First of all, we must look at all the building construction drawings carefully, to see through the information of the drawings inside. After reading the drawings to figure out the amount of the whole project can be calculated.
The first step: from the earth (stone) works, first of all, the amount of leveling the site, the amount of leveling the site in accordance with the dimensions of the design drawings to the first floor of the building floor area calculation. However, it should be noted that the vertical arrangement of large-scale excavation or backfill, can not be leveled to the amount of work calculated in the site. Calculate the amount of leveling the site, the next calculation to the amount of digging trench, digging trench generally do not put the slope does not put the retaining plate, some from the bedding layer of the lower surface or the upper surface of the lower surface of the slope. Then there is a kind is both sides are support retaining plate or one side of the support retaining plate one side of the slope. So this depends on the design of your drawings to determine how to calculate the amount of trenching work. After calculating the amount of trenching works, the next step is to calculate the amount of digging pit works. Pit has a square, rectangular and round, according to the volume to calculate, this also depends on the design of your drawings to dig the pit is what shape. The pit is also sloped, not sloped and not support the retaining plate or support the retaining plate, this should look at the drawings on the instructions. Then calculate the volume of foundation backfill and interior backfill.
Step 2: Count the piles and foundation work.
Step 3: Count masonry work by volume.
Step 4: Concrete and reinforced concrete work.
Step 5: Metal Structural Work.
Step 6: Roof waterproofing work.
Step 7: anti-corrosion works.
Step 8: Formwork works.
Step 9: construction scaffolding works. (These two sets of quotas are in the technical measures project set the corresponding quotas)
The tenth step: the floor ground works.
The eleventh step: wall and column surfaces.
The twelfth step: the canopy project.
Step 13: metal doors and windows, wooden doors and windows works.
Step 14: Painting, coating, and framing work.
If the design drawings inside the requirements of the high-rise building increased fees or civil construction of the second transportation in the high-rise building increased fees and civil construction of the second transportation project inside the set into the appropriate quota. However, there are generally very few such requirements, depending on whether your design drawings have such requirements.
The above I said that the amount of work inside the finished set of quotas, a project's budget to complete eighty percent. After all the good amount of input set after the quota, click on the project fee in the right side of the fee rate there to take the appropriate rate. And then in the fee rate click professional fee, these are required to do the budget when counted. Note that in the set of fixed amount insert budget dog, otherwise the calculated total cost will change around, that is, the total cost is not correct. After all the quotas have been applied and the rates have been taken, the calculated price is the total cost of the whole project that you have calculated. So a complete project budget is done.