? For accidents that may occur at any time, we need to develop effective emergency plans, emergency plans for our life safety is very necessary, emergency plans to write what? After searching and organizing, I present to you "site typhoon emergency plan 2022 selected 4", just for reference, welcome to read.
Site typhoon emergency plan 2022 selected 4 articles? In order to do a good job of my site to prevent typhoons, reduce disaster losses, safeguard personal and property safety, according to the "Chinese People's Republic of China *** and the State Safety Production Law" and the District Construction Bureau of the spirit of the relevant documents, combined with the actuality of my company, the development of the project department emergency treatment work plan.
? First, the basic principles of emergency treatment
? (A) this plan for my construction site suffered a typhoon attack or impact, the basic procedures and organizational principles of emergency response.
? (B) in the implementation of emergency response work in the implementation of unified command, each responsible for their own, prevention-oriented, rescue first, rapid response, to ensure the principle of safety.
? Second, the organizational structure and responsibilities of the director
? The project department set up a construction site typhoon prevention work leading group
? Leader: Project Manager xx
? Deputy leader: deputy project manager xx
? Members: Project Department Safety Office xx
? Main responsibilities:
? (a) Responsible for the development and modification of the emergency response plan for typhoon prevention in construction projects;
? (ii) Before the arrival of typhoon, responsible for notifying the site to do typhoon prevention work, checking the reinforcement of site safety facilities, evacuation, transfer of operating personnel;
? (C) arrange personnel on duty, inspect the construction site, immediately organize rescue and relief and aftercare work, maintain close contact with higher authorities, and report the emergency treatment of the accident site at any time;
? (D) after the typhoon, is responsible for convening the relevant personnel to summarize the emergency treatment of the accident.
? Third, the implementation of the plan
? (A) received the news released by the weather station, it is expected that there is a possibility of being affected by the typhoon:
?1, the construction site project manager department issued a notice of typhoon prevention, the relevant personnel of the project department to pay attention to listening to the weather news, pay close attention to the typhoon movements;
?2, the project manager department is responsible for notifying the relevant personnel and team on the site, and requires all personnel to work closely together to make preparations to prevent the typhoon.
? (B) when the typhoon is approaching the city, within 48 hours will affect our region, the weather station issued a typhoon warning:
?1, the project department should be reasonable arrangements for the construction, to stop the continuous construction of the process of operation;
?2, the project department should cooperate with the branch to do a good job of pre-typhoon safety inspections, inspections, including construction lifts are solid, scaffolding and other facilities are stable, temporary work shed Whether it is safe, etc., take measures to reinforce and eliminate hidden safety hazards.
? (C) when the typhoon is likely to hit our region within 24 hours, the weather station issued an emergency warning:
?1, the project department of the typhoon prevention work leading group personnel in place, arrange for personnel on duty;
?2, the site to stop the construction of construction, the construction workers withdrawn to the safety zone;
?3, the project manager department of the organization of the site, with the company's leading group to further check the implementation of the various defense measures. The implementation of various defense measures, the implementation of site rescue teams in place, and in a state of readiness;
?4, during the typhoon, the occurrence of construction site injuries and deaths in the event of a safety accident, according to the company's "construction project emergency rescue plan for major safety accidents" implementation.
? After the typhoon
? The weather station issued a typhoon warning lifted, the project department should check the damage and report to the branch and the head office, for the site safety facilities should be reinforced in a timely manner, and summarize the work of typhoon prevention.
Site typhoon contingency plan 2022 selected 4 articles second? Doing a good job of typhoon prevention on construction sites is of great significance to social stability and economic development. In order to make the typhoon prevention work can be carried out in an orderly manner, to ensure that the site emergency response work in a timely, efficient and orderly manner, to minimize the accident and disaster, to protect the safety of people and property, and to maintain social stability, according to the "People's Republic of China *** and the State Safety Production Law", "the State Council on the provisions of the accountability for the administrative responsibility of the major safety accidents" (State Council Decree No. 302), combined with the actual situation of my site. Formulate this emergency treatment work plan.
? First, the basic principles of emergency response
? (A) this plan for my site in the typhoon impact, the basic procedures and principles of organization of emergency response work.
? (ii) This plan is applicable to the emergency treatment of the site.
? (C) this plan in the implementation of emergency response work in the implementation of unified command, each responsible for their own responsibilities, close coordination, prevention first, save lives first, rapid response, local protection, ensure safety principles.
? Second, the organization and command structure and main responsibilities
? The establishment of site wind work command group
? Leader: xx
? Member: each construction team leader
? Main responsibilities:
? (a) Responsible for the development and modification of the project's wind emergency response implementation plan;
? (ii) Before the typhoon, responsible for notifying all persons in charge of the site to do a good job of windproof work, checking the reinforcement of site safety facilities, evacuating and transferring the people staying in the temporary work shed;
? (C) arrange personnel on duty, inspect the site, if casualties occur, immediately organize rescue rescue and aftercare work; maintain close contact with the relevant government departments, at any time to report on the emergency treatment of the scene of the accident or request to be the necessary rescue rescue rescue power reinforcement;
? (D) the end of the typhoon, is responsible for convening the relevant departments to investigate and analyze the causes of casualty accidents, the emergency treatment of accidents to summarize the situation.
? Third, the implementation of the plan
? (A), when the typhoon is developing, is expected to have the possibility of affecting our region, the weather station issued a typhoon news:
?1, issued a notice of the work of the wind, each team should pay attention to listen to and watch the weather forecast, pay close attention to the typhoon movements.
?2. Notify the teams at the site and ask them to pay attention to all preparations for typhoon prevention.
? (ii), when the typhoon is approaching the city, within 48 hours will affect our region, the weather station issued a typhoon warning:
?1, the teams should be reasonable arrangements for construction, to stop must be continuous construction of process operations;
?2, do a good job of pre-typhoon safety inspections, inspections, including whether the well frame is solid, rows of fences and other facilities are solid, including the safety of the temporary shed, to take measures to Reinforcement, eliminate potential safety hazards.
?3, strengthen the inspection of the site, the problems found during the inspection, hidden dangers to be issued a rectification notice, ordering the construction team to immediately rectify and deal with.
? (C), when the typhoon is likely to hit our region within 24 hours, there will be a serious impact on our region, the weather station issued an emergency typhoon warning:
?1, the site of the command team of the work of the typhoon is in place, and arrange for personnel on duty, inspections of the site.
?2, the site to stop construction, the construction workers will be evacuated to a safe area.
?3, further check the implementation of the various defense measures, and is in a state of readiness, the implementation of the site emergency rescue team in place, and is in a state of readiness.
? (D), when the typhoon has landed and weakened to low pressure, no longer have an impact on the city, the weather station issued a typhoon warning lifted, the construction team should check the damage. For the safety of site equipment and facilities should be reinforced in a timely manner, and summarize the work of typhoon prevention.
Site typhoon contingency plan 2022 selected 4 articles three?xx project is located in xx city, the site terrain is flat, open lower-lying, and Daya Bay seashore is almost similar, based on the factors of seawater rising and falling tides, by the typhoon impact is greater, therefore, in the flood season and typhoon before the arrival of the work, it is important to do a good job of prevention, to prevent accidents causing unnecessary losses. In order to ensure the safety of the site, reduce the losses caused by natural disasters, taking into account the typhoon, rain during the construction of the project by the surface water has a greater impact, the project department has developed this plan.
? First, flood and typhoon emergency rescue organization
? Project Department set up emergency rescue leading group. The leader of the group by Li Bai'an, deputy leader of the group by Chen Huabin, group members xxx composition. The daily office of the emergency rescue leading group is the project department.
?1, emergency organization
? Member: xxx
?1) the site commander by Li Bai'an as;
?2) casualty rescue group by xx as group leader, each construction team were drawn from the operating personnel; mud and water team to draw 2 people, roofing team to draw 2 people, paint team, water and electricity team to draw 1 person.
?3) material salvage group by xx is responsible for, each construction team to draw construction personnel; masonry team to draw 2 people, roofing team to draw 1 person, painting team, plumbing and electrical team to draw 1 person.
?4) safety inspection team is responsible for xx, the construction team were drawn from the composition of the operating personnel; masonry team to draw 2 people, waterproofing team to draw 1 person, painting team, plumbing and electrical team to draw 1 person.
?5) defense and guidance group by xx is responsible for the construction team were drawn from the construction staff;
?6) logistics supply group by xx is responsible for the composition of the office staff;
?7) the site of the temporary medical team is responsible for the xx, the construction team were drawn from the composition of the personnel.
?2, the functions and duties of the emergency rescue organization
?1) The functions and duties of the emergency rescue site deputy team leader:
?a, command and coordination of all accident site operations;
?b, on-site accident assessment;
?c, to ensure that the site personnel and the public emergency response to the implementation of the action;
?d, Control of emergencies;
?e, command of on-site emergency rescue operations, and coordination with the Deputy Chief of Response Operations at the Emergency Rescue Command Center;
?f, make a good job of the transfer of command of the scene of the emergency rescue treatment after the conversion of the right to command and assistance in the handling of emergencies;
?g, make a good job of the various public with the prevention of typhoon and rainstorm, firefighting, medical care, traffic control, disaster relief and other public *** rescue department contact work.
?2) Functions and duties of the injured rescue team:
?a, guide the site operators to evacuate from the safe channel;
?b, rescue the injured to the safe zone.
?3) Functions and duties of the material rescue team:
?a. Rescue and transportation of materials in the field that can be transferred;
?b. Transfer of items that may cause new sources of danger to the safety zone.
?4) The functions and duties of the defense and evacuation team:
?a, effective isolation of the site inside and outside the work and maintenance of the site emergency rescue channel open work;
?b, evacuation of residents outside the site to withdraw from the danger zone.
?5) The functions and duties of the rescue material supply team: a, rapid deployment of rescue materials and equipment to the point of accident;
?b, providing and checking the equipment and safety of the rescue personnel;
?c, the timely provision of follow-up rescue materials.
?6) Functions and duties of the logistic supply group:
?a, quickly organize the items that must be supplied by the logistic;
?b, timely delivery of logistic supply items to the emergency personnel.
?7) The functions and duties of the temporary on-site medical team:
?a. Simple salvage and bandaging of injured people;
?b. Timely transfer of seriously injured people to medical institutions.
? Second, scheduling duty
? Project Department set up a corresponding variety of sudden natural disaster emergency rescue leading group and office, in the typhoon storm occurred during the period, the arrangement of personnel on duty 24 hours a day, responsible for the collection of meteorological information, collation, to maintain contact with the head office and the anti-typhoon headquarters, do a good job of the duty record.
? The project department arranges relevant personnel to be on duty day and night, timely detection of rainstorm accidents and potential accidents, and timely organization of rescue.
? In the first time of the occurrence of dangerous situations timely reported to the leadership of the group company.
? Third, emergency preparedness
?1. The construction team in the project department under the leadership of the leading group of emergency rescue, is responsible for organizing the development of a good preparation of the corresponding emergency plan.
?2. The project department is responsible for doing a good job of collecting, tracking and transmitting weather forecast information, supervising the implementation of typhoon rainy period duty personnel, and make records.
?3. After receiving the relevant emergency warning notice issued by the city meteorological station, all the staff of the project department emergency rescue leading group should immediately convene a meeting and organize the team to make good preparations for the disaster, and supervise the implementation of various emergency measures, the project manager should strengthen the patrol and inspection, and be equipped with emergency equipment and materials.
?4. The project manager according to the typhoon, rainstorm area to do emergency measures, so that the construction site of the smooth drainage system, power outages and reinforce the temporary power lines to ensure smooth communication.
?5. Hazardous materials should be stored in a clear location labeled, to prevent flooding will be stirred up, mixed, loss.
Site typhoon contingency plan 2022 selected 4 articles four
? In order to effectively respond to disasters in the event of floods, floods and typhoons, to protect the lives of employees on site and the safety of property, the development of the project department of anti-Nibert typhoon emergency plan.
? First, the work policy and principles
? (1) construction site typhoon contingency plan, must follow the "prevention-oriented, unremitting"
? policy, implement the "unified leadership, hierarchical responsibility, timely response, decisive measures" principle.
? (2) Scope. The provisions of the emergency plan against typhoon refers to the sudden occurrence, once the typhoon disaster, the duty officer should immediately report to the Party and the local authorities, the leading group of typhoon prevention of the various functions should be immediately on the spot to check the damage caused by the situation or may cause a major infectious disease outbreaks, group of unexplained illnesses, as well as the site of the temporary buildings of the typhoon treatment.
? Second, the organization and leadership
? (1) the project department set up a typhoon emergency response team, the project manager is fully responsible for the construction site supervision staff of the typhoon emergency response work to implement a unified leadership, unified layout, unified command. The development of "three defense" plan, the implementation of the duties of all relevant personnel, the development of effective emergency control measures.
? (2) before the start of the emergency plan, the project site should be prepared for emergency treatment, emergency plan start, take effective control measures.
? Third, the site organization:
?1, check the scaffolding specific to each fastener, as well as the scaffolding does not store any materials.
?2. Stacking and fixing materials on site that are easily blown up by phoenix.
?3. Reinforce the maintenance of the construction site to ensure that no safety accidents occur.
?4, typhoon approaching any relevant personnel are prohibited from entering the construction site.
? Fourth, emergency measures:
? Construction site in the event of typhoon disaster, the project must immediately take the following emergency measures:
? (1) Immediately count the on-site supervisory staff, rescue the victimized employees, and if necessary, evacuate the personnel in a timely manner;
? (2) Immediately report the disaster to Party A, local authorities and the company headquarters;
? (3) Immediately send the injured to the nearest hospital for treatment;
? (4) Supervise the construction unit to start the emergency plan, quickly implement rescue and relief, and prevent and control possible secondary disasters;
? (5) to disaster-induced infectious diseases reported to the health sector in a timely manner, the implementation of closed management, in situ isolation, eliminating the entry and exit of people, to be put forward by the health sector to categorize and dispose of the program, according to the views of the health sector to implement;
? (6) for infectious disease incidence of personnel or suspected cases, must be under the guidance of the health department, as soon as possible to send the local infectious disease hospital treatment. For non-communicable disease incidence of persons, should be implemented quickly reported to treatment:
? (7) of food poisoning and other cases, should be immediately sent to the hospital for treatment, should be sent to the health department to test food samples
? products, the unaffected dining staff should be monitored and mapped to ensure that patients receive timely treatment;
? (8) Typhoon weather information and the government's typhoon prevention requirements must be notified to all managers and workers before typhoons and rainstorms, and targeted windproof inspections must be carried out before typhoons and rainstorms, and this work must be institutionalized;
? (9) Focus on strengthening the supervision and inspection of foundation pits (high slopes), large-scale machinery and equipment, scaffolding, find problems and deal with them in time, and urge the construction unit to evacuate the personnel in time and report to the higher authorities on the construction sites where safety problems may occur;
? (10) in case of heavy rain, more than 6 strong winds and other catastrophic weather, prohibit work at height, open-air work and mechanical equipment operations, to ensure the safety of construction personnel, equipment and facilities.
? V. Report inspection system
? (1) After entering the construction site, the project manager should check and supervise the implementation of disaster emergency response preparations and equipment.
? (3) In the event of flood, flood or typhoon disaster, the project manager shall promptly report to the company headquarters on the situation and progress of the disaster, the status of construction personnel and the emergency treatment measures taken/to be taken.
? (4) After the occurrence of "flood, flood or typhoon disaster", the project manager must always check and supervise the supervisory personnel to take effective preventive and control measures, and if necessary, timely evacuation to ensure the safety of personnel.