Drought relief work is intense and orderly, we need to drought relief work related to the meeting to simply record, on the drought relief work of the meeting brief how to write? The following is organized by me for you "on the drought relief work conference briefing (selected 7)", for reference only, welcome to read this article.
Part I: on the drought relief work conference briefingRecently, due to rising temperatures, dry weather, precipitation is low, to the town of the masses of production, life has brought certain adverse effects. In order to stabilize agricultural production, to ensure that the normal production and life of the town's people are not affected, the town party committee and government to take active action to carry out comprehensive drought relief work.
First, strengthen the leadership, clear responsibilities
x month x day, the town held an enlarged meeting of the party committee, the special study of drought mitigation work specific implementation program. The participants **** with the research decision, the town set up a drought mitigation work leading group.
Second, the implementation of the work, drought protection
Due to the scarcity of precipitation, and the town territory of the large rivers and other rich natural water sources, the masses of production, life mainly rely on the Wuyinquan, weir, reservoirs, wells and water supply in the only three water plants, the constraints are greater. In order to ensure that the town's normal production, life is not affected, the town party committee, the government to add measures, think of ways, from the following aspects of the drought mitigation work:
First, the timely fight early. In order to ensure crop production, the town party committee, the government held a special town, village meetings, arrangements for the deployment of spring production for early work. Requirements of the town agricultural service center, villages, communities to vigorously publicize, reasonable division of labor, and actively organize the town's labor force in x month x day, x day and x end of the month, respectively, to complete the early sowing of corn, sweet pota beans, rice, and at the same time, require villages to ensure that no less than xx acres of land paved with mulch, used to drought moisture insulation, to ensure that the yield is stable.
The second is to increase water storage. Requirements of the village, community weir ponds, reservoirs to increase water storage efforts, without consent shall not be arbitrary water, water. The villages and communities should arrange for specialized personnel to supervise and guard the weir and reservoir water storage situation, to ensure that the masses of production, living water abundant and worry-free.
Thirdly, to find water sources by all means, to ensure that people and animals drinking water.
Fourth, the whole leakage. Requirements of the village, the community to organize the force of the Wu Yin canal and the diversion of water pipes and drains for dredging and leakage, to ensure that the water diversion of the water system is smooth.
Fifth, self-checking and mapping. Township party and government offices, agricultural service centers and villages, communities to work closely with the township affected by the drought area to carry out self-checking and mapping to understand the situation of the disaster, the rational allocation of drought resources to ensure that the township smoothly through the drought period.
Sixth, adhere to the waterway to go dry road, to ensure that the disaster year does not reduce the disaster.
Seven is to successful people and social donations to support the affected areas, the masses.
Eight is to strengthen the epidemic prevention and control of disease, to ensure that the masses are healthy.
Three, the disaster summary, clear disaster
After all the town, village cadres mapping survey, the town's agricultural production disaster situation is as follows: wheat affected area xx, disaster area xx acres, oilseed rape area xx acres of crop failure; can not be planted in the area of xx acres of maize; human and animal drinking water difficulties in the village of x, difficult community xx; the affected population up to xx more than people, the town because of the drought water burned transformer a xxkva, and x social three three installed xx kilowatts of irrigation station can not be used normally.
Fourth, there are problems
The lack of disaster relief funds; late sowing in the spring, slow growth; labor tension, the lack of drought labor.
Part II: on the drought relief work conference briefingxx Township is located in the southernmost part of xx County, jurisdiction x administrative village, x.x million people, the township drought work report. The land within the territory is barren, for a long time, due to the weak economic foundation, agricultural infrastructure conditions lagging behind, agricultural production rely on the phenomenon of food is more serious. 20xx x month since, my township suffered xx years have not encountered the big drought, up to now, the territory did not have an effective rainfall. The persistent drought, not only led to the sowing of x.x million acres of wheat has x.x million acres in extreme drought conditions, and affects some of the village of human and animal drinking water, a serious crisis in my township summer grain safety, human and animal drinking water and social stability.
In order to win the drought watering wheat work, to ensure that the summer grain production and social stability, 20xx x month x day after the province's drought watering wheat work video and telephone conference, my township immediately held a mobilization meeting, combined with the reality of the township, the deployment arrangements for this work. The main practices are:
A, strengthen leadership, clear responsibility, strict accountability.
The establishment of the township party secretary for the political commissar, the mayor of the township as the commander of the drought watering work command, from the height of the political to the general public responsible attitude, the drought watering work as the current center of the work of the overriding importance of the practical position. The implementation of the party and government team members packet, institutional cadres packet village work responsibility system. Specialized in the establishment of a special inspection team, with comprehensive supervision of the village drought work progress. Township party and government team members a day a meeting, two days a work bulletin, timely notification of the progress, found that the problem is timely study and solve. At the same time to ensure that the drought tasks to implement, achieve practical results, the implementation of a strict accountability mechanism. On the organization of strong, rapid action, the effect of units and individuals, to reward, on the negative coping missed the opportunity, resulting in adverse consequences and even bad influence, resolutely in accordance with the relevant provisions of the investigation to be strict from the fast.
Two, widely publicized and mobilized, the formation of the whole society to participate in the support of the work of the atmosphere.
First, the seriousness of the drought situation, so that the people really understand the current serious situation, active participation, self-reliance, drought protection. The second is to make full use of the higher level of support and preferential policies. Such as the purchase of water pumps subsidies x%, irrigation costs more than x yuan / mu, repair their own sick and bad water conservancy facilities for drought subsidies, etc., to ease the financial pressure, increase the irrigated area. Thirdly, we are making active efforts to use the funds and materials supported and assisted by the relevant departments at the higher level for drought relief and maximize the benefits. Thanks to the publicity, many advanced units and exemplary individuals emerged during the progress of the drought relief work in the whole township. City xx insurance company heard that the village of deserted slope deep well pump damage, drinking water difficulties, from the expenditure of funds out of x yuan, immediately sent to the village cadres, to solve the pressing problem; City Labor Bureau sent two backbone, living and eating in the township, with the people together in the front line of the drought, the County Electricity Bureau is also free of charge donations of submersible pumps, xx village branch secretary xx, regardless of their own wheat, leading the village cadres, repairing water facilities, repair of irrigation stations, for the whole village, the village of xx village branch secretary, regardless of their own wheat, leading the village cadres, repair water facilities, and repair of irrigation stations, for the whole township. The village branch secretary xx, regardless of their own wheat, led the village cadres, repair water conservancy facilities, repair irrigation station, for the village added x acres of irrigated area, their own land is not watered a point; County Electricity Bureau employees xx, the hometown of the masses, personal donations to the pumps two, valued at more than x yuan. These advanced units and individuals typical deeds, and constantly inspire the whole township groups drought watering wheat for a good harvest of confidence and determination.
Three, increase investment, restoration, new irrigation facilities, try to increase the irrigated area.
After the census, the original water conservancy facilities in my township, only x mu of irrigable area. In order to increase the irrigated area, in the new year, the beginning of the financial situation is very tight to raise funds from all sides x.x million yuan, to buy irrigation equipment for the repair of bad water conservancy facilities and new water sources to explore the use of. *** repair lift irrigation station x, buy water pumps x, cable x meters, repair channels x meters, new irrigation area x acres. At the same time carefully organized, large staff, seize the favorable opportunity to do a good job of drought watering wheat. At present, the whole township day labor x people, irrigation machinery x Taiwan, the average daily watering x more acres. The whole township has irrigated wheat x mu, is expected to have another x days or so with irrigation conditions of the plot can be all watered.
At present, my township drought watering wheat work has made some progress, but with the depth of the work, some problems are increasingly prominent. First, due to the gradual increase in the difficulty of irrigation, the cost has increased, the people's enthusiasm has declined; Second, the drought is too serious, the original drought supplies such as pumps, cables, etc. far from meeting the needs of the short-term financing of these materials is very difficult; Third, the drought funds are seriously inadequate. As the drought work continues to promote the exploration and utilization of new water sources, the construction of new water conservancy facilities require a sharp increase in the number of funds, the township financial pressure is too great, the village collective and the people are unable to afford.
The above problems and difficulties, we will do everything possible to mobilize the positive factors, as soon as possible to solve and overcome, to ensure that the drought watering wheat work to achieve ultimate victory, to ensure social stability.
Part III: Briefing on the drought relief work conferenceFrom the City Flood Control Office was informed that since the beginning of the flood, the city's frequent occurrence of heavy rainfall, flood control situation is grim. According to the State General Administration of Flood Control, autonomous regions and the Office of Flood Control and Drought Relief Command issued a notice as well as the requirements of the municipal party committee and the municipal government, the city to further arrange the deployment of the current flood control and drought relief work.
Municipal Flood Control Office requires all levels of flood control responsible person in accordance with the autonomous region of the deployment of the Flood Control and Drought Relief Command and the deployment of flood control and drought relief work of the executive head of the deployment of arrangements to serve as the administrative responsibility for reservoirs and hydropower stations to carry out a flood control inspection. Municipalities, counties, townships and villages in charge of reservoirs and mountain ponds should be responsible for in place, duty in place, inspection in place, reporting in place. Flood control at all levels of responsibility must maintain 24-hour cell phone free, so that not constantly on duty, not lack of duty.
At the same time, the counties and districts (development zones) Flood Control and Drought Relief Command, the relevant units should be in accordance with the duties and responsibilities of the division of labor, the strict implementation of 24-hour duty and the leadership of the shift system, to strengthen the collection of rain, water conditions, disaster reporting work. On the basis of the pre-flood safety inspection, the city's dangerous reservoirs and hydropower stations, flood control projects under construction, people focus on flood-prone areas, flash flood hazardous areas, geological hazards, urban flood control and drainage, emergency pumping facilities and other flood risk potential points and weaknesses of a major investigation, the problems found during the inspection, to be written to put forward corrective comments, rectification by a deadline.
The city's flood control department will also further improve the emergency plan, emergency preparedness, so that personnel in place, disaster relief supplies in place, coordination and cooperation in place. Once the danger and disaster, we must quickly do a good job of rescue and evacuation and transfer of the masses to ensure the safety of people's lives and property, and minimize losses.
Part IV: Briefing on the drought relief work conferencex month x, the city's flood control and drought relief work conference was held. The meeting informed the weather situation this year and last year's flood control and drought relief work, arrangements for the deployment of this year's flood control and drought relief work, signed a flood control work responsibility. Vice Mayor, City Drought and Flood Control Command Chief xxx attended the meeting.
xxx pointed out that since the main flood season last year, the party committees at all levels, the government and the drought and flood control headquarters of the members of the unit to strengthen the work of measures, timely forecasting and early warning, proper disposal response, minimize the disaster losses. This year, the city's flood control and drought situation is still serious, all levels of units from the overall height, and effectively strengthen the sense of responsibility and urgency to do a good job of flood control and drought relief work.
xxx emphasized that all units at all levels should strengthen the understanding of prevention in the first place. To strengthen the implementation of the responsibility and hidden trouble investigation, focusing on key areas, key parts and key links, do a good job xx reservoir and xx reservoir and a variety of reservoirs under construction, hydropower stations, silt dams, tailing ponds hidden trouble investigation, to do a full coverage without omission.
To strengthen the early warning monitoring, make full use of the monitoring and early warning system that has been built, comprehensively monitor the rain and water conditions, and carry out timely forecasts and warnings. To strengthen the discipline, the strict implementation of the leadership and 24-hour duty system. To adhere to the flood control and drought relief, around the masses of drinking water safety and drought agricultural production, in advance to develop practical countermeasures program to ensure that the flood control and drought relief work to achieve tangible results.
Part V: Briefing on drought relief work conferenceFrom the City Flood Control Office was informed that since the beginning of the flood, the city's heavy rainfall occurs frequently, the flood control situation is grim. According to the State General Administration of Flood Control, autonomous regions, flood control and drought relief headquarters office issued a notice as well as the requirements of the municipal party committee and the municipal government, the city to further arrange the deployment of the current flood control and drought relief work.
Municipal Flood Control Office requires all levels of flood control responsible person in accordance with the autonomous region of the deployment of the Flood Control and Drought Relief Command and the deployment of flood control and drought relief work of the executive head of the deployment of arrangements to serve as the administrative responsibility for reservoirs and hydropower stations to carry out a flood control inspection. Municipalities, counties, townships and villages in charge of reservoirs and mountain ponds should be responsible for in place, duty in place, inspection in place, reporting in place. Flood control at all levels of responsibility must maintain 24-hour cell phone free, so that not constantly on duty, not lack of duty.
At the same time, the counties and districts (development zones) Flood Control and Drought Relief Command, the relevant units should be in accordance with the duties and responsibilities of the division of labor, the strict implementation of 24-hour duty and the leadership of the shift system, to strengthen the collection of rain, water conditions, disaster reporting work. On the basis of the pre-flood safety inspection, the city's dangerous reservoirs and hydropower stations, flood control projects under construction, people focus on flood-prone areas, flash flood hazardous areas, geological hazards, urban flood control and drainage, emergency pumping facilities and other flood risk potential points and weaknesses of a major investigation, the problems found during the inspection, to be written to put forward corrective comments, rectification by a deadline.
The city's flood control department will also further improve the emergency plan, emergency preparedness, so that personnel in place, disaster relief supplies in place, coordination and cooperation in place. Once the danger and disaster, we must quickly do a good job of rescue and evacuation and transfer of people to ensure the safety of people's lives and property, and minimize losses.
Part VI: Briefing on the drought relief work conference
x month x, the city held 20xx flood control and drought relief work video conference, analysis of 20xx flood control and drought relief work in 20xx facing the new situation, the deployment of 20xx flood control and drought relief work.
The meeting pointed out that since the beginning of the flood in 20xx, the city's rainfall and the amount of water coming from the rivers is less than the same period in previous years 1 to 5 into the major rivers have not appeared in the flood process, is expected to be the main flood season in 20xx (June to September) x river, x river main stream, xx river and other major rivers in the possibility of larger floods. Departments at all levels should firmly establish a sense of risk, calmly face the new situation of flood control and drought relief, and effectively improve the flood control and disaster emergency response capacity.
The meeting requested that all departments at all levels to fully recognize the achievements and enhance the confidence and determination to do a good job in flood control and drought relief work; to firmly establish a sense of coordination and effectively improve the comprehensive coordination capacity; to clarify the objectives and strengthen the implementation, highlighting the safety of reservoirs to do a good job in preventing and controlling the work, and to ensure that the full completion of the flood control and drought relief work in 20xx task; to strengthen the publicity and training drills, and to strengthen the flash floods and geologic hazards. Publicity and education to improve the public awareness of disaster prevention and avoidance.
At the meeting, the Municipal Meteorological Bureau, the Municipal Hydrology and Water Resources Bureau made a report and speech. Vice Mayor xxx attended the meeting.
Part VII: Briefing on the drought relief work conference
x month x morning, xx province xx city held a flood control and drought relief work press conference to inform the city's first half of the rain disaster situation, the main work of flood control and disaster relief so far this year, as well as the second half of the flood control and drought relief work opinions.
By the end of x, xx city **** there are xx townships affected
This year, the city's total rainfall is excessive, extreme rainfall is more frequent, in the first half of the year, there have been x times of heavy rainfall process, the cumulative rainfall of xx millimeters, more than the average of all previous years 32%, the overall presentation of the asymmetric state of the South and North is less and more spatial and temporal distribution of this year's heavy rainfall process is not uniform, the high degree of localized rainfall concentration, triggering serious disasters. The city's rainfall is highly concentrated, leading to serious disasters. As of the end of June, the city **** there are xx townships affected by the disaster, the affected population of xx million people, the transfer of the population of x million people, missing x people, death x people, flooded towns x, collapsed houses xx, crop damage area of xx million acres.
In the face of the severe flood control situation, the xx municipal government attaches great importance to, in accordance with the natural disaster to resolve, the guiding ideology of man-made disasters to put an end to, in advance of the arrangements for the deployment of flood control tasks. The counties, the relevant departments focus on strengthening forecasting and early warning, the first time to send disaster warning information, mastering the initiative of flood control and disaster prevention; flood control related departments pay close attention to the duty patrol, strict implementation of the 24-hour duty system; increase the Xiangjiang River mainstem power plant coordination and scheduling, supervise the large and medium-sized reservoirs and the main power station to strictly implement the flood season operation program, adhere to the scientific scheduling, to maximize the reduction of disaster losses; the disaster occurred after the various Relevant departments to effectively fulfill their responsibilities to ensure that the affected people have food, clothing, cover, clean water, temporary shelter, basic medical care.
In the second half of the year, flood control and drought relief are both important.
This year, xx City, the main flood season rainfall is concentrated, after the flood season will be affected by the typhoon, the overall pattern of flooding before the drought. According to the meteorological department forecast, xx city from July to September total rainfall is 4 to 6% less, there is a moderate intensity of more than the summer and fall drought; this year's high summer temperatures, high temperature days more than normal, the daily maximum temperature of more than 35 ℃, the extreme maximum temperature of up to 40 ℃.
In response to the weather conditions before the flood and drought, the city's flood control and disaster relief headquarters informed the second half of the flood control and drought relief work opinions. Opinions pointed out that the city should adhere to the flood control and drought control, both hands, based on the flood control, to ensure the safety of water conservancy facilities, the defense of flash floods and geologic disasters; focus on drought control, to do a good job in the big drought, drought control, long drought preparation, in the premise of security to do a good job of storage and preservation of water, the scientific scheduling of water resources, and grasping the construction of drinking water projects, to ensure that the whole year the farmers increase their incomes and safety of drinking water for humans and animals.