How much is the 10,000-level purification workshop project, and the 10,000-level purification workshop quotation?

How much is purification workshop per square meter?

1 .100,000 purification workshop decoration cost is affected by what factors? It is mainly determined by eleven elements such as host system, terminal system, ceiling, compartment, floor, purification level, illumination requirements, industry category, brand positioning, ceiling height and area. Among them, the ceiling height and area are basically constant factors, and the other nine are variable. Take the host system as an example. There are four types of chillers in the market: direct expansion type, air-cooled type and water-cooled type. The prices of four different units are completely different, and the gap is very large.

Fujian Shunshi Construction Engineering Co., Ltd. is a professional purification engineering company engaged in the planning, design, installation and maintenance of cleaning central air conditioning, cleaning industrial workshops and constant temperature and humidity cleaning systems.

2. Generally speaking, purification workshop quoted 300,000 ~ 65438+100,000 yuan; 10,000-class clean workshop1000 ~ 2,000 yuan/m2.

Factor influencing that price per square met of clean workshop

1. Workshop area

The size of the area will directly affect purification workshop's quotation, because the size of the area determines the number of boards to be used, and also determines the volume of air conditioners to be installed, the reasonable air supply mode, how much is needed, and so on.

2. Cleanliness grade

We know that dust-free purification workshop can be divided into: 100 category >; Thousands > 10,000 > 100,000 > 300,000. The smaller the number, the higher the level, and the higher the level, the higher the cost, which is also one of the reasons that affect the cost of purification workshop.

4. Select materials and equipment for the workshop.

A penny for a penny, the higher the natural price of the selected purification materials.

5. The story height of purification workshop.

The purification workshop of some factories is not on the first floor, but may be on the 1 floor or on the second floor or higher, which will bring trouble to the materials entering and leaving, and some purification engineering companies will also increase the cost.