The line is not a single switch, but a single P16 switch.
Line laying: each device from the distribution box to pull out a line to the nearest position of the equipment power supply interface to install the 86 junction box, from the junction box with a snakeskin hose lead to the equipment junction box. Equipment with a plug, then directly install the socket panel to the junction box. CNC with 4 square copper wire, zero ground optional 2.5 square copper wire, diameter 32 PVC pipe laid. The rest of the equipment with 2.5 square copper wire, diameter 25 PVC pipe laid, sanders single then three lines (phase, zero, ground) 20 of the pipe can be. Zero ground line should be connected reliably, the ground line is to ensure safety.
The room is not big, if you buy materials 1500 should be enough.