Chapter I General
Article 1 In order to standardize the safety management of special operations within the scope of the company, control and eliminate the potential risks in the process of production and operation, prevent accidents, and achieve safe production of special revised XX Joint Stock Company Special Operations Safety Management Measures (hereinafter referred to as the measures).
Article II Scope of Application
(1) These Measures are applicable to special operations within the scope of the Company.
(2) The following operations are required to apply for a work ticket
1. Industrial fire operations: welding, gas welding, gas cutting, cutting, grinding and other operations that produce open flames within the company.
2. Entering the limited space operation: Entering the inside of the equipment; entering the special pipeline, trench, ground well, flue; carrying out inspection, testing, repair, maintenance and so on.
3. Earth moving operations: internal ground excavation, digging, drilling, piling, etc. carried out within the company.
4. Temporary power operations: all temporary power operations within the company.
5. Work at height: all kinds of work in accordance with the standards of Classification of Work at Height (GB/T3608-2008).
6. Hoisting operations: installation, removal, maintenance and other operations in the enterprise.
7. Pumping and plugging blind operations: due to maintenance or other operations to be pumped and plugged blind operations.
8. The company's internal regulations of the other required to apply for safety work permit program.
Chapter II Management and Safety Responsibilities
Article 3: The Safety and Environmental Protection Department of the company is the management of the company's special operations of the focal point of the department, the main responsibilities are:
(a) in accordance with these measures to develop, manage and monitor the company's safety management of the implementation of the rules of the special operations;
(b) is responsible for the supervision and assessment of the provisions of this regulation.
Article 4 The Production Coordination Department is responsible for production management in all operations.
Article 5 The units belonging to the company are responsible for conscientiously implementing, realizing and executing this system to ensure the safe implementation of various operations.
Chapter III Content and Requirements
Article 6 The operation ticket must be processed for each operation.
Article VII of the procedure for applying for the operation ticket
(a) The unit where the operation is proposed to designate a person to apply to the management.
(2) The operation ticket is issued and supervised by the Department of Safety and Environmental Protection and relevant departments and leaders in charge, focusing on timeliness.
Article 8 Contents of Operation Ticket
(1) The operation ticket shall indicate the contents of the operation and the starting and ending time of the operation.
(2) Specific precautionary measures and operation area shall be stipulated.
(iii) Relevant departments to be notified and specific protection requirements.
(d) Specify the person in charge of the operation and the operation guardian.
Article 9 Requirements for the use of operation ticket
(1) Strictly abide by the starting and ending time of the operation, and if the time is exceeded, it should make up for the corresponding procedures in time.
(2) There should be clear warning signs for the operation area.
(c) Precautionary measures should be informed to all operators, and wear and use protective equipment according to regulations.
(d) The guardian of the operation shall remain at his post and shall not be absent without leave or do other work.
(e) After the completion of the operation, the operation site should be cleaned up in a timely manner according to the norms and standards, notify the relevant departments to remove the warning signs, and report the completion of the operation to the competent authorities in a timely manner.
Article 10 The operation involves the key installations and key parts of the enterprise should carry out risk evaluation and develop corresponding control measures.
Article XI Fire Operations
(1) The company's industrial fire level classification
1. Class I fire
(1) capacity greater than 5000m3 (including 5000m3, including crude oil tanks, dirty oil tanks, oily sewage tanks, tanks containing natural gas water, etc.), the vessel body and accessory fire;
(2) capacity greater than 1000m3 (including 1000m3); (2) capacity of the container and accessories; and (3) capacity greater than 1000m3 (including 1000m3). (2) capacity greater than 1000m3 (including 1000m3) refined oil tanks and light hydrocarbon storage tanks of the fire;
(3) diameter greater than 426mm (including 426mm) gathering and transmission pipeline, in the oil (gas) trunk line on the stopping of the fire or non-stop transmission under pressure without replacing the pipeline equipment fire;
(4) natural gas recovery device and the field of the heater, distillation towers, separators, tanks, heat transfer equipment of the fire;
(5) gas recovery unit and field of heating furnace, distillation tower, tanks, heat exchange equipment Fire;
(5) natural gas compressor plant, flow meter, valve group, instrumentation, natural gas pipeline fittings and instrumentation at the fire;
2. secondary fire
(1) crude oil storage capacity of 1000m3 ~ 10000m3 tank area, within the perimeter walls of the explosion risk area within the scope of the in-use oil and gas pipelines and container body fire;
(2) capacity of less than 5000m3 tanks, container body and accessories of the fire;
(3) capacity of less than 1000m3 refined oil tanks and light hydrocarbon tanks of the fire;
(4) capacity of 1,000m3 ~ 10,000m3 crude oil storage of crude oil metering and calibration room, metering room, the valve group room, the instrumentation room, and the crude oil, dirt oil pump room of the fire;
(4) capacity of 1,000m3 ~ 10,000m3 crude oil storage of crude oil measurement calibration room, metering room, valve group room, instrumentation room and crude oil, dirty oil pump room;
( (5) automobile tanker oil filling station and unloading station inside and outside the equipment and pipeline fire;
3. Third-degree fire
(1) crude oil storage capacity of less than 1,000m3 (including 1,000m3) of oil depots, gathering stations within the perimeter wall of the explosion hazardous area of the in-use oil and gas pipelines and containers on fire;
(2) the capacity of less than 1,000m3 (including 1000m3 (including) tanks and crude oil depot measurement calibration room, measurement room, valve group room, instrumentation room, dirty oil pump room fire;
(3) in the production area of oil and gas pipeline perforation leakage patching fire;
(4) oil (gas) trunk line perforation micro-pressure leakage patching, corrosion of perforated parts of the patch welding and reinforcement of the fire;
(5) Welding and cutting of oil, gas and other flammable and explosive media contained within the perimeter of the explosion risk area. Other flammable and explosive media barrels, tanks, tanks, bottles of the fire;
(6) in addition to the first and second level of fire, other oil and gas production and production of prohibited areas of smoke and fire fire.
4. If there are light hydrocarbons and condensate in the device or pipeline, the ignition level will be adjusted upward by one level.
(b) normal production of devices and tanks, where not fire all immobile, where it can be removed must be removed to a safe place to fire. Under normal circumstances, holidays and night work, non-production is necessary, all prohibited fire. In case of emergency, after requesting the approval of the approval of the level of fire, in order to ensure the safety of the situation, you can take emergency fire measures, and then make up for the fire operation procedures and programs.
(C) the fire scene should be in accordance with the requirements of the fire safety measures, equipped with adequate fire trucks, firefighting and medical equipment and equipment.
(d) Where the fire operation involves other special operations, must apply for the corresponding operation ticket, is strictly prohibited to "industrial fire operation ticket" instead.
(E) equipment requirements
1. using electric welding for pyrotechnic construction of tanks, containers and pipelines should be installed near the welding point of the grounding wire, its grounding resistance should be less than 10 Ω. The construction site layout and requirements of electrical wiring should be consistent with the requirements of the GBJ50257 "electrical installation of electrical installations in explosion- and fire-hazardous environments electrical installation and acceptance of the Code" requirements.
2. Welding machine and other electrical equipment should have a good grounding device, and install leakage protection device.
3. All kinds of construction machinery, tools, materials and fire-fighting equipment should be placed in the safe area determined by the fire safety measures.
(6) Places containing hydrogen sulfide or other toxic gases should be made appropriate anti-poisoning measures, of which places containing hydrogen sulfide specific implementation of the "Interim Provisions on the Prevention of Hydrogen Sulfide Poisoning Accident Management of China National Petroleum Corporation" requirements.
(VII) fire operation isolation requirements
1. Industrial fire should first cut off the source of materials and add a good blind, after a thorough blowing, cleaning, replacement, open the manhole, ventilation, gas analysis by the detection of qualified before starting the fire. If the gas detection more than 1h after the fire, the gas should be tested again, qualified before the fire operation.
2. and fire parts connected to the oil and gas pipeline must be reliable isolation, blocking or removal of processing.
3. and fire directly related to the valve must be marked with a sign to indicate the state; need to fire construction equipment, facilities and fire directly related to the control of the valve by the production unit to arrange for the operation and supervision of the person (can be added to the safety locks), the operation is not completed before you can not leave your post.
4. fire construction area should be set up to guard, strictly prohibit the fire operation with no personnel or vehicles into the fire area.
5. The fire operator in the fire point of the upwind operation, should be located to avoid the oil and gas flow may be sprayed and blocking material shot out of the orientation. Special circumstances, should be taken to isolate the work and control sparks flying.
(H) the requirements of the gas test fire operation
1. need to fire tower, tanks, containers and other equipment and pipelines, cleaning, replacement and ventilation, to analyze and test the concentration of combustible gases to reach the permitted concentration of operations before the fire operation.
2. Where into the tanks, towers, kettles and other containers within the confined space fire, sampling and analysis of gas in the confined space. Gas analysis should include combustible gas concentration, toxic and hazardous gas concentration, oxygen and nitrogen concentration, etc., the combustible medium (including explosive dust) content must be less than 10% of the lower explosive limit of the medium and air mixtures (by volume), the oxygen content of 15% to 25%, toxic and hazardous gases should be in line with the provisions of relevant national standards. Gas samples should be representative (large volume should be more than one sampling, according to the size of the medium and the relative density of air to determine the sampling focus should be above or below). Analysis results reported, sampling and analysis of samples should be retained for at least 8 h. Abnormalities, should stop the fire, re-sampling and analysis.
3. Before the fire construction operations, the fire point and the operating area should be combustible gas concentration in the air for testing, fire construction operations in the combustible gas concentration should be less than 25% of the lower limit of its explosion. If forced ventilation measures are taken, the wind direction should be consistent with the natural wind direction.
4. In the whole process of the ignition construction, the ignition guardian should follow up the detection of combustible gas concentration.
(IX) into the limited space fire operation requirements
1. in the tank, tower, kettle or other combustible media in the limited space fire, in addition to the internal material after the clean, should be carried out after the steam blowing (or cooking), nitrogen replacement or water flushing, and then open the upper, middle and lower manhole, the formation of air convection or the use of mechanical forced ventilation ventilation, to prevent the emergence of dead ends.
2. All sources of materials that may affect this limited space should be cut off.