Safe use of electricity agreement

In today's society, we gradually recognize the importance of the agreement, the signing of the agreement can solve or prevent unnecessary disputes. Then the relevant agreement in the end how to write it? The following is my collection and organization of the safety of electricity agreement 5, only for reference, we take a look at it.

safe use of electricity agreement Part 1

Project Name:

General Contractor: (hereinafter referred to as Party A) Subcontractor: (hereinafter referred to as Party B)

In order to ensure the safety of temporary electricity at the construction site, to prevent electrocution accidents, according to the "Chinese People's Republic of China *** and the State Safety Production Law", "Regulations on the Management of Safety Production of Construction Works", the Ministry of Construction, "Construction Site Safety Technical Specifications for Temporary Electricity" (JJ), the "Safety Code for Temporary Electricity" (JJ), "Safety Code for Temporary Electricity" (JJ). Safety Technical Specification for Temporary Electricity Use in Construction Site" (JGJ46-88), "Safety Inspection Standard for Building Construction" (JGJ59-99) and the relevant provisions of "Safety Protection Standard for Construction Site of Beijing Municipal Construction Project" sign this agreement. Party A and Party B shall, in accordance with their respective responsibilities, supervise and manage the temporary use of electricity in construction projects, strictly abide by the rights, responsibilities and obligations stipulated in this agreement, and safeguard the safety of temporary use of electricity in construction sites.

1, professional (labor) subcontracting work object and provide labor content

Project location:

Subcontracting scope:

2, subcontracting work period

Starting date of the work:

Ending date of the work:

Total number of calendar days of work:

3, the person responsible for the safety of the temporary electricity

Party A:

Party B:

4, Party A's rights, responsibilities and obligations

4, 1 to implement the relevant provisions of the state and the Beijing Municipal construction site temporary electricity. Responsible for the construction site temporary electricity to carry out comprehensive supervision, management, and construction site temporary electricity safety inspection and guidance.

4, 2 review Party B's temporary electricity applications, and Party B's temporary electricity safety technical measures and electrical fire prevention measures for the record.

4, 3 is responsible for the provision of construction power supply, to provide Party B with construction production and temporary living lighting power supply, and construction power supply to the (by both sides *** with acceptance) in line with the safety standards of the second level of power distribution boxes. And party B's use of supervision and inspection.

4.4 During the period of electricity consumption, accidental power outages or other reasons for power outages, timely notification of Party B. The power supply must be removed before re-powering. Before troubleshooting and re-powering, Party B must be notified.

4.5 When providing power supply to Party B, it should go through the handover and acceptance procedures with Party B.

4.6 The power supply should be provided to Party B in a timely manner.

4.6 Supervise and inspect Party B's temporary electricity equipment and facilities in accordance with relevant temporary electricity standards. Party B found in the temporary use of electricity there are hidden dangers must be instructed to rectify. And supervise the implementation of rectification.

4, 7 on Party B's roster of special operators, a copy of the operating license and training records for the record. Without safety education and training and unlicensed personnel, shall not be allowed to work.

5, Party B's rights, responsibilities and obligations

5, 1 strictly implement the national and Beijing construction site temporary power of the relevant technical specifications and safety regulations, the construction area under its own jurisdiction of the temporary power is responsible for the overall management.

5.2 Provide Party A with a written application for temporary use of electricity. When the equipment and facilities need to increase capacity, you must re-apply for electricity application procedures.

5, 3 to ensure that the secondary distribution box below the jurisdiction of a variety of power equipment, facilities intact, temporary power facilities and equipment must use regular manufacturers of qualified products, is strictly prohibited the use of counterfeit and other substandard products. Strengthen the maintenance work, strictly prohibit all kinds of mechanical and electrical equipment with disease operation. Ensure that temporary electricity meets the relevant safety standards.

5, 4 implementation of the temporary power safety technical briefing system, the construction area under its own jurisdiction of the operator of the temporary power safety technical briefing, to avoid unauthorized command, unauthorized operation and misuse, to ensure the safety of electricity.

5, 5 in the use of Party A to provide temporary power supply, power supply does not meet the temporary power standards, the Party put forward corrective comments. Have the right to refuse to pull and connect the power supply on the power supply that does not meet the standard of temporary power supply. Party A in the safety inspection on the temporary use of electricity problems or hidden dangers, must be required to seriously implement the rectification.

5, 6 on the special operators to carry out pre-job occupational skills, production safety and other aspects of training, without production safety education and training and training and unqualified and undocumented personnel, shall not be allowed to work. Special operators must be licensed in accordance with relevant regulations. Provide Party A with a roster of special operators, a copy of the operating license and training records.

5, 7 site electrocution accidents, identified by the competent authorities belonging to Party B due to violation of the above agreement and unauthorized command, unauthorized operation, the provision of power line facilities without the consent of Party A, unauthorized demolition, alteration, connecting, disobedience to Party A management resulting in accidents, by Party B is fully responsible.

5, 8 is responsible for the unit under the jurisdiction of (from Party B meter and below) the safety of electricity.

5.9 Ensure that the total capacity of the unit's electricity load in the 4, 3 provisions of the load, prohibit overloading of electricity.

5, 10 strict implementation of the "construction site temporary power safety technical specifications" (JGJ46-88), to ensure that the unit under the jurisdiction of (from Party B meter and below) the electrical system is compatible with the Party A power system, to ensure the safety of the entire site temporary power system.

5, 11 temporary power system construction, management should be completed by the appropriate level of professional electricians, non-electricians are prohibited from engaging in work that should be completed by electricians.

5.12 After the occurrence of hidden dangers or problems that hinder the safety of the whole system, it must be reported to Party A immediately. The need for Party A to provide power outages with the Party, apply to Party A in advance, agreed to by Party A and Party A personnel to complete (except for first aid needs due to electrocution accidents).

5, 13 conscientiously carry out the implementation of the provisions of the higher and Party A related to civilization and safety construction, strengthen the unit of temporary power management, standardize the site electrical facilities and protective facilities, improve the internal data.

5, 14 due to the unit violates the relevant norms, standards, regulations and this agreement, triggered by electrical disaster accident, resulting in economic losses or personnel injury, all responsibility, economic losses borne by Party B.

6, Supplementary Provisions

7, this agreement in duplicate, Party A and Party B each sign a copy, effective from the date of signing.

Party A unit: (Chapter) Party B unit: (Chapter)

Signature of the person in charge: Signature of the person in charge:

Year Month Day, Year Month Day

Safe Electricity Agreement Part 2

Party A: China Railway Construction Group ** Branch **Projects Department

Party B:

In order to carry out the "safety first, Technical specification" (JGJ46-20xx), "construction project construction site power supply safety specification" (GB50194-93), the local, the company and the project's temporary power production safety management regulations, seriously implement the production safety responsibility system, to ensure that the realization of ** project safety management objectives, and at the same time, based on the requirements of the contract between the A and B parties, special signing of this temporary power safety management agreement.

I. Description

1. A and B should be based on the contract and the requirements of this agreement, respectively, to do a good job of their respective. Pro power safety management, minimize and eliminate all types of electrical accidents.

2. A and B in the performance of laws and regulations required in the process of safety duties, the need for cooperation between A and B * * * * with the completion of the work, A and B must be strictly in accordance with the agreement agreed upon procedures to ensure that laws and regulations required by the implementation of the duties

3. A and B based on the national and local laws and regulations, the contract and the contents of this agreement in the construction process of written records, as a written record, as the A and B in accordance with the contract and the contents of this agreement. Records, as the main evidence of A and B to fulfill their respective safety responsibilities.

2. The principle of responsibility:

A and B respectively as an independent legal entity, must be strictly enforced in relation to the power safety laws, regulations, standards, norms required as a legal entity should fulfill the responsibility to effectively strengthen their respective units of power safety management, improve their power safety management system.

Three. Party A's responsibility:

1. Party A strictly implement the "construction site temporary power safety technical specifications" (JGJ46-20xx), "construction project construction site power supply safety norms" (GB50194-93) and national, local, Party A higher units and other relevant laws and regulations, norms, standards, regulations, and other requirements to supervise the site of all the construction unit Comply with the implementation.

2. Party A's electrical professionals should be familiar with the construction site of temporary electricity technology, operation, use, safety and other related knowledge and requirements, and regularly organize on-site power lines and equipment inspection.

3. Party A is responsible for providing power supply and power distribution system facilities from the box to the secondary distribution box, is responsible for organizing the temporary power construction personnel in accordance with the specification requirements to install the power distribution system from the box to the secondary distribution box, and organizing its acceptance and reported to the electrical safety authorities.

4. Party A shall bear the main responsibility for the electrical accidents caused by the equipment and lines due to the quality problems of Party A's own power distribution facilities.

5. Party A is responsible for the operation, maintenance, overhaul and supervision and management of the power distribution equipment and lines from the box transformer to the secondary distribution box on site to ensure the normal and safe operation of the above power distribution system, and regularly supervise and inspect the above facilities.

6. All power distribution facilities below the secondary distribution box (including cables connected from the secondary distribution box) shall be provided by the power unit, and Party A shall be responsible for its supervision and management.

7. Party A will regularly educate the construction personnel of Party B on the safety of temporary electricity.

8. Party A is responsible for the supervision and management of construction units in accordance with the "construction site temporary power management regulations", and the construction unit in violation of the provisions of the "construction site temporary power management regulations" to deal with.

safe use of electricity agreement Part 3

Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

In order to strengthen the safety and management of the construction site of the temporary use of electricity, so that the site of the temporary power supply system in the rated capacity, running in the best state, all kinds of electromechanical protection devices to be effectively maintained and maintained, so that it plays the proper protection function, to prevent the occurrence of various types of power consumption. Accidents of all kinds of electricity consumption will be prevented. Clearly their respective responsibilities, rights and obligations, the two sides agreed by consensus to sign the following agreement:

First, A and B must conscientiously implement the state, the Ministry of Construction, the provincial government, the Municipal Construction Committee issued by the relevant safety decrees, laws and regulations and rules and regulations.

Second, Party A provides power, Party B is responsible for the installation of qualified distribution box (with meter), after the completion of the installation, please Party A acceptance before use. Distribution box below the safety maintenance, Party B should be equipped with the appropriate electric pipe with a valid license operators, Party B to the operators in the operation of the written and verbal briefings before. All operators should operate and implement Party A's electricity management regulations in accordance with the instructions and JCJ46-88 and JCJ59-99 standards.

2, Party B in the construction site is not equipped with or not capable of equipped with valid certificates of electric pipe operators, should apply in writing to Party A for electricity supervision, unlicensed personnel shall not be engaged in the operation of electricity.

Third, Party B must comply with Party A's electricity management, Party B's own switch box, mobile box, special box, power cables, electrical appliances, hand-held power tools, lighting appliances and other electrical equipment, must be good performance, in line with safety specifications. Party B should check and accept with Party A when entering the site and before putting it into use, and it can be put into use only after both parties sign. The use of the process of equipment failure that jeopardizes the operation of the system; should immediately stop using, and report to Party A for the record, the fault is not completely discharged before the trial run shall not be energized.

Fourth, Party A is responsible for Party B to provide power, power supply, must be designated by Party A location wiring, not private; and should comply with the following provisions:

l, Party B use of all electrical equipment, appliances, mechanical and electrical shall not be directly in the power supply boxes (cabinets) in the Party wiring, must be provided through the self-contained or Party A to transfer the mobile box.

V. Construction site of the temporary power system by the Party Negative Gong unified management and coordination, Party B construction workers can not alter and change the site of the Party's power lines and equipment. Indeed, due to the needs of the project, a written application should be made to Party A, Party A should be based on the actual need to give a written reply in a timely manner.

Six, Party B is responsible for

Seven, this agreement in duplicate. Party A and Party B each hold a copy.

Party A: Party B:

Seal: Seal:

Responsible person (signature): Responsible person (signature):

Date: Date:

Agreement on the safe use of electricity Part 4

Party A:

Legal Representative:

Residence:

Party B:

Legal Representative:

Residence:

Legal Representative:

Legal Representative:

Legal Representative:

Legal Representative:

Legal Representative:

Legal Representative:

Legal Representative:

Legal Representative:

Residence:

In order to clarify the rights and obligations of Party A and Party B in the use and management of electricity, so that Party B's safe, reasonable and orderly use of electricity, the two sides reached the following agreement by mutual consensus, *** with the trust and strict fulfillment.

First, for the application of electricity

B party to write an application for electricity (which includes voltage level, capacity and address), signed by the office and the company leader agreed by the motorized office is responsible for arranging the professional electrical personnel in accordance with the situation in the appropriate place for docking operations.

Second, the maintenance of electricity facilities management responsibilities

1, Party A and Party B between the power supply and distribution facilities, the property rights of the demarcation point in the user metering meter, that is: the demarcation point of the power side of the power supply facilities by Party A is responsible for the operation, maintenance and management; demarcation point of the load side of the power supply facilities belong to Party B, by the B side of their own operation, maintenance and management.

2, the two sides in charge of the power supply facilities, unless otherwise agreed, without the consent of the other party, shall not operate or change. When encountered endangering the safety of the power grid and electricity, or may cause personal injury or death, equipment damage, or breach of contract electricity, electricity theft, arrears, Party A may change or operate Party B's power supply equipment in accordance with the actual situation.

3, the power metering device and power load management device installed in Party B's power receiving device by Party A is responsible for the management, protection and monitoring of its normal operation, and if there is any abnormality, promptly notify Party B.

4, Party B is responsible for the management, protection and monitoring of its normal operation.

4, Party A may from time to time on Party B's power consumption inspection, Party B shall cooperate.

Third, the responsibility for safety management of power supply and electricity facilities

1, Party B on all of its electrical equipment should be regularly inspected, overhauled and tested, to do a good job of anti-electrocution measures, the timely elimination of hidden equipment, to prevent accidents in electrical equipment.

2, Party B is strictly prohibited to use the hook line, broken stranded line, ground crawling line and insulation of unqualified wire connection.

3, Party B is strictly prohibited to privately change the operation of the low-voltage system, prohibit the use of "one ground, one line" mode of electricity.

4, Party B is strictly prohibited from picking up the broken wire; found that the wire slack to the ground safety distance is not enough or broken, no one shall be close to the wire to stay away from the danger point, the point of breakage of 8

meters, and protect the scene, and immediately report to the electrician to deal with; so as not to expand the scope of the accident.

5, Party B found someone electrocuted, do not pull the electrocuted person with bare hands, should be disconnected from the power supply as soon as possible.

6, Party B should promptly prune or cut down trees and bamboos that may endanger the corridor of the electrified line.

7, Party B should be required to install leakage protector; Party B is not required to install leakage protector, privately lift the installed leakage protector and unauthorized adjustment of the leakage protector setting value, and the responsibility for accidents caused by Party B is responsible for.

8, Party B leakage protector maintenance should be carried out by professionals, in the event of abnormalities in the operation of the electrician should find Party A to deal with.

Fourth, agreed matters and breach of contract

1, Party B did not fulfill the maintenance and inspection obligations in accordance with the agreement, resulting in the operation of electrical equipment with disease, there are security risks, Party A has the right to suspend power supply to Party B directly.

2, Party A shall put forward written rectification opinions on the hidden dangers of Party B's electrical equipment; after Party B rectifies the dangers, acceptance shall be carried out in a timely manner.

3, Party B's temporary power should be applied to Party A in writing in advance, the installation of electrical equipment, temporary power required wires, plugs, sockets, switches should symbolize the requirements of safe electricity; temporary power during the period of temporary power should be set up to look after the temporary power facilities, finished in a timely manner to dismantle.

4, Party B, private connection, unauthorized use of electricity, resulting in electrocution accidents, Party B must bear full legal responsibility.

5, Party B did not implement this agreement or management is not in place, to Party A or the community to bring personal, equipment damage, Party B must bear full legal responsibility. .

5, electricity metering

1, Party B should be required to install power metering devices. The record of electricity metering device as the basis for Party A to Party B to calculate the amount of electricity.

2, Party B to install measuring devices need to be certified by the legal measurement unit for qualified before use.

3, according to the provisions of the national measurement laws and regulations, Party B measurement devices should be mandatory periodic calibration, Party B can not be refused for any reason, Party B shall pay the cost of calibration.

Sixth, electricity charges

1, Party A according to the electricity metering device records to collect the current electricity, the unit price of 1 yuan / KWH.

2, Party A monthly meter reading on the 20th of the month, the 25th of the month to the next month to the 10th to collect the electricity bill to the user. Users refused to pay the electricity bill or late payment of electricity, Party A directly suspend the power supply, resulting in all legal responsibilities and losses incurred by Party B and Party A has nothing to do.

3, Party B can not pay the full amount of electricity to Party A on time, should bear the late payment of electricity,

electricity default charges calculated at 2% per day. If Party B refuses to pay the electricity bill and the default fee without any justifiable reason, Party A has the right to suspend the power supply and collect the electricity bill and the late fee according to the legal procedures.

4. Electricity theft and unauthorized use of electricity is strictly prohibited. Party B, if there is electricity theft and unauthorized use of electricity behavior, each found by the highest load of electricity facilities 10 times the penalty.

VII, the two sides in case of dispute, should be friendly consultation, consultation fails, either party can be sued to the court where Party B.

VIII, this agreement is signed by both parties, and stamped after the entry into force.

IX, the original agreement in four copies. Both sides of the two copies.

(No text below, for the signature of the item)

Party A: (Signature) Party B: (Signature)

Legal representative (or person in charge): Legal representative (person in charge): Signing time: Year Month Signing time: Year Month

Safe Electricity Agreement Part 5

The company (hereinafter referred to as Party A):

Construction team (hereinafter referred to as Party B) Construction Safety Inspection Standards" (jgj 59-1999) of the relevant provisions of the signing of this agreement. A and B shall, in accordance with their respective responsibilities, supervision and management of temporary electricity for construction projects, strictly abide by the rights, responsibilities and obligations set out in this agreement, to ensure the safety of temporary electricity on the construction site.

First, the rights, responsibilities and obligations of Party A

1, the implementation of the state and Beijing construction site temporary electricity regulations, responsible for the construction site temporary electricity to carry out comprehensive supervision, management, and construction site temporary electricity safety inspection and guidance.

2, is responsible for the provision of construction power supply, and construction power supply to the (by both sides *** with acceptance) meet the safety standards of the b-level distribution box, and the use of Party B supervision and inspection.

3, review party B temporary power applications, and party B temporary power safety measures and electrical fire safety measures for the record

4, party B special operators of the roster, a copy of the operator's license and training records for the record; without safety education and training and undocumented personnel, shall not be on duty.

5, to provide power supply to Party B, should be with Party B for the handover and acceptance procedures.

6, in accordance with the relevant temporary power standards on Party B's temporary power equipment, facilities for supervision and inspection; found that Party B in the temporary use of electricity in the existence of hidden dangers must be instructed to rectify the Party B, and supervise the implementation of rectification.

Second, Party B's rights, responsibilities and obligations

1, strictly implement the national and Beijing construction site temporary power of the relevant technical specifications and safety regulations, the construction area under its own jurisdiction of the temporary power is responsible for the overall management.

2, to ensure that the b-level distribution box below the jurisdiction of a variety of electrical equipment, facilities intact, temporary power facilities and equipment must be used regular manufacturers of qualified products, is strictly prohibited the use of counterfeit and substandard products; to strengthen the maintenance work, is strictly prohibited for a variety of mechanical and electrical equipment with disease operation, to ensure that the temporary power to comply with the relevant standards for safe use of electricity.

3, to provide Party A with a written application for the temporary use of electricity; equipment and facilities need to increase capacity, you must re-apply for electricity application procedures.

4, in the use of Party A to provide temporary power supply, the power does not meet the temporary power standards, the right to refuse to pull the power supply does not meet the temporary power standards on the power supply; Party A in the safety inspection of the temporary use of electricity in the existence of the problem or hidden trouble, must be required to seriously implement the rectification.

5, the scene of electrocution accidents, identified by the competent authorities belonging to Party B due to violation of the above agreement and unauthorized command, unauthorized operation, the provision of power line facilities without the consent of Party A unauthorized demolition, alteration, connecting, disobedience to Party A management resulting in accidents, by Party B is fully responsible.

6, the implementation of temporary power safety technology briefing system, the construction area under its own jurisdiction of the operator of the temporary power safety technology briefing, to avoid unauthorized command, unauthorized operation and misuse of code operation, to ensure the safety of electricity.

7, the special operators for pre-job occupational skills, production safety and other aspects of training, without production safety education and training and training and unqualified and undocumented personnel, shall not be allowed to work; special operators must be in accordance with the relevant provisions of the license on duty; to the Party to provide a roster of special operators, a copy of the operator's license and training records.

Third, the party related to the unfinished business supplemental provisions

Supplemental provisions are as follows:

This agreement in duplicate, the A and B parties to save a copy of the two sides, both signed and sealed after the entry into force.

This agreement is effective from the date of signature, until the termination of the completion of the project.

Party A (seal): Party B (seal):

Signature of the person in charge.