1, Notice of Award and Construction Permit
2, Construction Contract
3, Supervision Contract for Supervision Works
4, Approval of Construction Drawing Examination and Construction Drawing Examination Report
5, Quality Supervision Registration
6, Quality Supervision Submission and Quality Supervision Work Program
7, Geotechnical Investigation Report
8, Construction Drawing Review Record
9, Quality Supervision Work Program
9, Geotechnical Investigation Report by Supervisor Program
7, Geotechnical investigation report
8, Record of construction drawing review
9, Construction organization design or construction program approved by the supervisor (or the owner)
10, Construction commencement report
11, Registration form of quality management system
12, Record of quality management inspection at construction site
13 Technical delivery record
14. Measurement and positioning record
Part II Quality Acceptance Data
1. Foundation trench inspection record
2. Foundation piling quality acceptance report
3. Foundation treatment quality acceptance report
4. Foundation and foundation division quality acceptance report
5. Quality Acceptance Report of Structural Division Works
6. Quality Acceptance Report of Special Division Works
7. Acceptance Report of Laying Lines
8. Quality Acceptance Record of Foundation and Foundation Division and its Sub-divisions, Sub-items and Inspection Batches
9. Quality Acceptance Record of Main Structural Division and its Sub-divisions, Sub-items and Inspection Batches
10, Decoration division and its sub-divisions, sub-projects, inspection batch quality acceptance records
11, roofing division and its sub-divisions, sub-projects, inspection batch quality acceptance records
12, water supply, drainage and heating division and its sub-divisions, sub-projects, inspection batch quality acceptance records
13, electrical division and its sub-divisions, sub-projects, inspection batch quality acceptance records
14, Intelligent Division and its sub-divisions, sub-projects, inspection batch quality acceptance records
15, Ventilation and Air Conditioning Division and its sub-divisions, sub-projects, inspection batch quality acceptance records
16, Elevator Division and its sub-divisions, sub-projects, inspection batch quality acceptance records
17, Unit Works and its subunits, quality of completion of the project acceptance record Record
18, outdoor work of the division (sub-division), sub-item, test lot quality acceptance record
The third part of the test data
1, cement physical properties test report
2, sand, stone test report
3, each strength level of the concrete ratio test report
4, concrete test specimen strength statistics, evaluation table and test report
4, concrete test specimen strength statistics, assessment form And test report
5, the strength grade mortar proportion test report
6, mortar specimen strength statistical table and test report
7, brick, stone, block strength test report
8, steel mechanics, bending performance test report and welding joints of reinforcing bars tensile, bending test report or reinforcing bars mechanical connection joints test report
10, pile foundation engineering test report
11, steel structure engineering test report
12, curtain wall engineering test report
13, waterproof material test report
14, metal and plastic exterior doors, windows test report (including materials and three properties)
15, the pull-out strength test report of exterior wall tiles
16, building (structure) lightning protection device acceptance test report
17, special requirements or design requirements of the backfill compaction test report
18, quality acceptance specification of the other test reports
19, waterproofing effect of the basement inspection record
20, waterproofing requirements of the ground water storage test records
21, roof shower test records
22, pumping (air) duct inspection records
23, energy saving, thermal insulation test records
24, piping, equipment, strength and tightness test records
25, the system cleaning, flooding, water, ball testing records
26, lighting full load test records
27, large lamps and lanterns solidity test records
28, electrical equipment commissioning records
29, electrical engineering grounding, insulation resistance test records
30, refrigeration, air conditioning, piping, strength and tightness test records
31, refrigeration equipment commissioning record Commissioning records
32, ventilation, air conditioning system commissioning records
33, air volume, temperature test records
34, elevator equipment unpacking inspection records
35, elevator load test, safety device inspection records
36, elevator grounding, insulation resistance test records
37, elevator trial run Debugging records
38, intelligent building engineering system commissioning records
39, intelligent building engineering system function determination and equipment debugging records
40, unit (sub-unit) of the project safety and functional inspection of the necessary other measurements, testing, testing, inspection, testing, debugging, commissioning records
Part IV materials, products, Structural fittings and other certificate of conformity information
1, cement factory certificate of conformity (including 28-day reinforcement report)
2, brick, block factory certificate of conformity
3, reinforcing steel, prestressing, steel wire, strand, sleeve factory certificate of conformity
4, steel piles, precast concrete piles, pre-stressed piles factory certificate of conformity
5, structural steel works components and fittings, Material Factory Certificate of Conformity
6, Curtain Wall Project Fittings and Materials Factory Certificate of Conformity
7, Waterproof Material Factory Certificate of Conformity
8, Metal and Plastic Doors and Windows Factory Certificate of Conformity
9, Welding Rods and Flux Factory Certificate of Conformity
10, Prefabricated Components, Ready-Mixed Concrete Certificate of Conformity
11, Water Supply and Heating Engineering Materials Certificate of Conformity
12, construction electrical engineering materials, equipment factory certificate
13, ventilation and air-conditioning engineering materials, equipment factory certificate
14, elevator engineering equipment factory certificate
15, intelligent building materials, equipment factory certificate
16, construction of other certificates of conformity p>
The fifth part of the construction process information
1, design changes, negotiation records
2, engineering surveying, placement records
3, pre-inspection, self-inspection, mutual inspection, handover inspection records
4, building (structure) settlement observation and measurement records
5, new materials, new technologies, new technology construction records
6, concealed Engineering acceptance record
7, construction logbook
8, concrete opening report
9, concrete construction record
10, concrete ratio measurement sampling record
11, engineering quality accident report form
12, engineering quality accidents and the cause of the accident investigation, treatment records
13, engineering quality rectification notice
13, engineering quality rectification Notification letter
14, notification of partial suspension of construction work
15, report on the rectification of the quality of the project and application for resumption of work
16, notification of resumption of work
Part VI. Information to be supplemented, if necessary
1, qualification certificates of the surveyor, designing, supervising and constructing (including subcontracting) units
2, construction (b) Changes and replacements of the survey, design, supervision and construction (including subcontracting) units and the reasons therefor
3, Certificates of practising qualifications of the practitioners of the survey, design and supervision units
4, Certificates of induction of on-site management salespersons and skilled workers of each type of work of the construction (including subcontracting) units
5, Supervision planning or supervision implementation details agreed and approved by the construction unit (owner)
6, and the following information should be added Implementing rules
6, witness unit stationed at the construction site design representative power of attorney or authorization
7, design unit stationed at the construction site design representative power of attorney or authorization
8, other
Part VII of the completion of the data
1, construction unit project completion report
2, supervision unit quality assessment of the completion of the project report
2, the supervision unit project completion Existing problems rectification acceptance opinion letter
8, the completion of the project with the acceptance of the conditions of the notice and re-organization of the completion of the acceptance of the notice
9, unit (sub-unit) verification of quality control information (quality assurance information review records)
10, unit (sub-unit) verification of safety and functional inspection information and the main function of the main function of the verification of sampling records
11, unit (sub-unit) project perception quality inspection records (perception quality assessment form)
12, targeted sales of commercial housing or employee-funded housing user sign-off opinion form
13, engineering quality warranty contract (book)
14, construction project completion acceptance report (to be filled in by the construction unit)
15, as-built drawings (including) Intelligent Building Division)
Construction quality supervision archives
1, construction quality supervision registration
2, construction drawings review and approval and construction engineering construction plan review report
3, unit project quality supervision work program
4, construction quality supervision of the meeting notification and delivery of the key points
5, construction quality supervision of the meeting and delivery p>5, Construction Quality Supervision Record
6, Construction Quality Management System Registration Form
7, Construction Site Quality Management Inspection Record
8, Notification of Quality Supervision and Acceptance Inspection of Foundation and Foundation Pile Works
9, Record of Foundation Trench Inspection and Acceptance Report of Quality Acceptance of Foundation Pile Works
10, Record of Verification of Foundation and Foundation Pile Works Quality Verification record
11, foundation treatment measures and foundation treatment works quality acceptance report issued (or recognized) by the design unit
12, foundation and foundation division works quality supervision and acceptance inspection notice and acceptance report
13, foundation and foundation division works quality verification record
14, main structure division works quality supervision and acceptance inspection notice and acceptance report
14, main structure division works quality supervision and acceptance inspection notice and acceptance report
15, foundation and foundation division works quality supervision and acceptance report
16 Inspection Notice and Acceptance Report
15. Quality Verification Record of Main Structure Division Project
16. Quality Supervision and Acceptance Inspection Notice and Acceptance Report of Special Part of the Project
17. Quality Supervision and Acceptance Inspection Notice and Acceptance Report of Line Laying Project
18. Inspection Report on Mechanical and Bending Properties of Steel Materials and Inspection Report on Tensile and Bending Inspection Report of Welded Joints of Steel Structure
19. Tensile, bending inspection report
19, pre-stressing tendons, steel wires, strand mechanical properties of the field re-inspection report
20, cement physical properties inspection report
21, concrete specimen strength statistical table, evaluation table test report
22, assembled or prefabricated structural properties of the inspection certificate and construction joints, joints, concrete to withstand construction of full load, All full load specimen strength test report
23, waterproof concrete, spray concrete compression, seepage resistance test report and anchor resistance test report
24, foundation treatment works of various types of foundations and various types of composite foundations after the completion of construction of the foundation strength (bearing capacity) test results
25, piling works piling test report
26, mortar strength statistical tables and test reports on specimens
27, mortar strength test report
28, mortar strength test report
29, mortar strength test report
30, mortar strength test report
31 Statistical table and specimen test report
27, Strength test report of bricks, stones and blocks
28, Test report on hazardous substances of construction materials and indoor environment
29, Review report on waterproofing materials (including water-stopping strips and joint sealing materials), heat preservation, insulation and sealing materials
30, Review report on metal and plastic doors and windows (including material, wind pressure, wind resistance, and sealing materials) (including materials, wind pressure, air permeability, water permeability)
31, tensile strength test report of exterior wall finishing bricks
32, acceptance report on the installation of all types of elevators, escalators, moving walks installation works of the whole machine
33, all types of equipment installation works, hidden acceptance, system linkage, debugging and acceptance records of the installation of systems
34, concrete floor slab thickness drilling sampling records
35, engineering quality incident report form
36, engineering quality rectification notice and engineering partial suspension of construction notice
37, engineering quality re-opening opinion and engineering quality re-opening notice
38, unit (sub-unit) engineering quality control data verification records (quality assurance data) (Review record)
39, Verification of safety and functional inspection information of the unit (sub-unit) project and records of sampling of major functions
40, Record of inspection of the apparent quality of the unit (sub-unit) project (apparent quality assessment form)
41, Completion report of the construction unit project
42, Quality evaluation report of the completion of the supervisory unit project
43, Inspection report on survey documents and implementation by survey unit
44, Inspection report on design documents and implementation by design unit
45, Acceptance report on completion of construction project
46, Notification of supervision and inspection of completion of construction project
47, Record of verification of quality assurance information
48, Unit (sub-unit) Record of acceptance of completion of project quality (acceptance of completion of project quality)
49, re-organization of the completion of acceptance notice
50, re-inspection of completion of the project
51, completion of the acceptance of rectification of the problems and rectification of the problems acceptance of the notice
52, project quality warranty contract
53, unit (sub-unit) Unit (sub-unit) project quality supervision report
Note: The whole set of information of curtain wall, steel structure and net frame is stored in the quality supervision station
.