Slip Mold Construction Team Phone Number

Slip mold construction company all over the country have the following can be the nearest choice to contact.

1, Inner Mongolia Yike slippery mold team: 18847949949

Yike slippery mold team is a slippery mold construction team and sales and leasing business, after many years of slippery construction of the company has accumulated a certain amount of construction skills, and now has more than 20 sets of imported and domestic slippery molding machine, on all levels of highway curb, shoulder plate, collect (sink) gutter, drainage ditch, and so on. Highway curbstone, shoulder board, collect (sink) trough, drainage ditch, side ditch, U-type canal, small retaining (short) wall have a wealth of construction experience.

2, Henan far slide mold technology limited company: 400-116-9979

Henan far slide mold technology limited company formerly known as Henan Hengda labor company, was founded in 2001, engaged in the early industrial and civil construction of civil construction labor construction, is now specializing in the construction of the slide mold of the independent legal person enterprise. The company currently employs more than 210 people, including two first-class constructors, three second-class constructors, 12 professional slipform engineers, 22 professional construction technicians, more than 110 professional special workers.

3, Yida slipform Anhui Hefei Branch: 400-008-6505

Yancheng City Yida Slipform Engineering Co., Ltd. is a professional contracting qualification of slipform construction enterprises with towering structures engineering. Undertake a variety of chimneys, silos, ash storage, coal silos, inverted cone shell water tower, cooling towers, granulation towers and reinforced concrete structures, such as shaped towers and other towering structures of new construction and slipform construction projects.

Preparation before slipform construction:

1, slipform design. The design of the slide mold device system, and through the analysis and calculation of the load of the slide mold, select a reasonable hydraulic system and support rod bearing capacity and quantity.

2, the treatment of concrete foundation surface, including concrete foundation surface chiseling, rinsing and other work must be completed before the installation of the slide mold.

3, before the installation of the slide mold, must provide the necessary control point line for the installation of the slide mold.

4, slide mold assembly debugging. According to the requirements of slippery mold construction, from the production and installation of slippery mold to assembly and commissioning must be checked and controlled for each process.

5, in the slippery mold construction, do a good job on the technical and material preparations, and through the test on the concrete solid body of the initial solidification time determination, to ensure that the slippery mold in the beginning of the sliding, not due to inadequate technical preparations to affect the speed of sliding or cause the sliding mold stop slip.