What are the acceptance criteria for industrial plant

Now more and more individual bosses, the plant is also building more and more, the general plant after the construction of good and what acceptance criteria we all know little about it, after understanding the plant acceptance criteria can also be put into use as soon as possible after the state of the plant.

In the unit project as long as to meet the need to hand over the requirements can be phased completion and acceptance. Independent construction contracts signed after the completion of the project can be independent of the completion of the acceptance work. In the understanding of industrial plant acceptance criteria and procedures, in the completion of industrial plant acceptance to do a good job in preparation for the completion of acceptance, the following steps are indispensable, which is the provisions of the acceptance criteria for industrial plant.

Before the acceptance of the construction unit itself first complete inspection of the plant, do a good job of finishing.

First of all, there are three kinds of acceptance in the acceptance standard of industrial plant, one is the unit project and professional engineering, including civil engineering, pipeline engineering, civil defense engineering, installation engineering and so on. These projects, first of all, the project content is missing, according to the design drawings specification construction, acceptance of the actual size and drawing size should be consistent, and secondly, the quality of the project should be in line with the requirements of the project contract, in accordance with the design of the drawings, acceptance specifications and technical instructions and other requirements for acceptance. The second case is a single project acceptance, the third is the overall project acceptance.

Construction process to appoint a professional data clerk for the project involves all the data well organized and stored, each project completion acceptance of these data are required to use.

Construction units in the completion of the construction of the application report submitted to the acceptance of construction, supervision engineers will be based on the contract, industrial plant acceptance criteria one by one check, detailed inspection, pre-acceptance. If you find where there are quality problems, you should notify the construction unit, the construction unit according to the acceptance criteria for repair or rework. Formal construction acceptance will take the owner, the construction unit and the design unit after the supervising engineer has no problem.

In fact, the industrial plant acceptance criteria and ordinary residential acceptance criteria are similar to the basic process, acceptance after use is also to reduce the trouble later.