Power plant equipment management summary

Power plant equipment management summary a

First, the production of preparatory work

1, power generation operation direction of this week's work summary:

(a), the students training:

(1) the main control professional: to complete the electrical professional security power supply, DC system, UPS system training courseware independent lectures, the site of the lectures on the effects of counseling, assessment, the students on the study of difficult points to answer.

These are the main points of the training program for the electrical profession.

(2) auxiliary control professional: complete the ash desulfurization professional flue gas / absorption tower system operation adjustment, simple accident judgment and treatment, gypsum dehydration system operation adjustment, simple accident judgment and treatment, wastewater treatment system operation adjustment, simple accident judgment and treatment, limestone slurry system operation adjustment, simple accident judgment and treatment, utility system operation adjustment, simple accident judgment and treatment of courseware production. The courseware is produced.

(2) Regular administrative work

(1) Completion of this week's main control, auxiliary control of the content of the courseware taught by the students for on-site evaluation.

(2) Organize the operation of the direction of the company's relevant management system to learn.

(C), the company leadership arrangements

(1) complete the trainees out of the practical training service agreement submitted for approval.

(2) to complete the preparation of the report on the finalization of the program design of the Changji 2?350MW cogeneration heat network project and submit the report.

(3) Completion of indoor and outdoor sanitation and road cleaning for the site construction of Changji 2?350MW site.

(4) Safety work

No unsafe incident occurred this week.

Second, the equipment management direction work summary

(a) training:

(1) continued to carry out the equipment management direction to participate in the Huadian Changji Power Plant and Huadian Kashgar Power Plant minor maintenance of the internship, the training work can be carried out according to the plan as scheduled.

(2) to carry out boiler professional field air preheater overhaul, valve disassembly overhaul and soot blower overhaul work; steam engine professional to carry out feed pump disassembly overhaul, valve disassembly overhaul, oil gear disassembly, speed control system and the body system overhaul work; thermal control professional to carry out on-site temperature, pressure, flow rate, rotational speed, such as equipment disassembly and verification work; ash desulphurization professional to carry out slurry circulating pump overhaul, the absorption tower overhaul, electric precipitator overhaul and other professional knowledge. The company also provides training on professional knowledge of electric dust removal and overhaul; the electrical profession carries out the overhaul of the generator body system, excitation system and various protection systems.

(3) the direction of the organization's equipment management personnel to study the twenty-five countermeasures, power plant safety accident case knowledge training.

(4) Organize all personnel to study the Tianchi Energy Company, the power plant project related systems.

(5) In accordance with the requirements of the training content, every morning and evening to convene a meeting to summarize the technical and safety aspects of the new staff to ensure the effectiveness of personnel training.

(6) docking contact August 1, equipment management direction to participate in the Huadian Urumqi Thermal Power Plant training.

(2) daily work:

(1) to carry out the department specializing in supervisors, new employees comprehensive performance appraisal work, has been signed version of the final appraisal results reported to the Ministry of Human Resources.

(2) to complete the final signing of all departmental attendance reported to the work.

(3) In accordance with the progress of the project nodes, cooperate with the work during the construction period.

(4) continue to sort out the direction of equipment management management standards, technical standards, all kinds of maintenance data template establishment, according to the node of the project to do a good job of the preparation of various equipment maintenance data and other aspects of the work.

(6) In accordance with the equipment management direction internship node, continue to do a good job of personnel out of the safety, technology and other aspects of management.

(7) continue to do a good job with the Quality and Technical Supervision Bureau of Metrology Institute of docking matters, to ensure that the rapid progress of cooperation.

(8) Arrange professional specialists and supervisors to carry out the implementation of training content before going out for internship, leading internship personnel and various internship docking work.

(9) In accordance with the development of the progress of the network node, in advance to do a good job in the preparation of the equipment to carry out various preparatory work.

(3), the safety of the trainees: this week, the equipment management direction of the personnel in the business district during the training, there was no unsafe events, the overall training safety situation is better.

Power Plant Equipment Management Summary II

20XX equipment section of the work is nearing the end of the review of the upcoming past year, the equipment section of the comprehensive implementation of the company xxxx year ? Efforts to build ?opt? brand, improve management, improve knowledge, improve professional competence? The guideline of the manufacturing department is to improve productivity, reduce defective rate and improve professional ability. Improve productivity, reduce defective rate, reduce cost? The annual goal of the Manufacturing Department is the guide, and we will earnestly implement the work of equipment management proposed in the work deployment, and strive to realize the goals of "maximizing the production needs, cultivating the best quality". Maximize production needs and develop an efficient team.

Throughout the equipment section of the work of the year 20XX, in the leadership at all levels of support and collaboration with other departments is better to complete the task given by the company. This year, the increase of new equipment, departmental work reallocation, xxxx special projects and a number of involved in the face of the larger, the actual work encountered many difficulties, there are some problems, but the network - equipment management department of the staff through a serious summary, careful analysis, from the problems that have arisen from the lessons learned in the exercise of the ability to work in the difficulties, in the reflection of self-improvement, the big thing to speak of principles, small things to speak of style, and finally successfully completed the annual work. Speaking of style, and finally successfully completed the work of the year. 20XX equipment section of the mold cleaning and installation of the efficiency increased by 36.6, equipment operation rate increased by 44.4, reduce costs total 600150.8xxxx.

The details are as follows:

a. Reduce the cost of:

1, has been damaged by the breakdown of the repair of expensive parts, so that the repair work is detailed to the components, reduce the cost of the repair work, and reduce the cost of the repair work, and reduce the cost of the repair work. Repair work in detail to components, narrow the scope of failure, contact the external use of the lowest maintenance costs to repair equipment, to avoid direct replacement of new parts, *** cost savings of 1580xxx.

Second, reduce the defective rate:

1, high quality of the mold cleaning and installation, reduce the number of molds back to the source:*** wash back to the number of installations, so that the molds back to the number of return to the installation of the wash back to the number of the first half of a block / month down to the second half of the year, the number of the second half of the year, the number of the second half of the year. Block / month down to the second half of the 0 block / month.

2, maintenance monitoring, organization of high-fault equipment overhaul, to reduce equipment failure downtime caused by poor production.

Third, improve productivity:

1, designated equipment maintenance plan, and arrange for the implementation of equipment maintenance work, through changes in the frequency of maintenance to ensure that the use of equipment performance, so that the equipment downtime downtime from 584.06h in May to 324.54h in November, a decline of 44.4.

Fourth, the staff turnover rate:

This year, the equipment section xxxx (electrician) due to five, rationalization proposals:

1, the rational use of summer time-sharing tariff differentials, by changing the operating hours of production, reducing the mold insulation time, the rational use of electricity, summer (July ~ October) to save electricity 488350.

2, mold ledger electronic management, greatly reducing the mold cleaning and installation of the time of searching The original need for mold cleaner and mechanic two people to complete the work now only need to mold cleaning employees alone to complete, greatly improving work efficiency.

Six, team building

We encountered through the work of the actual situation, and constantly educate the staff, and develop a corresponding countermeasures and methods of treatment, the new staff for the systematic training, special lectures, while to the workplace for the actual operation of the exercise, so that each employee recognizes the importance of improving the quality of technology. At the same time to strengthen the staff's collective sense of honor to cultivate, improve the ability to collaborate with each other, so that the organization is more united, more combat.

1, this year for the mold class cleaning mold time is concentrated, forklift use of the actual situation of the conflict of a comprehensive restructuring, the abolition of the staff fixed-positioning work system, the implementation of real-time distribution, mold stereotypes timed assessment system, mold cleaning according to the urgent shipment, has been discontinued and the general three levels of classifications in order to clean, and to arrange for specialists to carry out the installation of molds and molds to place the frame of the 5s finishing work, to take full advantage of its time schedule flexibility, mobility and organization. Make full use of its schedule flexibility, high mobility characteristics, to ensure that there is no idler in the class, everyone has a job to do, complement each other to complete the existing increase in the workload of the mold installation.

2, repair production class daily responsible for general equipment (air compressor, water pump room) maintenance, fixed people regularly on the use of equipment to confirm the status, to ensure that other equipment for daily production needs of water and gas; and responsible for special products (187-144) processing and size of the confirmation.

VII, engineering projects

1, three sections of the machine re-movement, positioning;

2, the addition of new equipment;

3, the company's electrical troubleshooting, line specification and rectification;

4, the clean room equipment additions to move.

VIII, work deficiencies

1, in dealing with the work is not in charge of my performance is not proactive enough, the reason for this is that there is a fear of overstepping the authority of the mind, offside thinking, sometimes show no initiative to put forward their own ideas, resulting in a slow pace of work.

2, not enough to learn new things, the work is often based on experience, based on the previous set of work to deal with the problem, the performance of the work of the bold innovation is not enough.

3, the management of the team is not detailed enough, the staff's safety and quality awareness is still not strong enough, resulting in this year's xxxx major safety accidents. Although the parties involved in the aftermath of the education and treatment, targeted to make the corresponding countermeasures. But should still be prevention-oriented, increase the usual educational efforts to improve the staff's safety and quality awareness, to fundamentally reduce the occurrence of safety accidents.

4, the equipment commonly used parts of the spare parts inventory and in the warehouse to confirm the amount is not enough, should strengthen their own Japanese language learning more communication with the Japanese management, to ensure that the equipment maintenance has spare parts to replace, to reduce the time of production delays.

The above shortcomings I will continue to learn, and strive to improve their ability to work, work on the basis of the level to overcome the shortcomings of self-improvement, with full enthusiasm and full of energy for the development of the company's cause to add bricks and mortar, for the company's fixed assets, equipment management to do their best. Looking forward to 20XX, the focus of the work is mainly to ensure that the normal operation of the equipment in 2009 the momentum of the good at the same time, to strengthen the management and construction of the section, so that the management of the equipment section of the stage, the work of the first class.

I carefully recommended