Compensation for losses caused by construction

First, how to compensate for the losses caused by the construction?

1. According to different situations, the compensation for losses caused by construction is as follows:

(1) If losses are caused by obstructing the construction unit, compensation shall be made by obstructing the construction unit, generally according to actual losses, such as losses caused by shutdown, slowdown, bad luck, relocation of machinery and equipment, and overstock of materials and components;

(2) The constructor shall bear corresponding civil liability for damages caused by the construction, such as receipts and vouchers for medical expenses and hospitalization expenses issued by medical institutions, and reasonable expenses for compensating the victims for damages.

2. Legal basis: Article 179th of the Civil Code of People's Republic of China (PRC).

Anyone who infringes on others and causes personal injury shall pay compensation for medical expenses, nursing expenses, transportation expenses, nutrition expenses, hospital food subsidies and other reasonable expenses for treatment and rehabilitation, as well as the income reduced due to missed work. If it causes disability, it shall also compensate for the cost of assistive devices and disability compensation; If death is caused, funeral expenses and death compensation shall also be paid.

Second, what links does the project construction claim include?

Engineering construction claims include:

1. Letter of intent to file a claim;

2. Make records of the same period. After submitting the letter of intent for claim, the records of the same period from the start date of the claim event to the end date of the claim event shall be carefully made;

3, in the process of the claim, the contractor shall submit to the supervision engineer a detailed report of each stage of the claim, indicating the influence of the claim on the current loss amount and the basis of the claim;

4. Submit the final claim report. When the impact of the claim event is over, the contractor shall submit the final claim detailed report to the supervision engineer within the time stipulated in the contract, and send a copy to the relevant units.