Building construction enterprise project manager job responsibility system?

(1) to establish the project management team, mobilize construction forces, set up the appropriate engineering management personnel team, organize the preparation of operational plans, and issued construction tasks, signed team contracting contracts.

(2) Organize the study and training of accounting personnel on national financial policies, financial regulations, professional knowledge, and company management system, educate them on ideology and professional ethics, evaluate the performance of those who should be recruited for the job, and improve the comprehensive quality of accounting personnel.

(3) Continuously introducing and absorbing advanced financial management experience, promoting the establishment of scientific and reasonable financial management methods, and actively promoting the modernization of the company's financial management and accounting work to meet the standards of upgrading.

(4) investigate and understand the characteristics of the construction project, engineering profile and nature, figure out the design scale, structural characteristics, process flow, master the main equipment performance, design budget, figure out the total duration of the project and the construction of the project in phases and batches of supporting the delivery of sequential requirements, delivery of the drawings of time, the quality of engineering and construction requirements, technical difficulties.

(5) investigation to grasp the construction site and the local natural conditions, terrain and environmental conditions, geological conditions, seismic levels, engineering hydrogeology, meteorological conditions.

(6) Investigate the local technical and economic conditions, understand the capacity of water supply, power supply, heat supply, gas supply (oxygen, acetylene) and transportation conditions, local material supply and local collaboration conditions and supply conditions of major equipment.

(7) Investigate the social living conditions, find out the surrounding houses that can be utilized for the construction, the distribution of nearby institutions, enterprises and residents, living habits and transportation, food supply, medical care, commerce, post and telecommunications, and law and order conditions.

(8) must clarify the construction unit construction preparation for implementation, site three through a leveling implementation, the handling of obstacles, according to the provisions of the contract should provide materials, equipment, the arrival of the situation.

(9) the organization of materials, components, semi-finished products ordering, production, storage and transportation and materials, machinery and equipment rental, site, stacking and other management.

(10) according to the material budget, the organization of the construction of the preparation of the material procurement plan, by the purchaser to understand the market price, by the constructor audit, project manager approval before selecting the supply unit order.

(11) According to the requirements of the construction design, the organization of the relevant personnel in advance to reserve materials and special materials used in the construction of winter and rainy period.

(12) According to the cement and power supply provided by the construction unit, connect the construction water supply, drainage, electrical appliances, lighting, communication and ventilation lines, and pave the circulating road for construction in combination with the permanent road base.

(13) According to the general layout plan of construction, organize relevant personnel to build temporary production facilities and living facilities.

(14) Perform all duties as the first person responsible for safety and fire protection in the project department.

(15) Completing other tasks assigned by the general manager's office.

For more information about engineering/service/procurement bid writing and production, to improve the winning rate, you can click on the bottom of the official website customer service free consultation:/#/?source=bdzd