For the new server room, from the construction point of view, in addition to the above systems, also includes server room decoration works.
The power supply and distribution system: it includes the introduction of power lines outside the server room, power distribution cabinet, UPS power supply, lightning protection and grounding.
Comprehensive wiring system: including network cabinets, optical cable laying termination, bridge, etc..
Air conditioning and fresh air system: including precision air conditioning room, fresh air machine and air ducts.
Security system: including access control equipment, video surveillance equipment, intrusion alarm equipment.
Environmental power monitoring system: including temperature and humidity monitoring, power distribution monitoring, water leakage detection, fire alarm and lightning monitoring, security detection, large screen display, etc..
Fire protection system: including fire alarm, gas extinguishing and so on.
KVM system: multi-computer switch and interface equipment.
Machine room decoration: including top floor dustproof, top floor waterproof, top floor heat preservation, anti-static flooring, sound-absorbing ceiling, wall and column fireproofing decorative panels, fireproof glass, fire doors, etc..