What construction knowledge should the data clerk know?

Part I Pre-construction Information

1, Notice of Award and Construction Permit

2, Construction Contract

3, Supervision Contract for Supervision Works

4, Approval of Construction Drawing Examination and Construction Drawing Examination Report

5, Quality Supervision Registration

6, Quality Supervision Submission and Quality Supervision Work Program

7, Geotechnical Investigation Report

8, Construction Drawing Review Record

9, Quality Supervision Work Program

9, Geotechnical Investigation Report by Supervisor Program

7, Geotechnical investigation report

8, Record of construction drawing review

9, Construction organization design or construction program approved by the supervisor (or the owner)

10, Construction commencement report

11, Registration form of quality management system

12, Record of quality management inspection at construction site

13 Technical delivery record

14. Measurement and positioning record

Part II Quality Acceptance Data

1. Foundation trench inspection record

2. Foundation piling quality acceptance report

3. Foundation treatment quality acceptance report

4. Foundation and foundation division quality acceptance report

5. Quality Acceptance Report of Structural Division Works

6. Quality Acceptance Report of Special Division Works

7. Acceptance Report of Laying Lines

8. Quality Acceptance Record of Foundation and Foundation Division and its Sub-divisions, Sub-items and Inspection Batches

9. Quality Acceptance Record of Main Structural Division and its Sub-divisions, Sub-items and Inspection Batches

10, Decoration division and its sub-divisions, sub-projects, inspection batch quality acceptance records

11, roofing division and its sub-divisions, sub-projects, inspection batch quality acceptance records

12, water supply, drainage and heating division and its sub-divisions, sub-projects, inspection batch quality acceptance records

13, electrical division and its sub-divisions, sub-projects, inspection batch quality acceptance records

14, Intelligent Division and its sub-divisions, sub-projects, inspection batch quality acceptance records

15, Ventilation and Air Conditioning Division and its sub-divisions, sub-projects, inspection batch quality acceptance records

16, Elevator Division and its sub-divisions, sub-projects, inspection batch quality acceptance records

17, Unit Works and its subunits, quality of completion of the project acceptance record Record

18, outdoor work of the division (sub-division), sub-item, test lot quality acceptance record

The third part of the test data

1, cement physical properties test report

2, sand, stone test report

3, each strength level of the concrete ratio test report

4, concrete test specimen strength statistics, evaluation table and test report

4, concrete test specimen strength statistics, assessment form And test report

5, the strength grade mortar proportion test report

6, mortar specimen strength statistical table and test report

7, brick, stone, block strength test report

8, steel mechanics, bending performance test report and welding joints of reinforcing bars tensile, bending test report or reinforcing bars mechanical connection joints test report

10, pile foundation engineering test report

11, steel structure engineering test report

12, curtain wall engineering test report

13, waterproof material test report

14, metal and plastic exterior doors, windows test report (including materials and three properties)

15, the pull-out strength test report of exterior wall tiles

16, building (structure) lightning protection device acceptance test report

17, special requirements or design requirements of the backfill compaction test report

18, quality acceptance specification of the other test reports

19, waterproofing effect of the basement inspection record

20, waterproofing requirements of the ground water storage test records

21, roof shower test records

22, pumping (air) duct inspection records

23, energy saving, thermal insulation test records

24, piping, equipment, strength and tightness test records

25, the system cleaning, flooding, water, ball testing records

26, lighting full load test records

27, large lamps and lanterns solidity test records

28, electrical equipment commissioning records

29, electrical engineering grounding, insulation resistance test records

30, refrigeration, air conditioning, piping, strength and tightness test records

31, refrigeration equipment commissioning record Commissioning records

32, ventilation, air conditioning system commissioning records

33, air volume, temperature test records

34, elevator equipment unpacking inspection records

35, elevator load test, safety device inspection records

36, elevator grounding, insulation resistance test records

37, elevator trial run Debugging records

38, intelligent building engineering system commissioning records

39, intelligent building engineering system function determination and equipment debugging records

40, unit (sub-unit) of the project safety and functional inspection of the necessary other measurements, testing, testing, inspection, testing, debugging, commissioning records

Part IV materials, products, Structural fittings and other certificate of conformity information

1, cement factory certificate of conformity (including 28-day reinforcement report)

2, brick, block factory certificate of conformity

3, reinforcing steel, prestressing, steel wire, strand, sleeve factory certificate of conformity

4, steel piles, precast concrete piles, pre-stressed piles factory certificate of conformity

5, structural steel works components and fittings, Material Factory Certificate of Conformity

6, Curtain Wall Project Fittings and Materials Factory Certificate of Conformity

7, Waterproof Material Factory Certificate of Conformity

8, Metal and Plastic Doors and Windows Factory Certificate of Conformity

9, Welding Rods and Flux Factory Certificate of Conformity

10, Prefabricated Components, Ready-Mixed Concrete Certificate of Conformity

11, Water Supply and Heating Engineering Materials Certificate of Conformity

12, construction electrical engineering materials, equipment factory certificate

13, ventilation and air-conditioning engineering materials, equipment factory certificate

14, elevator engineering equipment factory certificate

15, intelligent building materials, equipment factory certificate

16, construction of other certificates of conformity

The fifth part of the construction process information

1, design changes, negotiation records

2, engineering surveying, placement records

3, pre-inspection, self-inspection, mutual inspection, handover inspection records

4, building (structure) settlement observation and measurement records

5, new materials, new technologies, new technology construction records

6, concealed Engineering acceptance record

7, construction logbook

8, concrete opening report

9, concrete construction record

10, concrete ratio measurement sampling record

11, engineering quality accident report form

12, engineering quality accidents and the cause of the accident investigation, treatment records

13, engineering quality rectification notice

13, engineering quality rectification Notification letter

14, notification of partial suspension of construction work

15, report on the rectification of the quality of the project and application for resumption of work

16, notification of resumption of work

Part VI. Information to be supplemented, if necessary

1, qualification certificates of the surveyor, designing, supervising and constructing (including subcontracting) units

2, construction (b) Changes and replacements of the survey, design, supervision and construction (including subcontracting) units and the reasons therefor

3, Certificates of practising qualifications of the practitioners of the survey, design and supervision units

4, Certificates of induction of on-site management salespersons and skilled workers of each type of work of the construction (including subcontracting) units

5, Supervision planning or supervision implementation details agreed and approved by the construction unit (owner)

6, and the following information should be added Implementing rules

6, witness unit stationed at the construction site design representative power of attorney or authorization

7, design unit stationed at the construction site design representative power of attorney or authorization

8, other

Part VII of the completion of the data

1, construction unit project completion report

2, supervision unit quality assessment of the completion of the project report

2, the supervision unit project completion Existing problems rectification acceptance opinion letter

8, the completion of the project with the acceptance of the conditions of the notice and re-organization of the completion of the acceptance of the notice

9, unit (sub-unit) verification of quality control information (quality assurance information review records)

10, unit (sub-unit) verification of safety and functional inspection information and the main function of the main function of the verification of sampling records

11, unit (sub-unit) project perception quality inspection records (perception quality assessment form)

12, targeted sales of commercial housing or employee-funded housing user sign-off opinion form

13, engineering quality warranty contract (book)

14, construction project completion acceptance report (to be filled in by the construction unit)

15, as-built drawings (including) Intelligent Building Division)

Construction quality supervision archives

1, construction quality supervision registration

2, construction drawings review and approval and construction engineering construction plan review report

3, unit project quality supervision work program

4, construction quality supervision of the meeting notification and delivery of the key points

5, construction quality supervision of the meeting and delivery p>5, Construction Quality Supervision Record

6, Construction Quality Management System Registration Form

7, Construction Site Quality Management Inspection Record

8, Notification of Quality Supervision and Acceptance Inspection of Foundation and Foundation Pile Works

9, Record of Foundation Trench Inspection and Acceptance Report of Quality Acceptance of Foundation Pile Works

10, Record of Verification of Foundation and Foundation Pile Works Quality Verification record

11, foundation treatment measures and foundation treatment works quality acceptance report issued (or recognized) by the design unit

12, foundation and foundation division works quality supervision and acceptance inspection notice and acceptance report

13, foundation and foundation division works quality verification record

14, main structure division works quality supervision and acceptance inspection notice and acceptance report

14, main structure division works quality supervision and acceptance inspection notice and acceptance report

15, foundation and foundation division works quality supervision and acceptance report

16 Inspection Notice and Acceptance Report

15. Quality Verification Record of Main Structure Division Project

16. Quality Supervision and Acceptance Inspection Notice and Acceptance Report of Special Part of the Project

17. Quality Supervision and Acceptance Inspection Notice and Acceptance Report of Line Laying Project

18. Inspection Report on Mechanical and Bending Properties of Steel Materials and Inspection Report on Tensile and Bending Inspection Report of Welded Joints of Steel Structure

19. Tensile, bending inspection report

19, pre-stressing tendons, steel wires, strand mechanical properties of the field re-inspection report

20, cement physical properties inspection report

21, concrete specimen strength statistical table, evaluation table test report

22, assembled or prefabricated structural properties of the inspection certificate and construction joints, joints, concrete to withstand construction of full load, All full load specimen strength test report

23, waterproof concrete, spray concrete compression, seepage resistance test report and anchor resistance test report

24, foundation treatment works of various types of foundations and various types of composite foundations after the completion of construction of the foundation strength (bearing capacity) test results

25, piling works piling test report

26, mortar strength statistical tables and test reports on specimens

27, mortar strength test report

28, mortar strength test report

29, mortar strength test report

30, mortar strength test report

31 Statistical table and specimen test report

27, Strength test report of bricks, stones and blocks

28, Test report on hazardous substances of construction materials and indoor environment

29, Review report on waterproofing materials (including water-stopping strips and joint sealing materials), heat preservation, insulation and sealing materials

30, Review report on metal and plastic doors and windows (including material, wind pressure, wind resistance, and sealing materials) (including materials, wind pressure, air permeability, water permeability)

31, tensile strength test report of exterior wall finishing bricks

32, acceptance report on the installation of all types of elevators, escalators, moving walks installation works of the whole machine

33, all types of equipment installation works, hidden acceptance, system linkage, debugging and acceptance records of the installation of systems

34, concrete floor slab thickness drilling sampling records

35, engineering quality incident report form

36, engineering quality rectification notice and engineering partial suspension of construction notice

37, engineering quality re-opening opinion and engineering quality re-opening notice

38, unit (sub-unit) engineering quality control data verification records (quality assurance data) (Review record)

39, Verification of safety and functional inspection information of the unit (sub-unit) project and records of sampling of major functions

40, Record of inspection of the apparent quality of the unit (sub-unit) project (apparent quality assessment form)

41, Completion report of the construction unit project

42, Quality evaluation report of the completion of the supervisory unit project

43, Inspection report on survey documents and implementation by survey unit

44, Inspection report on design documents and implementation by design unit

45, Acceptance report on completion of construction project

46, Notification of supervision and inspection of completion of construction project

47, Record of verification of quality assurance information

48, Unit (sub-unit) Record of acceptance of completion of project quality (acceptance of completion of project quality)

49, re-organization of the completion of acceptance notice

50, re-inspection of completion of the project

51, completion of the acceptance of rectification of the problems and rectification of the problems acceptance of the notice

52, project quality warranty contract

53, unit (sub-unit) Unit (sub-unit) project quality supervision report

Note: The whole set of information of curtain wall, steel structure and net frame is stored in the quality supervision station

.