April 19, the reporter in Yuncheng City, square cabin hospital construction site to see, outside the door of the square cabin hospital logo has been installed in place, the workers are busy pavement leveling and paving, the main body of the square cabin hospital project has been basically completed, the internal function of the region has been divided into a clear, with the initial conditions of use. Yuncheng city square cabin hospital construction project is the municipal party committee, the municipal government deployed to deal with the new crown epidemic important livelihood projects, the project is located in the center of the city Shun Di Street and the northwest corner of the intersection of the An Yi East Road, Shanxi Guo Ao Chongji plant area, the surrounding roads are smooth, convenient transportation. The project utilizes Guo'ao Chongji's existing plant and the surrounding site for renovation and construction, in line with the principle of "rather be prepared but not used, not used but not prepared", to provide strong protection for the prevention and control of the epidemic in our city. The project covers a total area of 35,300 square meters, with a total construction area of 13,483.57 square meters, one floor above ground, a building height of 13.7 meters, *** set up 1,032 beds. The interior of the square cabin is strictly divided into clean zone, buffer zone and contaminated zone according to the requirements, scientifically set up medical personnel channel, patient channel, evacuation channel, and equipped with a special zone for sewage treatment, disinfection and extermination.
Construction unit Yuncheng Construction Group.
Constructor exam chapter knowledge points summarized, I wish you an easy license.
Mobile question bank:/tiku/jzs/?utm_campaign=baiduhehuoren
PC question bank:/tiku/jzs/?utm_campaign=baiduhehuoren