1, heating installation: through the central heating or floor heating mode of installation, according to the indoor temperature, air circulation conditions and the size of the household factors, choose the appropriate heating equipment and its placement.
2, oxygen setup: set up oxygen bar or oxygen tanks and suction machine and other equipment connected to facilitate the supply of oxygen, oxygen bar is often a closed room, the internal air needs to be circulated ventilation, oxygen bar equipment needs to be considered for the installation of oxygen.
3, drinking water setup: the installation of parcel water mining, storage and delivery of three rings, in the collection of water, need to consider the stability and safety of the water source, in the inventory, the application of the use of dry and clean without stains of the container tanks, and regularly cleaned and disinfected.
4, medical equipment and equipment: the installation of medical equipment and equipment needs to be placed in the location of the equipment, use and safety.
5, explosion-proof equipment: explosion-proof equipment needs to be installed to comply with the relevant standards and norms of production safety, the purpose of which is to protect the lives of workers, so the installation method should be strictly in accordance with the relevant safety procedures.
6, communication equipment: communication equipment packages include communication base stations, wireless base stations, according to the information shell coverage and terrain and weather conditions, select the appropriate equipment type and installation location.