TV stations and online education centers will work.

The construction area of the engineering training center is 14992 square meters, which can provide metalworking practice for students in school.

The campus service place is the first floor of South Building, Block A of Xingtianyuan, which is the temporary office of the outpatient department of Chang 'an Campus of the school hospital, providing normal medical services during the day and emergency services at night, serving teachers and students all the time; College student supermarket, industrial and commercial bank, post office and comprehensive service building on the first floor of Xingtianyuan South Restaurant.

The first phase of construction also includes track and field (2 1079 square meters), tennis court, badminton court (* * 6,698 square meters), basketball court, volleyball court * *15,400 square meters, college students' cultural and sports activity center17,640 square meters and other facilities, with a total construction area of 608/kloc- The second phase of construction also includes a student activity center and a college building.