Instrument Contract

2020 Instrument Contract Sample (General 3)

In a society where people believe more and more in the law, contracts help us more and more, and the signing of a contract can lead to the standardization of the commitment of both parties and the fulfillment of cooperation. So do you know the format of the contract? Here is my carefully organized 2020 instrument contract (general 3), I hope it can help you.

Instrument Contract 1

Seller (Party A):

Buyer (Party B):

Article 1: The subject product, quantity, price and delivery (pick-up) time

Contract No.: Ning Sifen 20xx0105-01 Place of signing: fax copy Time of signing: January 5, 20xx

Article 2: Quality standard: Comply with the provisions of the relevant industry national standards.

Article 3: the seller is responsible for the quality of the conditions and period: use in accordance with the specifications, the host three packages for one year, lifelong maintenance. Article 5: Random necessities, accessories, tools and the number of supply methods: random accessories, etc. see the packing list of each instrument, shipped with the host, the long-term supply of instrument accessories.

Article 6: Reasonable loss standards and calculation methods: the instrument is damaged during transportation, Party A is responsible for reissuing, but Party B needs to provide relevant proof.

Article 7: The ownership of the products will be transferred from the time of payment, but if Party B does not fulfill the obligation to pay the price, the products listed in the contract belong to Party A.

Article 4: The products will be used for the purpose of the contract, and will be used for the purpose of the contract.

Article 4: Packaging standards, supply and recycling of packaging: wooden or cardboard boxes anti-seismic packaging, without recycling.

Article VIII: Delivery (pick-up) mode, location: highway or railroad to Party B's use.

Article 9: Transportation mode and arrival station (port) and cost burden: railroad or highway transportation, freight costs borne by Party A.

Article 9: Transportation mode and arrival station (port) and cost burden: railroad or highway transportation, freight cost borne by Party A.

Article 11: installation and commissioning of complete sets of equipment: Party A free door-to-door installation. Commissioning. Free training of laboratory operators. Teach until.

Article 10: inspection standards, methods, locations and deadlines: according to the instrument instruction manual by Party B on the spot with the national standard sample acceptance.

Article XII: Settlement, time and place: 40% of the purchase price in advance after delivery; equipment installation and commissioning is completed to pay 60%.

Article 13: the conditions for the termination of this contract: After the contract comes into effect, both parties shall not change or terminate it at will, otherwise it will be regarded as a breach of contract.

Article 14: Liability for breach of contract: Within the validity of this contract, if there is a breach of contract in accordance with the contract law and the implementation of Article 15.

Article 15: the contract dispute resolution: the contract in the performance of disputes between the parties to the negotiation process; can also be mediated by the local administration for industry and commerce; consultation or mediation fails, by the people's court jurisdiction of the contract signing place.

Article 16: This contract shall enter into force upon signature and seal of both parties.

Article 17: Other matters:

1, the contract fax both parties as a valid text.

2. This contract is a contract for the distribution of preferential prices.

Party A (official seal): _________ Party B (official seal): _________

Legal Representative (Signature): _________ Legal Representative (Signature): _________

_________ ____ month ____ day _________ year ____ month ____ Day

Instrument Contract 2

Demanding Party (Party A): _____________________________

Supplying Party (Party B): _____________________________

1. Equipment Model and Quantity

Party A buys from Party B the one produced by Party B ________________________________, please refer to Annex I for the specific supply list.

2. Total Contract Price

2.1 The total contract price is _____________¥, RMB (capital): _________________________________.

2.2 The total contract price is for delivery in Guangzhou, excluding transportation and packaging costs.

3. Payment and Settlement Methods

3.1 Within the same day of the signing of the contract, Party A will pay _____% (i.e., ___________¥¥) of the total amount of the contract to Party B by wire transfer as deposit.

3.2 On the ______th day after the signing of this contract, Party A will pay _____% (i.e. ___________¥¥) of the total amount of the contract to Party B as the settlement of the payment for the delivery by telegraphic transfer.

3.2 Party B issued to settle the payment for the goods with Party A.

4. Equipment delivery

Party B in the receipt of Party A full payment within two days after the location of Party B issued the goods referred to in this contract.

5. Delivery of equipment

5.1 Delivery place: _______________ The mode of transportation and freight charges shall be borne by Party A. The delivery of equipment shall be made in accordance with the terms and conditions of this contract.

5.2 Party A requests to postpone the delivery period agreed in the contract for any reason, it is necessary to notify Party B in writing before _____ days from the delivery period, which will take effect after Party B confirms it, otherwise Party B has the right to request Party A to pay the lost labor cost and freight cost caused by it.

6. Signing acceptance of equipment

6.1 After the arrival of the equipment, Party A personnel to inspect and sign for the equipment. "Signing receipt" Party A to send back to Party B by postal courier, such as the goods arrive at the location of Party A within one week, Party A did not send back the "signing receipt", as signing receipt of qualified processing.

6.2 If Party A finds that the specification or quantity of the equipment does not match, Party B is responsible for replacing or making up for the delay in Party A's use, Party B shall bear the corresponding liability.

7. Equipment installation and commissioning and guidance

7.1 Party B to provide free equipment installation and commissioning of all drawings and technical information, and free guidance services, in the commissioning process in Party A, if encountered technical difficulties, according to the need for Party B to send engineers to the construction site of the Party to provide guidance, all the lodging and travel costs of Party B's engineers from the Party is responsible for.

7.2 Party B's engineers on-site guidance time in no more than _____ days, Party B no longer charge other service fees.

8 . After-sales service

8.1 equipment from Party A after signing, Party B is responsible for one year free warranty (except for man-made and force majeure factors causing damage to the equipment), after the expiration of the free warranty period, Party B to provide lifelong paid maintenance services.

8.2 In the free warranty period, the machine naturally damaged all the spare parts Party A should be mailed back to Party B for free repair and replacement. If there is a major problem that can not be solved by phone, fax, e-mail, etc., Party B shall send engineers to Party A to view the guidance, the costs incurred by Party B is responsible for.

9. Liability for breach of contract

9.1 If Party B delays the delivery of goods without any justifiable reasons and exceeds the supply period, Party B will pay liquidated damages to Party A according to the total amount of the contract ` ___________ per day.

9.2 If Party A fails to make payment within the stipulated time, Party B shall pay liquidated damages to Party B at the rate of `_________ of the total contract amount per day.

9.3 If Party A refuses to accept the goods without any reason, Party A shall bear the loss caused to Party B as a result.

10. Force majeure

Force majeure caused by this contract can not be performed or can not be performed in accordance with the agreed conditions, affected by the force majeure conditions of the party should be as soon as possible to notify the other party in writing, by the two sides to negotiate to resolve whether or not to exempt or partially exempted from the performance of the responsibility to perform this contract, the extension of the performance of the contract or termination of the contract, the two sides can also be renegotiated to perform the method.

11. Dispute resolution

A and B in the fulfillment of this contract in the process of dispute, should be resolved through friendly consultation, consultation fails, you can file a lawsuit to the People's Court of the location of the Party B.

12. The entry into force of the contract

12.1 This contract shall enter into force after the signature and seal of both parties by facsimile, and the exchange of original documents by postal courier.

12.2 The contract in two copies, each **** ________ page, A and B each party.

13. Other matters.

Other outstanding matters to be resolved by the two sides through friendly consultation.

Party A: __________________

Party B: __________________

Date of signing: __________________

Instrument Contract 3

Lessee: (hereinafter referred to as Party B)

Lessor: (hereinafter referred to as (hereinafter referred to as Party A)

According to the relevant provisions of the Contract Law, in accordance with the principle of equality and mutual benefit, in order to clarify the rights and obligations of Party A and Party B, by consensus of the two sides, the signing of this contract.

Article 1: The name of the leased equipment: .

Equipment use location: . agent) at the place of delivery. Party A shall not be responsible for any delay in delivery of the leased equipment due to unforeseeable, unavoidable and insurmountable objective circumstances.

2. Party B shall check and accept the leased equipment at the delivery place within 24 hours from the time of receipt, and at the same time hand over the receipt of leased equipment to Party A after signing and sealing.

3. If Party B fails to handle the acceptance in accordance with the time specified in the preceding paragraph, Party A shall regard the leased equipment as having been accepted by Party B in a complete state, and shall regard Party B as having delivered the acceptance receipt of the leased equipment to Party A.

4.

4. If Party B finds that the model, specification, quantity and technical performance of the leased equipment are inconsistent, defective or flawed during the acceptance inspection, Party B shall immediately notify Party A in writing of the above situation on the day of delivery, and Party A shall be responsible for handling the situation; otherwise, the leased equipment shall be deemed to comply with the agreed requirements of the Contract and the Annexes.

Article 8: Use, repair, maintenance and cost of leased equipment

1. If Party B can not troubleshoot the equipment during the working process, Party A should be notified in time for maintenance.

2, leased equipment in the process of installation, storage, use of all costs incurred in the process, tax, are borne by Party B.

Article 13: the two sides to negotiate a solution to any outstanding issues. Annexes to this contract have the same effect as this contract. This agreement in two copies, Party A and Party B each take one, both signed and sealed after the entry into force.

Party A (official seal): _________ Party B (official seal): _________

Legal Representative (Signature): _________ Legal Representative (Signature): _________

_________ ____ month ____ day _________ _________ month ____ Day

;