Warehouse heat stroke prevention measures program (practical 6 articles)

? Don't panic when heatstroke occurs, catching cooling is the most important. Very hot summer is coming, we have to guard against heatstroke situation occurs, because heatstroke will lead to high fever, dehydration, electrolyte disorders, serious shock can occur. What do you need to pay attention to when writing a summer heat stroke prevention program? I specially for you to carefully collect and organize the "warehouse heat stroke prevention measures program (practical 6)", I hope to provide you with more reference.

Warehouse heat stroke prevention measures program (practical 6) a

? First, the purpose and requirements of the exercise.

? In order to implement the occupational health and safety management system standards, to deal with potential heat stroke prevention and cooling accident hazards, to ensure the personal safety of the workers, to clarify the emergency rescue procedures, to ensure that the first aid plan is carried out in an orderly manner, especially the preparation of the plan.

? Second, the preparation of the basis.

?1, "People's Republic of China *** and the State Work Safety Law".

?2, "Regulations on the Safe Management of Dangerous Chemicals".

?3, "production and management unit safety production accident emergency plan preparation guidelines"

? Third, the drill time, location, and participants in the drill.

?1, drill time: xx, xx, xx, 20xx, 13:00 - 13:30.

?2, drill location: production department xx cross-cutting unit operation side of the 1 # stacks around the area.

?3, the participants in the exercise: the exercise leadership team, the A operation area, the warehouse A class, turn the package group.

? Fourth, the exercise leadership team.

?1, leader: xx.

?2, deputy leader: xx (command), xx (organization), xx (organization).

?3, planning: xx.

?4, group members: xx, xx, xx.

? V. Rescue equipment and materials:

? First aid kit (medical alcohol, Ren Dan, ten drops of water, patchouli, bandages, disinfectant), communication tools, towels, mineral water, electric fans.

? Sixth, the exercise process:

?1, cross-cutting employee xx in the 1 # stacking operation, heat stroke collapsed on the ground (simulation of the accident), the shift leader xx found, notify the shift operations chief xx.

?2, operations chief xx received the accident report, immediately reported to the exercise leading group, while starting the emergency plan, the organization of the scene rescue.

?3, xx: in the rescue at the same time to isolate the scene protection, evacuation of unrelated personnel, protection of the accident scene.

? Seven, first aid steps:

?1, moving: operations chief xx organization site personnel will heatstroke employees xx quickly lifted to the ventilation, cool, sweet place, so that they lie down, head elevated, and unbuttoned, loosened belt, cuffs.

?2, cooling: the patient's head covered with a wet towel, with cold water bath, to accelerate the dissipation of heat, but can not be directly to the patient blowing wind, to prevent the cause of cold.

?3, hydration: if the heat stroke is awake, no nausea, vomiting, you can drink salt water, to play the role of cooling, replenish blood volume. When replenishing water, do not rush to replenish a large amount of water to avoid causing vomiting, abdominal pain, nausea and other symptoms.

?4, promote wakefulness: If the patient has lost consciousness, you can finger pinch Renzhong, Hegu and other points, so that it wakes up. If breathing stops, artificial respiration should be implemented immediately.

?5, transfer: for severe heat stroke patients, must be sent to the doctor in time. Transportation should be as far as possible on the way to physical cooling, to protect the brain, heart and lungs and other important organs. You can use a cold compress on the head, or use medical alcohol bath until the skin is red.

?6, emergency care after heat stroke employees slowly awakened.

?7, the operations chief Yan Wei confirmed to the exercise leadership team to report the completion of the heat stroke emergency plan site exercise.

? Eight, the exercise leading group summarized the exercise and announced the end of the exercise.

? Nine, the exercise personnel to withdraw from the exercise site, the units to resume operations.

? X. Summarize the problems in the exercise and develop an improvement plan.

Warehouse summer cooling measures program (practical 6) Part II

?1, Purpose:

? In the summer work process, due to more open-air working environment, personnel work distribution area is complex and variable; labor intensity and other aspects of the impact of the work has brought a lot of inconvenience. In order to protect the legitimate rights and interests of workers and life safety, property safety, for the staff to create a secure, comfortable environment

?2, the scope of application:

? This system applies to the xx project department of xx electric construction xx company.

?3, specific provisions:

? (1) conscientiously implement the responsibility system to prevent heatstroke.

? The relevant units should seriously implement a series of requirements related to the construction site to prevent heat stroke, to the front-line construction workers in a highly responsible attitude towards life and health, and effectively strengthen the organization and leadership of the work of heat stroke prevention, improvement, implementation of the responsibility system, the development of contingency plans, pay close attention to the implementation of precautionary measures, to prevent heat stroke and various types of production and safety accidents due to high-temperature weather triggered by the workers.

? (2) Reasonable arrangement of work and rest time.

? To pay close attention to the meteorological forecast of hot weather, meteorology will be the maximum daily temperature greater than or equal to 35 degrees Celsius defined as "high temperature day", more than five consecutive days "high temperature day" called "sustained high temperature ". Strictly implement the measures to avoid high temperatures by "grasping the two ends and resting in the middle", appropriately adjusting the labor and rest system for summer high-temperature operations, reducing the intensity of labor, strictly controlling the time of outdoor work, avoiding work during high-temperature hours, and ensuring the health and safety of workers. In principle, the temperature exceeds 37 ℃, strictly prohibit 11:00 to 15:00 outdoor work.

? (3) Strengthen the rotation of rest at work.

? In the summer according to the process of construction, as far as possible to adjust the labor organization, to take the way of hard shift, shorten the time of one continuous operation, and strengthen the rotation of rest at work. Strengthen the site inspection, increase the knowledge of heat stroke and heat stroke first aid knowledge publicity, improve the safety awareness of the whole staff.

? (4) Ensure adequate supply of drinking water on site.

? The site should be supplied with enough hygienic drinking water, beverages, tea and various soups, etc., to effectively prevent heatstroke and avoid heatstroke.

? (5) The implementation of heat stroke prevention and cooling items.

? To effectively care in the hot weather adhere to the construction of 'the majority of front-line construction workers, to strengthen the publicity of the knowledge of heat stroke prevention and cooling, requiring construction workers to carry heat stroke medicines, such as: Rendan, Qingliang oil, anemarrhen, etc., the implementation of each worker's heat stroke prevention and cooling items.

? (6) Actively improve the production and living environment of construction sites.

? To conscientiously implement the provisions of the management of construction sites, and actively take measures to strengthen ventilation and cooling, to ensure that the construction workers' dormitories, canteens, toilets, showers and other temporary facilities to meet the needs of heat stroke prevention and cooling, and to provide construction workers with cool beverages and commonly used medicines to prevent heat stroke. Construction site construction site dormitory and canteen must be installed electric fan, have the conditions of the unit, should be installed in the dormitory air conditioning.

? (7) Effectively do a good job of hygiene and epidemic prevention.

? To effectively do a good job of construction sites and living areas of health and epidemic prevention, strengthen the drinking water, food hygiene management, strict implementation of the food hygiene system, to avoid food spoilage caused by poisoning; to strengthen the monitoring of summer-prone diseases, the site operators occur statutory infectious diseases, food poisoning, should be promptly reported to the relevant authorities.

? (8) Do a good job of summer fire prevention.

? For the summer heat, dry weather, fire accidents are easy to occur in the actual situation, to further strengthen the prevention of fire measures, the distribution room, warehouse, paint room and other flammable places to carry out regular inspections, found that the problem is immediately dealt with, and at the same time, according to the provisions of the fire extinguishing equipment.

Warehouse summer cooling measures program (practical 6) Part III

? In order to ensure the smooth construction of the new Xingtai modified asphalt base project in Hebei, to ensure that when an emergency occurs during construction, the emergency rescue work can be rapid and effective, to maximize the protection of the lives of enterprise workers, property safety, according to the characteristics of this project, specially formulated this plan.

? First, this plan is for the construction of a variety of different emergencies developed to ensure that a variety of emergency resources are in a good state of readiness; and can guide the emergency action in accordance with the plan in an orderly manner, to prevent the delay of the accident due to the action is not effective or on-site rescue work of the chaos of the emergency, thereby reducing casualties and property damage. Emergency in construction refers to a sudden, causing or likely to cause more casualties, larger economic losses of all types of construction accidents.

? Second, the establishment of construction emergency response leading group, responsible for the command and coordination of emergency rescue work. Leading group commander-in-chief by the branch manager Sun Qi is responsible for the implementation, if the commander-in-chief out of the assistant manager Lu Zhili as deputy commander-in-chief to give implementation, when the deputy commander-in-chief is not in the case, by the team leader for implementation. The implementation of rescue work to start, the specific personnel arrangements see the emergency plan organization.

? Third, when a variety of emergency symptoms of high temperature occurs in the project and building construction, after receiving the emergency report, should immediately start this plan. In the first time respectively to the company emergency rescue command center, "120" ambulance center for help, and to the municipal safety production supervision bureau, trade unions and other relevant departments to inform the situation. After the emergency, should also be uninterrupted to the relevant leaders, departmental feedback follow-up.

? Fourth, in the construction of the emergency occurred, the branch that is, as appropriate, set up a rescue site command, by the manager Sun Qi as the accident scene commander-in-chief, and set up the following leading groups:

?1, summer heat protection protection group

? Summer work process, due to the more open-air working environment; personnel work distribution area is complex, variable; labor intensity and other aspects of the impact of the work to a lot of inconvenience. In order to protect the legitimate rights and interests of workers and life, property safety, for the staff to create a guaranteed, comfortable environment, in the staff of high temperature adverse reaction, by the team leader to immediately organize the members of the group, the accident personnel transfer and control, to prevent the increase of accident personnel around the scene. Make the emergency action has a stronger target, improve the efficiency of the action. So as not to cause huge accident losses.

?2, information liaison group

? By the head of the group is responsible for understanding the casualties and economic losses and the scope of the impact of emergencies, the daily organization of the collection of weather temperature conditions, and then take the necessary precautions, and the measures taken and the development of the situation, and timely report to the superiors and the liaison of relevant departments.

?3, safety and security (vigilance) team

? The evacuation area and the resettlement area of the security work, organized by the team leader team members responsible for the development of dangerous conditions to monitor the situation, to prevent the impact of the construction period, and to strengthen the safety education of the personnel of the various teams to further enhance safety awareness and organization of the site management personnel to carry out safety inspections on the construction site, to eliminate potential safety hazards, in order to prevent the occurrence of vicious accidents and how to control the impact of the accident in the smallest possible range in the event of an accident.

?

?4, on-site medical rescue team

? When the accident occurs, the team leader to organize the team members of the injured on-site classification and first aid treatment, responsible for the first time to the injured to implement effective ambulance; and timely referral to the hospital. The main responsibilities of the ambulance staff are: to enter the accident area to rescue the injured; to guide the people in the hazardous area to carry out self-rescue and mutual rescue activities; to concentrate, count, convey and admit the injured. According to the specific circumstances, the rapid development of emergency treatment programs and organization and implementation.

?5, logistics support team

? By the head of the group is responsible for organizing the mobilization of rescue personnel, materials and equipment, supervise and check the implementation of the rescue and relief measures in place.

? Fifth, in the construction of the emergency occurred, the rescue site command according to the specific circumstances, can be near from Xingtai Road and Bridge asphalt library mobilization rescue team, personnel, supplies and equipment. At the same time professional rescue team, supplies and equipment from the emergency reserve rescue team mobilization.

? Sixth, after the occurrence of various types of emergencies, the need to mobilize the main professional rescue team, emergency rescue supplies. The main materials and personnel duties are arranged as follows:

?1, personnel, materials preparation:

? Branch of the acquisition of supplies by the manager is responsible for the main drugs and medical rescue apparatus are as follows:

? (1), medicines: cold medicine, fever medicine, diarrhea medicine, anti-inflammatory drugs and other therapeutic drugs and Rendan, ten drops of water, Zhengqi water, chrysanthemum tea, fire-reducing herbal tea, green health food, green bean water.

? (2), ambulance apparatus: single frame, ambulance cars, small oxygen cylinders, earpiece, hospital beds, towels, medicine medicine box, freezer (ice) and so on.

? Seven, rescue methods:

?1, mild patients

? On-site staff dizziness, fatigue, dazzling phenomenon, the staff should immediately stop the operation to prevent secondary accidents, other peripheral staff should be arranged to the symptoms of the staff to a cool, well-ventilated area to rest, supply their cool water, wet towels, etc.. And notify the leadership of the branch.

?2, serious patients (fainting, shock, severe body dehydration, etc.)

? When the work site appears heatstroke personnel, the operation of the surrounding personnel should immediately notify the leadership of the branch plant, and promptly transfer the accident personnel to a cool ventilated area, observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand medical information. The branch plant should be based on the specific circumstances, the emergency commander decides whether to start the emergency plan for heat stroke prevention and cooling. And immediately organize ambulance personnel in person to the scene of the accident personnel treatment. In the case of serious symptoms, if the medical equipment of the branch plant cannot save the person, the person should be transferred to the nearest hospital for observation and treatment at the first time. And reported to the company.

? Seven, the aftermath of the work:

?1, according to the accident "four do not spare" principle, seriously do a good job of investigating and handling accidents, to take targeted precautionary measures, to strengthen the publicity, education, so that each person has mastered the summer construction process of the precautions to be taken to ensure that each person knows how to Protect yourself; know how to rescue others. Summarize the lessons learned to prevent the occurrence of similar events, specific preventive measures are as follows:

? (1), by the information team in the construction site to set up thermometers, and the daily weather conditions for the collection, processing, and then reported to the plant to prevent heatstroke protection team, according to the specific circumstances of the corresponding safety precautions.

? (2), when the outdoor temperature is higher than 39 ℃, the plant should be the construction of each team to cool the special safety briefing, so that its teams to stop on-site construction operations.

? (3), the logistics support team should be able to ensure that the staff site at any time drinking water, emergency drugs.

? (4), by the heat stroke emergency rescue organizations in accordance with the temperature of the year to develop a set of reasonable and effective "staff schedule" to avoid the highest daily temperature (11:00 ~ 15:00) section of the construction work. Discussed by the branch, the development of the company's summer (based on the city's annual high temperature months for July to September) construction schedule, as follows:

? Morning: 8:00 to 12:00

? Afternoon: 15:00 to 19:00

? In case of overtime work is required to meet the deadline or other special circumstances, further notice will be given.

? (5), the branch of the safety education of all shifts, to enhance the staff of various situations should be tight handling capacity. Strengthen the summer construction safety publicity work, so that each person understands and masters the safety of heat stroke prevention and cooling common sense, improve the staff's ability to cope with the strain and handling ability in practice, etc..

? Eight, emergency recovery, re-entry

? When the emergency recovery, re-entry must be evaluated before the hazardous area, and the accident should be analyzed, until the hazardous area has been determined to be safe before entering the scene, continue to operate.

? Nine, emergency drills

? Emergency plans and emergency plans established, after effective training, branch or company before the arrival of summer each year to carry out large-scale rescue drills. At the end of each exercise, a timely summary, there are certain gaps in the future work to improve.

?1, the purpose of the exercise

?1), test the effectiveness and adequacy of the emergency plan and implementation procedures

?2), test the emergency equipment

?3), to ensure that the emergency response organization is familiar with their tasks and responsibilities

?4), to test the coordination of emergency response personnel

?5), identify and correct the defects in the plan

?6), to ensure that the emergency response organization is familiar with their tasks and responsibilities

?7), to ensure that the emergency response organization is familiar with their tasks and duties

?8), the emergency response organization is familiar with their tasks and duties

? deficiencies in the plan

?6), testing the adequacy and effectiveness of emergency response equipment

?2. Emergency response plan drills

? In order to improve the technical level of the rescue personnel and the overall ability of the rescue team, so that in the rescue operation of the accident, to achieve rapid, orderly and effective results. The branch will regularly carry out a rescue drill, emergency rescue training has become an important work of the rescue team, so in the emergency rescue process the branch also emphasizes the following four points:

? (1), the drill personnel must be on time in place, and with their respective protective equipment.

? (2), in the rescue process should do "self-protection, rescue others" and active and effective rescue.

? (3), must strictly abide by the command of the relevant leaders, to do "false to the truth", the effective implementation of rescue measures.

? (4), the basic task of emergency training and exercises is: exercise or improve the team's unexpected accidents, rapid rescue and blocking the source of timely rescue of the injured, correctly guiding and helping the masses to protect or evacuate, effectively eliminate the consequences of hazards, to carry out on-site emergency first aid and casualty evacuation and other emergency rescue skills and emergency response to effectively reduce the hazards of the accident, reduce the loss of the accident.

Warehouse summer cooling measures program (practical 6) Part IV

? A purpose:

? Into the summer season, in order to avoid safety accidents caused by high temperature and heat, to protect the health of the operating personnel, constantly improve labor conditions, to prevent heat stroke and other types of production safety accidents caused by hot weather workers. Each workshop, section should attach great importance to, take measures, highlight the key points, and effectively strengthen the supervision and management of production safety, to prevent the occurrence of various types of accidents. Now on the effective production safety measures during the summer heat as follows:

? Second, the establishment of summer cooling work leading group:

? Leader: xx

? Vice Chairman: xxx

? Members: xxxx

? The leading group office is located in the safety and environmental protection section, xxx as director.

? Office phone 7346

? Third, the specific measures to prevent heat stroke:

? (A), seriously implement the responsibility system to prevent heat stroke. Workshops, sections to seriously implement the specific requirements of the production site to prevent heatstroke, to the front-line staff life and health of a highly responsible attitude, and effectively strengthen the prevention of heatstroke work of the organization and leadership, improve, implement the responsibility system, the development of contingency plans, pay close attention to the implementation of precautionary measures, to prevent the workers from heatstroke due to the hot weather triggered by the various types of production and safety accidents.

? (B), a comprehensive organization to carry out summer safety inspection. To effectively strengthen the safety of production, to prevent the summer heat and strong convective weather and other natural disasters caused by various types of accidents as a top priority to grasp, comprehensive organization of all professional sections, workshops for seasonal inspection, the implementation of

? Formulate preventive measures, and make every effort to curb the occurrence of accidents during the high temperature.

? (C), strengthen the operational safety during maintenance. To highlight the key projects hidden danger management, especially for electric and gas welding operations, limited space, work at height, etc. Supervision, strict implementation of safety precautions before overhaul. All personnel participating in the overhaul should strictly comply with the safety measures of the Overhaul Safety and Environmental Protection Program. Open a good overhaul pre-shift meeting, to participate in the overhaul of the personnel to carry out the "five", that is, handing over the construction task, handing over safety measures, handing over the safety overhaul method, handing over the safety precautions, handing over to comply with the relevant safety regulations. The guardian must be in the scene from beginning to end of the monitoring, can not be unauthorized, seriously check the construction site, the implementation of safety and technical measures.

? (D), strengthen the safety control of hazardous chemicals. In view of the rising temperatures easily caused by hazardous chemicals volatilization, leakage and deflagration, to increase the monitoring of major sources of hazardous chemicals, hazardous chemicals devices and pipelines to do a good job of explosion-proof, anti-lightning, anti-leakage, etc., and conscientiously implement the production and storage of hazardous chemicals production and storage sites ventilation, cooling, waterproofing, moisture-proofing, fire prevention, explosion-proof, lightning and other measures, warehouses, pumping stations should be ventilated at any time to change the ventilation, the storage tanks should be Ensure that the alarm device is intact; the production and storage of hazardous chemicals should be "three inspections a day" and "three fixed" (i.e., quantitative storage, regular temperature measurement, regular ventilation); loading and unloading platforms should be well prepared for lightning protection, anti-static, emergency rescue and accident disposal. Strictly control the loading flow rate during the loading process to prevent the accumulation of static electricity. In order to avoid the hot weather, benzene hydrogenation storage and transportation, tar storage and transportation, tar modified asphalt loading and unloading platform in the 11:00 to 15:00 period prohibited loading and unloading operations.

? (E), strengthen the rotation of rest at work. According to the links of operational activities, adjust the labor organization, inspection and maintenance operators to take the intermittent mode of operation, the site of other operations

? Personnel to shorten a continuous operation time, to strengthen the work of the rotation rest.

? (F), to ensure adequate supply of drinking water on site. Comprehensive office is fully responsible for all kinds of summer cooling supplies, drinking water contact collocation, distribution work, supply workshop enough health requirements of drinking water, beverages, summer tea and a variety of soups, etc., effective prevention of heat stroke, to avoid heat stroke events.

? (G), the implementation of summer cooling items. Safety and environmental protection section is responsible for the issuance of heat stroke medicines in the workshop and the tracking and checking of employees taking medicines. Strengthen the publicity of the knowledge of heatstroke prevention and cooling, and require operators to take or apply heatstroke prevention medicines before operation, such as: Rendan, Qingliang oil, anemarrhen, etc., and implement the heatstroke prevention and cooling items for each worker.

? (H), effectively do a good job of health and epidemic prevention. To effectively do a good job on-site and dormitory health epidemic prevention work, strengthen the drinking water to strengthen the monitoring of summer-prone diseases, the site operators occur statutory infectious diseases, food poisoning, should be promptly reported to the scheduling, safety and environmental protection section. Dormitory hygiene should be made clean, the house should be moderately ventilated, pay attention to personal hygiene, often use hand sanitizer (soap) and water to wash hands, especially after coughing or sneezing. Cover your nose and mouth with a tissue when coughing or sneezing, and then dispose of the tissue in the trash. To achieve "early detection, early reporting, early isolation, early treatment", to improve the staff's ability to prevent disease, to ensure personal safety.

? (Ix), do a good job of summer fire prevention. For the summer heat, dry weather, fire accidents are easy to occur in the actual situation, to further strengthen the prevention of fire measures, electrical instrumentation workshop organization of the distribution room, oil pump room and other flammable places to carry out regular special inspections, found that the problem immediately rectified to avoid accidents.

? (J), do a good job on duty and information reporting. Each section, workshop should seriously develop heat stroke, flood control, fire prevention, anti-poisoning emergency plan, do a good job of emergency teams and emergency supplies

? Preparation. Arrange the duty work during the high temperature and strong convective weather, the occurrence of dangerous situations and accidents, must be immediately reported, and in the first time to the scene to deal with, to prevent the expansion of the accident.

Warehouse summer cooling measures program (practical 6) Part V

? Summer heat, the temperature gradually climbed. In order to further do a good job in the summer heat stroke prevention and cooling work, to ensure that employees' physical and mental health, improve the work of the staff, enthusiasm, to ensure that the high temperature environment in the safe, efficient, high-quality completion of the tasks, the company decided to carry out the summer to send the cool activities, the activities are now related to the program is as follows:

? First, the activity time

?20xx August 5 ~ August 10

? Second, the requirements of the activities

?1, the head of the department unified deployment of the assigned project to send the arrangement of cool activities.

?2, the departments within a week to the summer cooling items in a timely manner to the project department.

?3 During the activity period, we should pay special attention to the weather forecast and adjust the activity plan in time to ensure the delivery of cool service on key days and hours.

?4 Requirements of the departments in the delivery of cool more communication with the project staff at the same time, to understand the needs of the staff, the company's concern for the heart of each employee.

Warehouse summer cooling measures program (practical 6) Part VI

? A purpose

? In order to strengthen the high temperature operation, hot weather labor protection work, in order to effectively do a good job of summer construction site heat stroke prevention and cooling work, to protect the health of the operators, and constantly improve the labor conditions, to prevent heat stroke and other types of production safety accidents caused by hot weather workers. According to the "Chinese people's *** and the State Occupational Disease Prevention and Control Law", "Chinese people's *** and the State Labor Law", "heatstroke prevention and cooling measures management measures" and other relevant laws and regulations, special planning this program.

? Second, the scope of use

? All personnel and interns of Shuangfu production plant

? Third, the definition of terms

?1) daily maximum temperature reaches more than 35 ℃, 37 ℃ or less for general hot weather;

?2) daily maximum temperature reaches more than 37 ℃, 40 ℃ or less for moderate high temperature;

?3) daily maximum temperature reaches 40 ℃ or more for intensity of high temperature;

?4) sustained High temperature refers to more than five consecutive days of "hot days"

?5) Hot weather operation refers to the employer's arrangement for workers to carry out operations in a hot natural meteorological environment during hot weather.

? Fourth, the implementation time

?July 20xx ~ 20xx October (if the outdoor temperature continues to 36 ℃ or more, the implementation date is appropriately postponed)

? V. Relevant requirements

?1) Statutory requirements: Yufu Banfa [20xx] No. 166

? During hot weather, the employer shall, in accordance with the following provisions, according to the characteristics of production and specific conditions, take measures to reasonably arrange working hours, rotate operations, appropriately increase the rest time of workers in hot working environments and reduce the intensity of labor, and reduce the number of outdoor operations during hot periods:

? Employers should adjust the operation time according to the forecast temperature issued by the meteorological stations affiliated with the municipal meteorological authorities on the same day, except for emergency treatment required for disaster rescue, personal property safety and public interest.

? (a) general hot weather, the employer should take shift rotation and other ways to shorten the continuous operation time of the workers, and shall not arrange for outdoor open

? Day work workers overtime; employers should effectively do a good job of hot weather heat stroke prevention and cooling work, develop and implement measures to prevent heat stroke, to ensure that heat stroke prevention equipment, equipment and normal operation.

? (B) moderate hot weather, the employer all day to arrange for workers outdoor open-air work time should be in accordance with the safety supervision of the General Security Health [20xx] No. 89 document related

? The provisions of the implementation, and suspend 12-16 hours of high temperature outdoor open-air work. Due to the production process requirements must be in the hot hours of open-air work, the employer should be reasonable adjustment of work and rest time, and take measures to prevent heat stroke.

? (C) intensity of hot weather, should stop the day of outdoor work. Because of the production process requirements must be open-air work, the employer shall reasonably adjust

? Adjust the work and rest time, and take measures to prevent heat stroke.

?2) Site status:

? (a) due to the assembly workshop is hotter; work time has been when the sun, no ventilation, the roof is the board room to absorb heat, the summer temperature can reach more than 50 degrees; (b) the actual temperature of the assembly plant site than the Chongqing Weather Report temperature is higher than more than 2 °, July 9 assembly plant has been four employees heat stroke;

? Sixth, the cost budget:

?58,981 yuan

? (A) summer supplies budget: ¥ 15,400 yuan

? (B) cool drinks budget: ¥ 18,300

? (C) cooling equipment budget: ¥ 25,281 yuan

?1) summer high-temperature working hours adjustment

? Remarks:

?Mid-July ~ October is estimated to have 65 days the temperature reaches 35 ° above the temperature above 35 ° for the four major workshops to prepare the following cooling food:

?1, mung bean soup: 30 pounds of mung beans / day

?2, 10 pounds of sugar / day

?3, summer tea: 1 pound / day