(a) concealment of personnel, connecting channels, motorized arteries, command, communications, warehouses, medical rescue, production sites, etc., the main engineering facilities;
(b) the mouth of the project camouflage room, management room;
(c) the project is attached to Lighting, ventilation, filtration, water supply, drainage and other facilities;
(4) other national provisions of the human defense project facilities. Article 3 all within the scope of the city's administrative district of human defense engineering facilities, are managed in accordance with these measures. Article IV of the city's human defense office asphyxia is the city's human defense engineering facilities management.
Counties (cities), districts, the human defense department in accordance with the division of labor management of human defense engineering facilities.
Planning, finance, urban construction, land, taxation, industry and commerce, public security and other relevant departments, should cooperate with the human defense department to do a good job in the management of human defense engineering facilities. Chapter II Engineering Facilities Maintenance Article 5 of the maintenance of human defense engineering facilities in accordance with the following division of labor:
(a) public works, by the human defense departments at all levels are responsible for the maintenance;
(b) unit of works, by the engineering facilities where the unit is responsible for the maintenance;
(c) the use of engineering facilities in the ordinary course of time, there is an agreement on the use of the agreement on the sub-protection of the sixth article of the human defense engineering facilities. Maintenance of the expenditure of funds in accordance with the following provisions:
(a) public works, by the human defense department in the special maintenance costs;
(b) unit of the project, the project is located in accordance with the relevant provisions;
(c) the usual use of the project, according to the provisions of the use agreement. Article VII of the human defense project maintenance funds must be earmarked. Maintenance projects must be handled in accordance with relevant regulations. Article VIII of the maintenance of civil defense engineering facilities must meet the following standards:
(a) the structure of the engineering facilities are intact;
(b) the internal cleanliness of the engineering facilities, no water, no silt, no garbage, no pollution. Iron and wood parts without rust, rot damage;
(C) ventilation, water supply and drainage, power supply and distribution, read-through and other system performance is good;
(D) anti-dense door, airtight door tightness performance is good;
(E) the project mouth is smooth, orifice camouflage facilities are intact. Article IX has been suspended construction of human defense works, should keep the main body and was restored structure is not damaged; has not been restored part, should be subject to take measures to prevent the collapse and damage. Chapter III protection of engineering facilities Article X in the human defense engineering facilities within fifty meters of the mouth of the construction of buildings, shall be reviewed and approved by the human defense department, in accordance with the provisions of the relevant approval procedures, and leave a radius of collapse (one-half of the height of the building) of the distance. If it is impossible to leave the radius of collapse for reasons such as the site, the construction unit shall introduce the mouth into the building and leave a separate room, which shall be managed by the human defense department. Article 11 The facilities of the human defense project shall not be dismantled at will. Indeed need to be removed, should be removed by the unit to apply for approval of the Municipal Human Defense Office.
Approved by the demolition of human defense engineering facilities, by the demolition of units in accordance with the relevant provisions of the approval procedures, according to the original area, purpose, performance, structure, near the replacement, and to achieve the quality standards of human defense engineering. Replacement of construction difficulties, demolition units should be paid according to the actual cost of construction fees, unified by the human defense department to build. Article XII of poor quality, endangering the safety, should not be used for scrapping of human defense works, the management unit must submit an application for scrapping, agreed by the municipal human defense department, reported to the Provincial Human Defense Office for approval. Where the approval of the scrapping of human defense works by the applicant unit is responsible for backfill or closed, and subject to acceptance by the relevant departments. Article XIII of all units and individuals must comply with the following provisions:
(a) are not allowed to the human defense engineering facilities and orifice near the discharge of wastewater, exhaust gas, dumping garbage and feces.
(2) are not allowed to store flammable, explosive, highly toxic, radioactive and corrosive substances in the facilities of human defense works.
(C) are not allowed to damage the facilities of human defense works and their ancillary equipment.
(d) shall not endanger the safety of human defense engineering facilities within the scope of (5 meters of the outer wall of the urban area of human defense works, suburban pit wall or the outer wall of the meters) within the quarrying, sand digging, earth; shall not be buried without authorization of a variety of pipelines and the construction of ground engineering facilities. Indeed need to bury pipelines and construction of ground engineering facilities, shall be applied for by the construction unit, and take full security measures, agreed by the department of human defense, according to the relevant provisions of the approval procedures.
(E) shall not be transformed without authorization of human defense engineering facilities, the need to transform, must be approved by the human defense department, and according to the requirements of human defense engineering and technology construction. Chapter IV Use of Engineering Facilities Article XIV in addition to the command post and communication hubs outside the human defense engineering facilities, approved by the human defense department agreed to, can be used for a fee. Article XV of the use of human defense engineering facilities units and individuals, must take care of human defense engineering facilities. Article XVI of the unit project, the unit has priority right to use. Article XVII of the use of human defense works units and individuals, must apply to the human defense department for the use of formalities, and sign a contract with the management or use of the unit. Article XVIII of the use of human defense works units and individuals, must conscientiously implement the fire safety provisions of human defense works, the implementation of fire prevention systems and measures.