Which one knows 09 Huaneng Rizhao power plant interview and written test time

Huaneng Rizhao Power Plant 2009 Fresh Graduates Recruitment

Based on the needs of the work, Huaneng Rizhao Power Plant 2009 Fresh Graduates Recruitment Announcement is as follows:

One, the power plant Introduction

Huaneng Rizhao Power Plant is located in the southeast of Shandong Province Rizhao City, Rizhao, east of Rizhao Harbor, west of Yanzhou Railway, the south of the Yellow Sea, the geographic location of unique

Huaneng Rizhao Power Plant is a large coal-fired thermal power plant. Since its establishment, Rizhao Power Plant has always adhered to the work idea of grasping the team, grasping the management and grasping the development, the unit has been safe and stable for many years, the level of energy consumption has been reduced year by year, and all the main economic and technical indexes have maintained a better level among the same type of enterprises in China. While doing a good job in production and operation and promoting enterprise development, Rizhao Power Plant actively participates in he xie social construction, earnestly fulfills its social responsibility, and establishes a better social image. Due to its outstanding performance, Rizhao Power Plant has been awarded the honorary titles of National First-class Thermal Power Plant, National Excellent Unit of Equipment Management, National Advanced Unit of Measurement Management, Double Civilized Unit of Guodian Corporation, Civilized Unit of Shandong Province, Excellent Enterprise of Shandong Province for Environmental Protection, Advanced Unit of Shandong Province for Energy Conservation, Advanced Unit of Huaneng International Power Company Limited for Safe Production, etc., and one-time passed the "Three-Standard Integration" of Quality/Environmental/Occupational Safety and Hygiene of Modi, UK. The company has passed the quality/environmental/occupational safety and health "three standards in one" international standard certification audit of British Modi Company in one go. Source: High # School * People # Talent @ network

Faces of freshmen job search network

Rizhao power plant planning total installed capacity of: 2 × 350MW + 2 × 600MW + 2 × 600MW. as of December 31, 2007, Rizhao power plant installed capacity of 700MW, the first phase of the project is the first domestic limited recourse project financing project without a government guarantee, the shareholders and the shareholding ratio is: China Huaneng Group Corporation. The shareholders and equity are: China Huaneng Group Corporation 46%, Huaneng International Power Company Limited 34%, Shandong Province International Trust and Investment Company Limited 10%, Rizhao City Economic Development Corporation 10%. The 2×350MW units in the first phase of the project are imported units jointly designed by China and foreign countries, with boilers produced by Foster Wheeler of Spain and turbine-generator sets and control systems by Siemens of Germany. The main equipment selection is advanced, the arrangement is compact, the unit economy is high, the protection function is perfect, and it is a modernized thermal power plant with a high degree of automation in China. The construction of the first phase of the project started on March 18, 1997, and the units #1 and #2 were transferred to trial production on September 15, 1999 and January 13, 2000, respectively, and were put into commercial operation on April 11, 2000, and the second phase of the project was completed on January 13, 2000, and was completed on September 15, 1999 and January 13, 2000, respectively.

The second phase of the project is to expand two 680MW domestic supercritical coal-fired units along the first phase to the north. The plan reserves conditions for the expansion of two 600MW class units in the third phase of the project. The project was approved by the National Development and Reform Commission on April 13, 2007 with the document of Development and Reform Energy [2007] No.789. The project was formally started on May 16, 2007, and it is planned that the two units will all be put into operation by the end of 2008, and the boiler, steam turbine, generator and other parts of the power plant will be put into operation. The boiler, turbine and generator are produced and supplied by Shanghai Electric Group Co. Source: high @ school * people & talent @ network

Second, the recruitment of professional and application conditions

(a) Recruitment of professional

Thermal power engineering, relay protection, thermal detection and control technology, electrical systems and their automation, centralized control operation, power plant chemistry and other power plant-related specialties.

(2) Conditions of application

1, basic conditions:

Adherence to the four basic principles, adherence to reform and opening up, love for the motherland, support the Party's line, guidelines, policies, abide by national laws and regulations, social morality and professional ethics, honesty and trustworthiness, decent style, sense of responsibility, strong sense of responsibility, hard-working, and is willing to contribute to the cause of Huaneng Electric Power.

2. Requirements:

(1) 2009 graduates of undergraduate degree or above;

(2) excellent character and good ideological and political qualities;

(3) professional counterparts, good academic performance, with the corresponding post of the professional theoretical knowledge and business capacity;

(4) pass the national English four-level examination;

(5) Physical health.

Three, the scope of recruitment

Undergraduate colleges and universities.

Four, the recruitment process

(a) Registration

1, download and fill out the "Registration Form for College Students", see attached.

2, mail personal information. Including the "registration form", my resume, a copy of the ID card, a copy of the English certificate level certificate, the school appraisal opinion, all the academic performance during the school period, and so on. In the application deadline (postmarked by the post office) before the use of postal express mail to Huaneng Rizhao Power Plant Human Resources Department, the information will not be returned. Source: High&school#People%Capacity*Net

(2) Qualification examination: according to the conditions of employment to determine the candidates to participate in the employment examination.

(C) examination and assessment: the examination is divided into written tests and interviews. The candidates' professional and technical qualities and comprehensive ability to conduct a comprehensive assessment to determine the candidates to be employed.

(4) to the proposed candidates for employment in the school background investigation, through interviews and access to files, to understand their family background and performance in school, to investigate whether there are adverse records.

(v) Physical examination of the proposed candidates.

(F) Signing of employment agreement and signing of labor contract after hiring.

V. Schedule

The deadline for application is January 1, 2009, and the examination and physical examination will be announced.

Sixth, the corresponding treatment

According to the work position, enjoy the corresponding treatment, and in accordance with the relevant provisions of the State to enjoy the pension, medical and housing fund and other social insurance.

Seven, apply for contact information

Contact: Mr. Liu

Apply for consulting telephone: 0633-3362400

Email: 660mw@163.com

Apply for extra points ah !!!!