Equipment maintenance personal work summary
Time flies, a period of time has come to an end, review this period of time, there must be a lot of hardship, to write a work summary for this year's work. Good work summary have some characteristics? Here is my help you organize the equipment maintenance personal work summary, welcome to read and collect.
First, the completion of the daily work
1, 20xx annual **** to complete about the zero maintenance work, which has a public **** area, the owners of the maintenance, merchant maintenance and so on. The owners of the commercial tenants of the praise and recognition.
2, strengthen the site management, the community decoration unit construction according to the management office rules and regulations to supervise, so that it does not affect the appearance of the community and security management, the store's central air conditioning and fire piping renovation requirements in accordance with the process specifications for construction to ensure that the central air-conditioning system and the fire protection system for the normal operation of the system.
3, the month of re-revised duties and workflow, on the basis of which improved the work records and equipment operation records, the duties put into practice
4, monthly transcription calculation of water and electricity meter, with the financial do a good job of monthly water and electricity billing and management fee collection
5, xx building fire escape remodeling. The original ring light plus electronic ballast cost about a set of yuan, after the transformation of energy-saving lamps cost about yuan a, transformation of the number of about branch.
6, xx building corridor light transformation. The original 36W integrated tube lamp cost about $ a, after the transformation of energy-saving lamps cost about $ a, the transformation of the number of branches.
7, to help stores with electricity capacity line transformation.
8, the treatment of pump noise. Life pump room in the use of vibration and noise in the process led to the A building owners have repeatedly complained about the pump noise seriously affect their quality of life, after the Environmental Protection Agency, the construction unit of the transformation has solved this problem.
9, underground garage entrances and exits to adjust the project and open parking lot to install kiosks and road gates. Speed bumps.
10, during the thunderstorms and rain in a timely manner on the community ditch pipeline waste dredging work as well as do a good job of flood control
11, follow up on the community's legacy of engineering maintenance. (Repair wall cracks, leakage, maintenance of windows and doors, etc.)
Second, the construction of transformation
In accordance with the deployment of the company, agreed by the Group, the Ministry of Engineering better completed the construction tasks issued by the company, for the company to save costs.
1, the first floor of the Security Management Department, Engineering Department office decoration.
2, underground garage entrance pavement pouring cement.
3, sightseeing elevator lobby door paved barrier-free access.
4, the green belt in front of the stores on the first floor was changed to paving environmental protection bricks.
5, the lawn is changed to paved stone road.
Third, the maintenance of equipment and facilities
At present, the maintenance of community equipment in general is still in place, all the equipment in accordance with the equipment maintenance instructions for maintenance, daily inspections, are currently in good working condition.
1, in strict accordance with the specification requirements for the operation and maintenance of the distribution system, with reference to the annual work plan, to complete the Daxia core distribution room equipment operation, overhaul and cleaning work. At the same time, regular maintenance of bus plug boxes in the distribution tube wells on each floor
2, the elevator inspection methods are updated. For the elevator accidents, and the Ministry of Engineering inspection work is not found in the phenomenon of analysis and summary of the original inspection method to improve and perfect. In the original only on the machine room, elevator host for inspection on the basis of strengthening the inspection of ride comfort, stability and noise conditions in the inspection, to the top of the car running observation, the pit view. Supervision of maintenance units to improve the level of repair and maintenance to eliminate hidden faults. Strengthen the elevator maintenance follow-up supervision work, so that xx elevator successfully through the Quality and Technical Supervision Bureau of the annual inspection of the elevator, and obtain the elevator safety certificate.
3, strictly in accordance with the fire management regulations to grasp the daily management of building fire facilities, fire equipment for a comprehensive overhaul and rust refueling work. Standardize the maintenance of fire facilities and equipment. In order to make the emergency lights, evacuation indicator system is running well, to ensure that after the fire every evacuation indicator, safety indicator, hallway emergency lighting light to guide owners (users) in an orderly emergency evacuation, reduce casualties to develop "emergency lights, evacuation indicator system maintenance regulations" and distribution of the corresponding record forms, emergency lights, evacuation indicator system maintenance to standardize. Timely discovery of problematic lamps and lanterns to repair, and further improve the operational reliability of fire facilities and equipment.
4, maintenance of central air conditioning equipment, cooling towers on the sky and chilled water pipeline monthly cleaning. Monthly one - three store table coil fan census and one of the different problems of the coil ducts for repair, the month of the engine room and the sky surface cooling water pipe rust and paint, improve the safe operation of the equipment performance, to ensure the normal supply of summer cooling.
5, generator maintenance once a month, maintenance routinely run on 15 minutes, to ensure that power outages can quickly power generation.
6, living water pump room daily inspections to ensure the safe operation of equipment, to create a good living environment for the owners.
7, weak power equipment maintenance work, weak power tube wells in the building carried out a comprehensive cleaning, organizing the work, with telecommunications, mobile, Unicom and other companies to carry out the installation of equipment repair and maintenance work.
8, easy to problem node summary. Because the vast majority of facilities and equipment failures are caused by damage to individual important components, such as water supply system failures are mostly caused by check valves and solenoid valves, level meters, burn motors are mostly caused by damage to the contacts of the AC contactor hair pulling, the elevator's 'faults are mostly caused by the light film, door machine, leveler, control cabinets, a variety of contactors. Requirements for the maintenance department to gradually establish the equipment failure account, easy to problem nodes summary, to do a good job, to strengthen this part of the maintenance work to improve the safety and security of facilities and equipment.
Equipment Maintenance Individual Work Summary 2To strengthen the management of electrochemical teaching, improve the level of application of e-learning equipment, according to the work arrangements, e-learning information center in mid- to late-XX month, carried out primary and secondary school information technology teaching listening to classes, research and e-learning equipment census maintenance, special room training work. This activity, *** research school more than 40, listening to 24 sections of e-learning classes, issued more than 45 questionnaires, maintenance of e-learning equipment more than 150 units. The situation is summarized as follows:
First, the leadership attaches importance to a sound system
Most of the mathematical district, state-run schools can recognize the importance of the work of e-learning, the school combined with the actual teaching and learning of the e-learning work plan, the school-level information technology training programs, the management system of each special room. In this activity, most of the principals can actively prepare, and accompany the research or listening to the class, the existence of problems on-site office, the implementation of the person, bound responsibility, received a better effect.
Accompanying the research of e-learning equipment principals are: XX school district XX, XX middle school XX, XX elementary school XX, etc.; accompanied by listening to the lessons of the vice-principal are: XXX, XXX, XXX, XXX, etc..
Second, the equipment management in place, the use of standardized
Most of the units of e-learning equipment can be used in the designated special room, register, into the sequence of fixed assets, the designation of a person responsible for the management. Specialized classroom equipment is better protected, high usage rate, the use of detailed records, the limit of the role of e-learning equipment. E-learning equipment is numbered and sequenced, and "ID cards" are established for each machine. Most units of e-learning teaching resources can be continuously enriched on the basis of the original, greatly improving the utilization rate. Specialized room management personnel in the work of the business quality has greatly improved.
Equipment management work better units: XX school district, XX school district, XXX school district, XX school district, XX school. Schools with higher rates of equipment completion and utilization: XXX Middle School, XX Middle School and so on.
Third, information technology teaching is in good order, the atmosphere is strong
The vast majority of schools in accordance with the requirements of the information technology syllabus, in the third grade and above to open information technology classes. The information technology teachers are able to make arrangements for the course, the class has a lesson plan, after the class has practiced. The computer classroom has a computer register and detailed records, and is consistent with the teaching progress. In the classroom, students are eager to answer questions, group cooperation, one to help one, excellent with poor and other teaching methods to create a good learning atmosphere.
Information technology courses offer better units are: XX school district, XX school district, XX elementary school. Strong sense of responsibility, good business skills, good classroom teachers are: XX school district Yucai school, XX school district back to Zhang school XX, XX school district Han village secondary school Meng Qingke, XX school district middle school, XX school, and so on.
Fourth, there are problems and phenomena
1, individual unit leaders do not have a high understanding of the work of e-learning, there is no corresponding management system and measures. The main performance are: no work plan, no special classroom system, the file is not complete, records are not detailed. Knowledge of e-learning training, e-learning equipment, the use of insufficient attention, measures are powerless. Some leaders more or less will not use, dare not use, do not allow the use of, for fear of using bad, for fear of the phenomenon of electricity.
2, individual school equipment management is not in place. If the equipment is not used in the room, there is misappropriation, borrowing phenomenon, room health is poor, and even some units of the roof leakage, equipment was "bathing" phenomenon.
3, individual schools in the e-learning equipment repair and maintenance, there is a "wait, rely on" thinking, damaged equipment can not be timely maintenance, can not normally provide services for teaching.
Equipment maintenance personal work summary 3
According to the "xx" of the overall deployment, xx workshop annual system overhaul from xx on xx, to xx on xx, the end of the comprehensive, lasted xx days, involving technical reform and maintenance of the project 91, is the first large-scale maintenance activities since the x workshop was built and put into operation, by the company attaches great importance to. The overhaul in accordance with the principle of service production, production protection, "safety, science and technology, quality, perfection" as the theme, x workshop in the overhaul of the direct leadership of the command, cadres and workers to fully carry forward the "division of the tiger and wolf" team spirit, to "Challenge the limit, the courage to go forward" attitude of the work of the group, work hard, and successfully completed the overhaul program. For the second half of the production work smoothly laid a solid foundation of hardware facilities, provides a reliable equipment protection. In this overhaul process, we have also accumulated a lot of valuable equipment maintenance experience for future overhaul work reserves a large number of maintenance cases can be relied on, maintenance technicians through the overhaul of the actual exercise, the operator is also based on the technical parameters of the equipment has a further understanding. In order to sum up the experience, to find the shortcomings, the completion of the task of overhauling the company to overhaul the command summary as follows:
A well-organized, well-prepared.
The overhaul involves repairing many parts of the equipment, the complexity of the situation, many participants. And in June and July, high temperatures and frequent rainy weather, affecting the safety of the unfavorable factors increased. In order to ensure the smooth implementation of the overhaul program, the entire line before the stop, x workshop in the company overhaul under the specific guidance of the command of the Department, set up a workshop Wu Hongshuai for the commander-in-chief, director of the assistant director of the Liu BaoLin, Zhang YunLiang for the deputy commander-in-chief, equipment scheduling, equipment technicians, process technicians as the main members of the overhaul leading group, fully responsible for overhauling the process of coordination of the work, the site supervision program implementation, and designate the safety officer, Logistical support staff, publicity and reporting staff, the person in charge of the site organization, responsible for the overhaul of the security supervision, logistics, publicity and reporting, technical operations.
On June 22nd, the night shift started, and the whole line of workshop X was stopped. Before parking, on the parking parts of the cleanup debugging and safety precautionary work, workshop overhaul leading group members in advance to enter the scheduled site, inspection and supervision, coordination and coordination, emphasizing that after cleaning up a part of the maintenance personnel to enter a part of the cleanup work must be rapid, safe, timely, thorough, leaving no dead ends, to prevent repeated cleanup, affecting the progress of the overhaul. Key cleaning parts designated cleaning, clear cleaning standards, time limit for completion, emphasize the precautions; advance communication with the material library to do a good job in advance, to ensure that the cleaning of the required work, appliances on time, complete. The company has also done a good job of collecting and distributing safety precautions, summer supplies and medicines, and has done a good job of publicizing and encouraging the work before the overhaul.
In order to ensure that the overhaul work is carried out in an orderly manner, before the implementation of the overhaul, x workshop for the project characteristics, specifically formulated a detailed "Overhaul Plan", "Overhaul Progress Network Diagram", which tasked the maintenance team to repair the equipment to be implemented in the division of labor, specific to the person. Maintenance progress of the project to do maintenance shows that the implementation of the program, completion of a report, the effect of an assessment. And the provisions of the overhaul period every day at 16:30 in the afternoon to convene the overhaul progress evaluation meeting, on the day of the progress of the project, the problems encountered, the emergence of a summary of the study, summarize the evaluation.
Second, the measures are effective, carry out orderly.
For the maintenance of the project characteristics, x workshop in the implementation of the overhaul program to develop a number of corresponding flexible measures, these measures effectively accelerate the construction progress, to ensure the quality of maintenance. Pre-bleaching post alkalization tower anticorrosion lining cleaning work, cleaning difficulty, high cleaning standards, narrow space, can not be implemented at the same time more than one person to clean up. In order to speed up the cleaning progress, to ensure the cleaning effect, overhaul the leading group after study, decided to implement shift cleaning, x fourteen hours are specialized uninterrupted construction, after three consecutive days and nights of intense cleanup, finally completed the cleanup work of high standards. Steam ball reducer in the maintenance process, the output shaft cross coupling due to long-term operation, connecting closely, the company's existing apparatus is not enough to dismantle it, the maintenance leading group decisively made the decision to transport the equipment out of the factory, the use of external special apparatus to implement the dismantling to ensure that the replacement of the reassembly is completed on time.
Workshop on the new steam ball, due to civil engineering has not been completed, the ancillary components can not be implemented one-time installation and commissioning. To this end, the maintenance leading group decided to take the construction side of the installation, two-way synchronization of the installation strategy, to the end of the overhaul, drive motors, propellers and other large auxiliary equipment have been installed.
Safety is the overhaul during the work of the difficult, due to the welding needs, the workshop fire point compared to the usual sudden increase, in order to ensure safety, x workshop by Sun Yanjun, Zhang Shidong two comrades are specifically responsible for the implementation of on-site tracking and supervision, and strictly check the fire hazards. Two comrades day and night, split inspection in the front line of the overhaul, effectively eliminating the hidden dangers of safety accidents, for the overhaul to create a safe and stable operating environment. Comrades Zhang Shumei and Mi Haixia actively did a good job in collecting, stocking and distributing heat-prevention materials, and worked tirelessly for the logistic support of the staff during the overhaul. The publicity and reporting staff to go into the front line to collect advanced deeds, write more than ten on-site reports, to assist the labor union to produce publicity with five flags, effectively play a role in the spirit of motivation.
Three, employees in the overhaul during the overall situation, the spirit of excitement, strong sense of collaboration, emerged a large number of advanced people and humane deeds.
Because of this overhaul x workshop is the main position, a workshop maintenance workers were ordered to come to x workshop to help work, they fully embodied the overall situation, regardless of the valuable spirit of gain and loss. In accomplishing the task, they obeyed the superior's allocation with high attitude, strictly controlled themselves with high standard, completed the task with high quality, and made an important contribution to the overhaul work of workshop X. During the overhaul, they also launched a positive labor competition with the x-workshop maintenance workers, more than style, more than progress, more than quality, more than safety.
Technical backbone unreservedly give full play to personal technical expertise, in the overhaul work as a pioneer. x workshop equipment technician Guo Yanjun, their own technical excellence, in the overhaul as a member of the workshop overhaul leading group, is responsible for the equipment overhaul plan declaration, the material to receive and overtime hours declared a large number of heavy work. 27 June, the paper copying machine x pressure part of the pressure roller taper axis due to the existence of a small discrepancy with the supporting bearings, in order to make the taper axis of the paper copying machine x pressure part and the supporting bearings, there is a small difference between the taper roller and the supporting bearings. In order to make the taper shaft reach the parameter standard, he gave up his rest time, worked overtime for three hours, and polished it by hand with a steel file to complete the calibration task with high quality.
x workshop packer Zou Jinliang, feeder Qi Jinfeng, Xing Huanzhi three people, engaged in the current work before, has worked as an equipment repairman, when a workshop overhaul work in full swing, seconded maintenance back to a workshop, x workshop overhaul due to the reduction of personnel, the task is obviously aggravated, the critical moment, the three people take the initiative to volunteer to return to their old jobs, as a temporary repairman, and voluntarily give up the normal rest time, working overtime to assist the maintenance work. Assist maintenance to carry out the work, touched and influenced all the staff.
Pulping section of the preparation workers and open cotton workers, is responsible for the cleaning of the black liquid tank of the big release steam. 28 June outdoor temperature of up to 38 degrees Celsius, they are in the high temperature conditions in the deep can be waist deep black liquid tank for a day, without complaint.
Pulping section maintenance Zhang Debiao, Yu Yongming, Guo Hongliang and others, in the heat conditions, drilling into the hot steam ball on the lateral pipe flange replacement, despite the harsh environment, long time operation.
x workshop from the director to the assistant, from the day before the start of the overhaul, coincidentally unified action, they are the first to arrive at the maintenance site every day, the last batch of departure, the construction project repeatedly check, supervise, fully embodies the cadres of the vanguard model and benchmarking role.
It can be said that throughout the overhaul period, the majority of cadres and workers in the workshop to practical action interpretation of the "division of the tiger and wolf" team spirit, none of the difficulties in front of the retreat, no one in front of the task of the discounts, conditions, no one in the completion of the task of cutting corners, shortcuts. Demonstrate the x workshop in the team building aspects of the gratifying results.
;