Integrated pumping station construction program

Integrated prefabricated pumping station in the installation, need to prepare the pit excavation construction and support programs, geological conditions need to meet the installation requirements of integrated prefabricated pumping station.

Integrated precast pumping station pumping pit excavation program: according to the design requirements of the excavation, excavation must pay close attention to the pit safety, the bottom of the pit must be free of stagnant water, if there is water need to carry out drainage measures, to take appropriate pit maintenance program to prevent collapse. The bottom of the pit should be dug flat and compacted.

Integrated prefabricated pumping station maintenance

1, annual pumps, grills, valves, control cabinets and other major equipment and pumping station overall appearance check.

2, pumping station, such as supporting basket grille, according to the actual situation of the incoming water quality, regular lifting and cleaning

3, in accordance with the requirements of the equipment manufacturer to regularly replace the lubricating oil and replacement of wear and tear crushed grille blades.

4, in accordance with the requirements of the equipment manufacturer to regularly check the balance of phase resistance, insulation resistance value.

5, according to the equipment manufacturer's requirements for regular replacement of spare parts.

6, every 5 years or special requirements, stop the pumping station for overhaul.

Integrated prefabricated pumping station recommended Lianyu, Lianyu is an integrated prefabricated pumping station source manufacturers, there is no middleman to earn the difference in price, so cost-effective. Lianyu prefabricated pumping station for the complete set of supply, in the factory to complete the assembly and testing of the system, the goods to the site after the required installation and commissioning time is greatly reduced. Another civil workload is only 1/10 of the traditional pumping station, greatly reducing the duration of the project. High efficiency, environmental protection, cost savings.