Engineering work plan 1
First, the work of the overall idea
Engineering comprehensive project progress scenarios, in the progress of the existing project to complete the end of the work at the same time, and gradually plan out the next year's specific work ideas, as follows:
? Two construction Refers to the Ministry of Engineering team, fighting force and cohesion of the construction; engineering management system and the construction of engineering management system. Engineering construction ? Three goals ? refers to the project progress goals, quality goals, cost goals should be reasonably balanced and harmonized, so as to promote the completion of the project's comprehensive objectives.
Second, the project management indicators
A, the completion of the Lebin Department Store internal lighting renovation project
B, the completion of the New World Plaza eave floodlighting project
C, the project qualification rate of 100 percent
D, the site of the zero occurrence of major safety accidents
Third, the work plan
(a) the beginning of the construction and scale
20XX Engineering Department in the company and the support of the relevant departments, the Leben Department Store internal lighting renovation, the New World Plaza eave floodlighting project, in accordance with the company's scheduled start date to start construction.
(B) quality control objectives
The projects are good to 80%, qualified to 100%. The main control project all qualified, general project acceptance through.
(C) progress management objectives
Completion of the company's annual plan targets, to achieve progress management contract objectives.
(D) cost control objectives
Completion of various cost control objectives issued by the company, the completion of cost control contract objectives, progress control objectives. (E) safety and courtesy measures
Safety and courtesy measures are mainly from the following two aspects to grasp;
1) qualification document management
A, business cooperation unit safety production qualification review and filing management
B, construction machinery equipment testing for the record
C, the special operators on board license review and filing
D, professional and technical, professional management safety personnel qualification review and filing
D, professional and technical, professional management safety personnel qualification review and filing. Technical, professional management safety personnel qualification review for the record
2) major construction programs, system management
A, construction site layout plan review
B, courtesy of the implementation of construction management
C, warehouse management programs, scaffolding programs, construction of temporary power programs, construction machinery erection programs, work-at-height control programs, construction of Measurement control program.
D, workers living environment management system
E, on-site construction environment management system
F, safe and courteous construction inspection and evaluation, and rewards and penalties system
(F) Department of internal construction
1, team building:
Around the next year's work objectives, the engineering department personnel in the department of the team building is particularly important. Especially important. Engineering to improve the department ? Team cohesion ? and ? Team fighting force As a fundamental, to stimulate the department staff to participate in the activities organized by the company, and to participate in the company's corporate culture, and strive to promote the staff and the company's team building coordination; comprehensively stimulate the staff's enthusiasm for work, and enhance the overall combat effectiveness of the staff.
2, the system system construction of the Ministry of Engineering system is mainly to reflect the following aspects;
A, improve the Ministry of Engineering internal rules and regulations guidelines;
B, a clear division of responsibilities for the work within the Ministry of Engineering;
C, the composition of the internal work of the business process interface with other departments;
D, with the engineering business
Fourth, focus on issues
(a) clear construction model
In the company's construction model gradually clear at the same time, the Ministry of Engineering will be in accordance with the company's construction model to quickly clear thinking, the first time with the company model to complete the docking.
(2) Reasonable planning contract and contracting mode
According to the characteristics of the project, planning and determine the contract and contracting mode that fits the characteristics of the project of the company, after reasonable planning and determination of the mode, so as to maximize the profit of the project.
(C) to build and improve the project management model suitable for our company
According to the company's project management model, the Ministry of Engineering will be based on this model to improve the rules and regulations, constituting a set of complete and feasible management program.
V. Expected support and help
In terms of human resources and team building, we expect to receive strong support from the company. In addition, the project construction mode will be determined as soon as possible.
Engineering Department Work Plan 2
I. 20XX engineering department's work objectives
1, in the continuous inspection and maintenance to ensure the normal operation of the equipment.
2, follow up on the engineering problems left over in 20XX, put forward effective measures to rectify.
3 、Intervene in the first phase of high-rise and the second phase of the villa project, especially to strengthen the first phase of the high-rise hidden works of investigation and preliminary inspection.
4 、Do a good job of high-level acceptance, to ensure that each employee can independently acceptance, individually with the owners of the home inspection, and detailed information on the structure of the house and hidden plumbing and circuitry direction.
5 、Strictly in accordance with the annual training program for training, especially the new staff induction training.
6 、 July 31, 20XX to complete the first phase of high-rise engineering acceptance, key information to receive the work.
7, to complete the first phase of high-level equipment to undertake and ensure the normal use of daily and maintenance.
8, the establishment of facilities and equipment maintenance program, in strict accordance with the plan.
9, do a good job in the second renovation of the data review and inspection work to ensure that the renovation of safe construction.
10, do a good job of outsourcing facilities and equipment maintenance unit selected and signed a contract.
11, all the housing information organization and file establishment.
12, with the marketing and the completion of the work of various departments.
13, follow up a villa green last year omission of construction.
15, follow up a high-level perimeter fence and monitoring system installation.
16, inspection and follow up a high-rise underground parking lot division and the installation of guide signs.
16, follow up on the first phase of high-rise and a villa there are engineering defects in the rectification work.
17, do a good job of the tenants engineering maintenance of paid and non-permanent services, to ensure that the rate of engineering repair shall not be higher than 2%. 18, follow up a villa and a high-rise, underground parking plant fee gate system installation and use.
19, the establishment of equipment files and do a good job of archiving equipment information.
Second, the Ministry of Engineering difficulties and solutions
1, after a visit to various projects in nearby neighborhoods, found that the Ministry of Engineering employees of my company's wages are low, and expect to be able to get the support of the senior leadership, so as to improve the quality of life of the employees of my engineering department.
2, in 20XX the legacy of the first phase of the villa related information and keys are expected to be handed over as soon as possible to my property company, in order to facilitate our work can be better carried out.
3, part of the underground garage in the first phase of the villa is not threaded, can not be energized, seriously affecting the use of the garage, please group coordination of the relevant departments to solve.
4, in the inspection found that the clubhouse and practice field did not reserve access to the mouth, part of the maintenance of my department can not be carried out, please the relevant construction unit to solve.
5, in order to reduce the first phase of the villa's security risks, expect the leaders of the group consultation, can be installed as soon as possible monitoring system.
6, at present a villa perimeter fence is used in color steel plate and iron, color steel plate is easy to deformation affect the image of the company's projects.
7, the current phase of the villa C2 garage is hairy, in order to improve the quality of the project, our company proposes to use floor paint pavement.
8, a villa gutter ( eaves trough ), many times to repair any serious leakage scenarios, expect to get the support of the group leadership, can be completely resolved, so as to avoid damage to the wall due to its leakage.
9, a villa C2 garage without the installation of intelligent card system, resulting in our company on the vehicle management difficulties, expect to wait for the support of the group leadership.
10, a villa sub-family installation of the window is too large, seriously affecting the use of tenants, looking for group leaders to deal with consultations.
11, a villa courtyard door, push and pull difficult, easy to dismantle the serious impact on the use of tenants and the quality of the project, looking forward to the group leaders to deal with consultation.
12 、The septic tank of the villa of the first phase adopts rain and sewage combined flow, and the main pipe is not connected with the municipal pipe network, which leads to the speed of septic tank filling up, and it is expected to be dealt with by the leaders of the group in consultation.
13, a villa sub-unit so far, no installation of access control intercom system, seriously affecting the use of tenants.
15, a villa so there are facilities and equipment, so far the developer did not require my property company to participate in the acceptance, so that it directly take over the management.
Engineering Department Work Plan 3
Problems:
1, the implementation of the departmental system needs to be strengthened, the development of a series of measures are often not well implemented, the assessment has not increased, the assessment is not reflected.
2 , due to departmental communication work is not enough, so the cohesion work is not done well.
3, departmental and departmental communication needs to be strengthened, the need to further strengthen the departmental work together.
4. did not strengthen the production process improvement, increase production efficiency and quality
xxx work plan
1, increase the construction of the system, resolutely implement the target responsibility system, refine job responsibilities. Management must be institutionalized, standardized, procedural, any violation of discipline and rules, should be dealt with seriously in accordance with the system, to make each employee has a sense of responsibility.
2, strengthen up and down communication, collect problems, find problems, solve problems. Make the company united. Work together to do a good job in all aspects of work
3. Accelerate the optimization of the production process improvement, process improvement of 13 items per month to increase production efficiency and improve quality.
4. Strengthen the company's all products, to reduce production production costs in the direction of the target amount of 500,000 yuan.
5. The accuracy rate of the main materials in the parts list of the factory's order reaches 100%. Other list of materials 98.5% (does not affect the production)
6. Strengthen the sample staff skills training, enhance the qualification rate of customer samples, the target is 98% satisfaction is 99%
2xxx year is the year of challenges and opportunities for the Southeast Company, as long as we are united and set up a high degree of urgency and sense of responsibility. In accordance with the work plan to carry out solid work, in the company's strong support and guidance, I believe that next year we must overcome the difficulties, steady progress, reversing the current unfavorable situation, and ultimately realize the Southeast Company profit and the road to benign development.
Engineering Department work plan 4
First, safety management
1, equipment and facilities safety management must adhere to ? Safety first, prevention first. The policy; must adhere to the equipment repair and maintenance process of the system management approach; must adhere to the continuous updating and renovation; to improve the level of new safety technology, can timely and effectively eliminate unsafe factors in the process of equipment operation, to ensure that no major accidents occur. 2, clear safety operation responsibilities, constitute a perfect safety maintenance management system. 3, the strict implementation of operating safety regulations, to achieve the standardization of safety management, institutionalization. 4, strengthen the safety supervision of foreign decorative companies, strict decorative unit safety access conditions.
Second, the work plan
1, strengthen the service consciousness of the maintenance department. Currently in the service, the Ministry of Engineering needs to further improve the level of service, exceptionally in the way and quality, more need to be further improved. The department will regularly carry out the service object, polite and courteous, multi-capable technology training, improve the service quality and service efficiency of the department personnel.
2, improve the system, clear responsibilities, to ensure the healthy operation of the department. In order to play the role of the Ministry of Engineering as a property and the development of good communication between owners care about the role of the link, for the shape of the service, improve and improve the work system, which is more suitable for the current work; from the equipment management and staffing system, to truly realize the work of the rules and regulations, the system standardizes the work. After the implementation of the system, clear responsibilities, to ensure that the work of the department to carry out benign.
3, strengthen the supervision of equipment, strengthen the cost consciousness. Engineering Department is responsible for the maintenance and management of all residential facilities and equipment, directly related to the control of property costs. Familiar with the operation of equipment, performance, to ensure the normal operation of equipment, in accordance with the norms of real-time supervision of the gravity zone, the Ministry of Engineering will be implemented in accordance with the needs of the relevant work, so that there is equipment, maintenance, results; and facilities and equipment maintenance focus on the planning of specific individuals.
4, carry out training, strengthen learning, improve skills. On the current scope of services of the Ministry of Engineering, is still relatively limited, exceptionally limited to their own knowledge of the structure, in order to further improve the work skills, appropriate theoretical learning, complementary to improve the overall team's level of service.
5, for the maintenance of facilities and equipment maintenance characteristics, the development of the corresponding maintenance plan, the workflow sub-detailed.
Third, do a good job of energy control
Management of energy costs usually account for a large proportion of the daily costs of the property company, energy saving is an effective means of improving the company's efficiency. The key to energy management is:
1, improve the energy conservation awareness of all employees
2, the development of the necessary rules and regulations
3, to take the necessary technical measures, such as office power and gate post power separation in addition to the original street lamps and elevator power ( they are not the same charges ), underground parking lot lighting facilities and equipment renovation, the parking lot energy consumption to a minimum; the building lights transformation Minimum; will be transformed into energy-saving lamps and lanterns in the building; the lighting control switch in the building is transformed into a touch time-delay switch.
4, in the equipment operation and maintenance costs for internal assessment and control, to avoid and reduce unnecessary waste.
5, directly looking for manufacturers into the purchase of equipment accessories, unified purchase of spare parts, according to the equipment maintenance cycle for maintenance. In order to replace in a timely manner, to ensure that the equipment to play the best energy-saving role in reducing maintenance costs.
Fourth, preventive maintenance
1, preventive maintenance: all facilities and equipment are developed maintenance and overhaul plan, according to the equipment maintenance cycle of the established time, projects and processes to implement preventive maintenance.
2, daily repair processing: facilities, equipment, the daily use of faults found in the form of repair orders to take maintenance measures. ( Party building work plan )
3, daily inspection: the Ministry of Engineering duty personnel on duty to the scope of responsibility of the equipment, facilities for one to two inspections, found faults and abnormalities in a timely manner.
Fifth, sound equipment, facilities files, maintenance work inspection records.
In order to ensure that the equipment, implementation of the integrity and continuity of the original information, on the existing basis to further improve the management of departmental files, the establishment of equipment ledgers. For the new takeover of the Venice neighborhood, due to the real estate company supporting facilities installation lag, do a good job in the collection of facilities and equipment information to follow up.
Six, facilities and equipment maintenance work:
1, the strict implementation of the regular inspection system, found that the problem is dealt with in a timely manner, no less than one daily inspection.
2, according to the season is not the same as the arrangement of regular inspections, exceptionally flood season, to strengthen inspection efforts to ensure safety.
3, according to the actual needs of the neighborhood iron fence, iron gates and street lamp poles rust and paint.
4, according to the actual needs of the neighborhood roads, flower beds, wall renovation. Our engineering department will carry out the above work, show our company's service image, to provide owners with more quality and attentive service, to create better conditions for the future development of our property company.
Engineering Department Work Plan 5
First, the overall work of the Engineering Department this year
The Engineering Department to ensure that the hotel power to run normally, to further strengthen the maintenance of equipment and operation management, to strengthen the plan maintenance, equipment inspection, to ensure that the heat pumps, elevators, power distribution, central air-conditioning, water supply systems, kitchen facilities, such as the normal operation of the exception to improve the guest rooms, restaurants, entertainment department facilities and the integrity of the rate of the restaurant, and to improve the quality of service. Improve the integrity rate and comfort level of guest rooms, restaurants and entertainment facilities. Further increase the energy management efforts, strengthen the cost consciousness, improve the management of consumable materials, facilities and spare parts set management, and vigorously grasp the potential and repair old and waste work.
Strengthen personnel training, service awareness training, service skills training, and strive for multi-skilled personnel, make full use of human resources, control the total number of personnel, the implementation of the last elimination, improve service, improve the image of the back office, and promote the quality of work to a higher level.
Second, the Ministry of Engineering focuses on the following work
1, pay close attention to the Ministry of Engineering staff training and assessment work, from courtesy and manners, grooming, service awareness, service procedures, service quality, etc., to improve work skills, improve efficiency, improve the image of the work to achieve multi-talented, training and recruitment of integrated technicians, such as electricians must be from the strong power maintenance to distribution, elevators and other aspects of technology integration. Elevator and other aspects of technical integration. Mechanics of the Ministry of Engineering to implement the survival of the fittest, skills competition assessment. Retain excellent backbone staff, for some of the old staff fatigue, injecting new vitality, appointment of personnel do not engage in a pool of stagnant water, the introduction of competition and elimination mechanism, as the saying goes: a rusty door, flowing water does not rot. Only in the employment of personnel to take the ability to work hard to retain, inert, mediocre out of the way, in order to make the whole group at any time to have competition, there is vitality. Expect after training, assessment, so that the Ministry of Engineering logistics staff are full of enthusiasm, to create a comfortable hardware environment, to provide guests with comfortable service products, to completely change the guerrilla, firefighting team, the image of oil soldiers, so that the backstage service is also full of rich hotel atmosphere.
2, improve the work of the service program, strengthen the initiative, coordination, coordination with the departments between the abnormal front and backstage departments, between groups, up and down the work between the timeliness, effectiveness, do not shirk, do more. Each team to strengthen the facilities of the daily inspection, according to the standard route inspection, duty zoning, duty to the person. And by the maintenance team on a regular basis to the front-line users about the use of maintenance knowledge, to put an end to barbaric operation.
Engineering Department work plan 6
First, the plan of this year's investment objectives initially to:
1, to enhance the overall level of business
2, more learning, communication, and discussion of relevant investment knowledge and departmental work.
3, and more exchanges with people in the same industry, to explore and explore, innovative investment knowledge.
4, to understand the relevant information in a timely manner with the leadership and other departments to communicate, so that we can explore together, so as to combine the actual work of the department to further improve.
5, Jining City to centralized commercial purposeful market research
6, the development of rental strategy
7, late February and Dexter Jining person in charge of the docking project, early March reception KFC, Dixon, e family halo noodle person in charge of the project to visit
8, the development of a new form of investment manual
9, to enhance Merchants Commissioner's business training
10, with the Ministry of Engineering docking property conditions of the accurate data
11, with the Sales Department of the store's marketing work
12, continue to tap the potential or intended customers
Second, as much as possible to increase the number of preparatory customer resources
1, sincere and courteous reception of door-to-door intended customers.
2, to other and neighboring cities rival malls to collect customer resources.
3, through regular contact with customers interaction, timely understanding of the industry's relevant developments.
Third, the preparation of the relevant investment information
1, investment manual and investment manual
2, commissioned by the contract (management), power of attorney
3, investment commission
4, investment process table
5, investment copy
Fourth, the investment method
1, the project Investment conference
2, the project promotion meeting
3, door-to-door visits (target self-referral)
4, the network investment
5, telephone contact
6, should be the opposite of the communication
7, industry associations, government agencies
8, the media investment
V. Enhancement of shopping malls occupancy rate, stable Existing good brands in the mall while introducing other brands on the grade
1, combined with the industry's actual scenario, more understanding and introduction of home furnishing market on the grade of the mainstream brands, as far as possible, to stabilize the mall's existing good brands, while constituting a mismatch of the stable development of the business situation.
2, related work in a timely manner with the leadership and communication between the relevant departments to ensure that the work is error-free. 20XX investment department will go all out to work hard, to struggle, to realize the mall rental rate in the competition to steadily improve the development.
Engineering Department work plan 7
First, the Ministry of Engineering
Supervisor:
Member:
Assistant:
Second, the Ministry of Engineering 20XX annual main tasks and objectives
1, for the supervision of the work of the existence of a number of irregularities, based on the "model bidding documents for highway projects", "quality inspection and evaluation standards for highway projects". Highway Engineering Quality Inspection and Evaluation Standards", "Highway Engineering Construction Supervision Specifications", highway engineering construction specifications, highway engineering test and inspection procedures, highway engineering standardization of construction technology guide, etc., targeted training for employees.
2, each supervisory body for the project characteristics of the year, respectively, to prepare a summary of the technical or management experience for other supervisory bodies to learn and exchange.
3, each supervisory body to prepare a monthly summary of the test and inspection work, reported to the engineering department of the seven companies, the Ministry of Engineering to check the summary reported to the company's leadership, so that the leadership of the supervision project project quality objectives to complete the scenario is clear.
4, each month, the supervisory body will supervise the completion of the project progress scenarios reported to the Ministry of Engineering summary by the Ministry of Engineering comprehensive analysis and summary reported to the leadership for reference, to facilitate decision-making and macro-management of the leadership. 5, the system to improve the engineering department database organizing work.
Third, the staff training program
1, January 10, 20XX before, each employee to prepare two (not limited to more) self in the work of the problems encountered or deviation from the norms of the phenomenon, the analysis of the adverse consequences caused by the improvement of methods or proposals, reported to the Ministry of Engineering mailbox.
2, the Engineering Department will be summarized according to the categories of the above issues, and based on the relevant contract terms, norms, standards, regulations and guidelines for answers and summaries, and then, reported to the company leadership review.
3, the above summary of the leadership review, issued after all employees to learn.
4, 20XX March 10 before, each supervision body for the learning scenarios were organized closed-book examination. 5, March 31, 20XX before the Ministry of Engineering staff training scenarios summarized in the company.
Fourth, the supervisory body management experience or technical exchange of relevant information
1, in the quality supervision, the superintendent engineer (resident engineer), professional supervision engineers, supervisors responsibilities.
2, in progress supervision, the overall progress plan and monthly progress plan format and information.
3, in terms of cost supervision, how to achieve simple, efficient, accurate and timely.
4, in terms of safety supervision, what are the shortcomings of our company, how to solve.
5, quality supervision, progress supervision, cost supervision, safety supervision, contract management and other work processes, to standardize, standardize, simplify.
6, roadbed and small bridge construction organization design key review information and considerations, bridge construction organization design key review information and considerations.
7, assembled box girder prefabrication and installation construction technology guide.
8, a variety of technical guidelines with the ratio.
9, steel welding and acceptance of the main problems, how to solve.
10, for construction risk management, supervision engineers in the organizational risk, economic and management risk, engineering environmental risk, technical risk, what experience and summary.
11 、Modern management, the system principle and the human principle in the supervision of the application of organizational structure.
12, can summarize and exchange of other matters.
V. Supervisory body test test work summary
Supervisory body to prepare a monthly test work summary, reported to the Ministry of Engineering, remember to systematic and comprehensive, do not stay in the ? test ? On.
Sixth, the project progress completion scenario
Supervisory bodies monthly in accordance with the "highway project bidding documents model" Appendix III "engineering management curve" information and requirements to report the monthly progress completion scenario.
Seven, the Ministry of Engineering database organization
The Ministry of Engineering first compiled a general list of data organization, sent to all employees, employees according to the actual scenarios into the corresponding directory requirements to collect the relevant information reported to the Ministry of Engineering, the Ministry of Engineering to summarize and organize.