R & D probationary period work summary

R&D probationary work summary 1

1, in order to adapt to the needs of enterprise development, market changes, technology and quality of the Department of modified "xxx" corporate standards, and through the audit, is now applied with the new label.

2, the acceptance of incoming raw and auxiliary materials. In this month, the Department of Technology and Quality in strict accordance with the company's newly developed documents, non-conforming products resolutely to be rejected, qualified products carefully check its pass rate, basically the workshop commonly used auxiliary materials loss control within the scope of the deduction.

3, the company's existing bar code for a comprehensive review, and the new bar code for application, filing. At the same time, in response to the needs of the Shanghai distributor, the "xx dry red wine" and "xxx dry red wine" bar code information into the "gds" to adapt to local

4.

4. With the changes in the wine market, the consumers' understanding of wine is also changing accordingly. According to this change, according to the requirements of the company's leaders and customers, we have conducted repeated tests and tastings, and newly developed "xxx and other wines" and other products, which have enriched the market to meet the needs of different consumers.

5, in the packaging workshop production period, the technical quality of the Department of personnel, regardless of holidays, take turns to stick to the filling of the long term often at the work site, the quality inspection staff carefully check the production process, to eliminate the possibility of all bacteria into the, and at any time to check the use of raw materials, found unqualified or unsafe hidden dangers in a timely manner to be resolved.

6, the laboratory personnel every half to one month to brewing workshop of all the tanks of wine for a test, in order to observe the changes in the state of wine; quarterly analysis of all the wine for the whole. For the workshop newly adjusted wine such as: xxx dry white x dry red, xxx wine timely testing, for the workshop's production to provide a convenient. At the same time, the inspection staff of the production of each batch of wine in a timely manner to do the full analysis, to provide a reliable guarantee for the production, and every day on the filling of wine and other links to do microbiological testing.

7, in order to make the inspection and laboratory data accurate, the department has formulated the corresponding self-calibration procedures, and self-calibration of the existing instruments and utensils.

8. In order to ensure the quality of wine, in addition to the strict monitoring of the workshop, we also check the status of the original wine in stock at least once a month. For the finished wines leaving the factory, no matter how many quantities, all of them will be inspected, and the unqualified products will not be discharged from the warehouse, and then these wines will be inspected, put forward, and implemented to ensure that the rate of finished wines leaving the factory reaches 100%.

9. The Technical Quality Department responded positively to the requirements of the head office in its work, and in order to facilitate the smooth implementation of "quality integration", the department conducted a serious study of it and discussed its related documents, laying a good foundation for the future work

10.

11, in order to reduce production costs and save money, the department formulated the "raw and auxiliary materials quota loss indicators" and "material loss management approach" to guide the future work of production.

Although the technical quality department has made some achievements, but there are also some shortcomings. Accordingly, in the next month's work, the Department of Quality should also overcome the shortcomings, play the advantages, so that their work to a higher level.

R & D probationary period work summary 2

20xx year is almost over, looking back on the 20xx year R & D work, there are fruitful joy, there are with colleagues in collaboration with the hardship, but also encountered difficulties and frustrations when the melancholy. Time flies, unknowingly, full of dreams and passion for the 20xx year with the beginning of the new year is approaching, I May before the Ministry of Resources work since May after joining the R & D Department, melting into a member of the collective, in line with the love of the work, hold a positive, serious attitude to learn, do everything with all my heart, do a good job in the front-end work, and make full use of this platform to enhance their own skills, looking back on the journey, the harvest and feelings.

Although in the school learned is a website development professional, but after graduation engaged in this industry only a few months, the knowledge learned basically did not use, after two years of re-entry into the industry, the feeling is still a little bit of effort, thanks to the R & D colleagues in the work of the help, to be able to quickly get started, no delay in the work, into the work of the state, and then make up for a period of time, the production of front-end! Basically can be completed independently, the front-end is a very complex position, the knowledge involved is very broad, at first did not understand what the front-end is mainly to do, only a very shallow understanding, that as long as the page layout of the artist into html format to achieve some dynamic interactive effects can be, this may be only the primary or intermediate front-end to do the work, if the development of a higher level, we must work with the program to connect with the server, this understanding may still have some problems, this may also be the case. This understanding may still have some problems, for me this is also considered a novice is really a bit difficult, a lot of things do not quite understand, have to learn, the problem still exists, may be because of really like this job, I never want to give up, I will continue to work hard to improve the efficiency of learning, in order to be able to better complete the work in the future to be prepared.

In the resource department pe channel management period, the main work:

First, the daily pe (hdpeldpelldpe) information release;

Second, the daily pe (hdpeldpelldpe) editing text message;

Third, the daily update of petrochemical ex-factory price and market price;

Fourth, the daily 6:30 am or so release of crude oil text message and the market offer;

Fourth, daily 6:30 am or so release of crude oil text message and the daily 6:30 am or so release of crude oil text message and the market offer;

The daily 6:30 am or so release of petrochemical ex-factory price and the market offer.

To the R & D Department of more than half a year since the main projects:

First, mold network front page and the administrator backstage page production;

Second, the Southwest network front page production and adjustment of the block;

three, modified two front page and m net front page design;

four, in the plastic library page production;

five, the main network store and some other maintenance;

R & D probationary period summary of the work of the 3

time such as a white horse crossing the gap, I came to BYD has been three months, the probationary period has been close to the end of the thanks to the sixteen brake factory can give me to show their talents, to realize their own value of the opportunity. I am grateful to the 16th brake factory for giving me the opportunity to show my talent and realize my own value. In just three months, I have a deeper understanding of BYD, and a deeper understanding of the company's culture and strategic goals: BYD advocates "factory as home, love factory as home" "home culture", BYD Automobile's pursuit of the "two first" goal, etc. BYD Automobile's "two first" goal. The "family culture" advocated by BYD, the "two firsts" goal pursued by BYD Auto, etc. y touched me, and I am proud to be a member of BYD. I believe that through the unremitting efforts of BYD people, we can make the national independent brand bigger and stronger. Three months after entering the company, in the brake factory leadership guidance and colleagues enthusiastic help, through their own unremitting efforts, in all aspects have made some progress, now my work is reported as follows:

First, the company's awareness of the BYD well-known domestic independent national brand, now has three major IT, automotive, and new energy industry is a collection of research, development, production, F3F0 and other models in the domestic sales of record-high, open up foreign production bases and international sales channels, "741 project" the continuous implementation of the automotive field is to "two goals" speeding forward.

The automobile industry is moving rapidly towards the "two goals".

Second, the work of the achievements of my preparation in the sixteen division brake plant product development department, mainly responsible for the design and development of brake products, production processes, quality control, etc., during the period of work to complete the state is as follows:

1, participated in the design of the F6 products of the tooling fixtures and improve the design process of the system documents

2, participate in the F6 front bracket and the tooling suppliers of the ** diamond and Sandvik, etc., ** diamond, etc. F6 front bracket and clamp body processing tool suppliers to confirm and improve the process

3, F6 production process process card production

4, with the brake 2 team members to improve the design of fixtures for other models of products at present, all models of the brake project is in full swing, the e6 for the trial stage, the end of the year trial processing of the F6 part of the product, the 5a product at the beginning of next year, the plan of the brake project in full swing, e6 for the trial stage, the end of the year trial processing of the F6 part of the product, the beginning of next year The beginning of next year's 5a products, the planned c6 brake, and more models in the future

Third, there are problems and ways to improve them due to the original company engaged in the production process and quality management of motorcycle engines, not involved in the automotive brake system, the specific structural principles of the brake is not very clear, I will be in the future work more to the seniors to ask for advice, the shortest possible time to familiarize with the company's business and processes. I'm not sure if I'll be able to do that.

Although only three months, but for me to benefit greatly. In the face of the increasingly rapid development of the 21st century, I, like all BYD people, will continue to forge ahead, continue to strive for innovation, the constant pursuit of excellence, and unremitting efforts to open up the future!

R & D probationary period work summary 4

Light and shade, years and months like a shuttle, in the blink of an eye the first half of 20xx year is going to pass. In this half year. I do the main work are:

The first phase of the innovation project hard experiments

After New Year's Day busy training, and training final exam, to lay the theoretical foundation for future work.

Before the Spring Festival to seize the time to pull the crystal of a furnace, engage in experiments, pull six inches of single-crystal furnace to do samples at great risk of experimenting with Lianyungang material three furnaces, achieved great results, and the compound pull can pull a whole single crystal during the holidays rotating on duty for three days and nights: thirty days and nights of the New Year's day and night, the first five days and nights, 24 days and nights of the first day and night of the seventh of the first month of the year began to install the 22 village heat field, and began commissioning the 90 furnaces, 120 kilograms of feed, pull eight inches of single-crystal! Successfully cooperate with the equipment company debugging the company's own control cabinet success, and set up the parameters of the pull crystal effective, smooth pull into the whole root of the single crystal multi-furnace 80 furnace modification 20 inch hot field, the production of 8 stock single crystal success.

90 furnace also converted into a 20-inch hot field for comparison, especially the comparison of power consumption, the success of the second phase of management and theoretical analysis of the summary of the day shift from March 28, I first of all, the workshop of the situation of each class a full and thorough understanding of the better production to lay the foundation.

1, coordinating the work of each class pulling the crystal, so that production goes smoothly, production and yield has improved significantly

2, seriously do a good job of the test, analyze the crystallization of several hot field situation and power consumption, accounting for the cost of single crystals

3, to re-establish the duty list of each class, will be subdivided into the health area, and to do the shift changeover when the day of the two inspections. Found unqualified items in a timely manner to check and point out, cleaning in a timely manner

4, with the low-oxygen high life experiments, and actively think of ways to come up with ideas, and experiments in the crystal pulling furnace, and achieved certain results

5, timely query of the oxygen head, oxygen tail, the life of the head, the life of the end of the diameter of the coarse, the diameter of the fine and other data. Timely list published. Feedback production and guide production.

6, in a timely manner to do a good job of pulling the crystal of the statistics of the data, down to the workshop and reported to the director. Cooperate with the director of the work

Mainly including the success rate of clearing and loading, the success rate of the lead put, the first time to put the shoulder bad, twice in a row to put the shoulder bad, the diameter of the thick and thin and so on, and statistics to the class, statistics to the person, the responsibility of people, and timely communication with the staff responsible for the avoidance of similar situations occur again.

Do a good job of the statistics of the test data, including the number of times the lead put, the number of crystal crucible rotation, argon flow, the improvement of special technology, and supervise the implementation of the experimental program and the experimental records of the completeness and authenticity.

The test data and 20xx June, July, August, September, October to compare and analyze, to see the length of the isometric cycle. Comparison of the decline in oxygen content, compared with the improvement of life. Through the comparison of different crystal pulling conditions, the best program.

Although the overall experimental results did not reach the expected goal, but there has been obvious progress, significant improvement. I believe that in the near future. Under the leadership of Director Yan will certainly make greater progress, achieve greater results, bring greater smiles to the company

The third phase of the R & D center equipment demolition and relocation within ten days, as scheduled to complete the demolition and relocation of equipment, I am mainly responsible for the original R & D center related to the handling of the legacy issues, I dismantled all the wiring of the five control cabinets, and organizing all the foot screws of the five stoves wrapped up and put the magnetic field I dismantled all the wiring of the five control cabinets and organized and wrapped all the ground screws of the five furnaces, put the magnetic field of the oil and unloaded the oil pipe 3 one by one, organized and classified and moved all the items on the second and third floors

Every day when you go to work you are responsible for taking out the tools, and when you get off work, you are responsible for collecting the tools to close the doors and windows. The company's main goal is to provide the best possible service to its customers. On duty while working, at the same time at any time to others to find tools and other items

In short: for the R & D center I am willing to pay everything! I believe that my future work will bring new joy to the leadership.

R & D probationary period summary 5

Time as a white horse, two months of probationary period is coming to an end, in the colleagues of the care and guidance, coupled with their own unremitting efforts, all aspects of the progress has been made, is now the probationary period summary of the work of the report as follows:

A, the relevant theoretical knowledge of the study

1. Understand the company profile, organizational structure and overall operation, familiar with the company's corporate culture, learning and compliance

abide by the company's rules and regulations; understanding of the production department, technical department, marketing department of the various functions and the relationship between each other, and can communicate and coordinate with the relevant functional departments, good cooperation.

2. Familiar with the use and maintenance of various laboratory instruments and equipment

3. Familiar with a variety of washing and disinfection products in this sector, including the scope of use of the product, the use of the method and precautions,

the main technical indicators and their test methods; familiar with the department of a variety of existing physical and chemical rapid test kits and colorimetry products product characteristics, the scope of use and the method of use.

4. Learning "disinfection technical specifications" 20xx version of the disinfection products, effective content determination test, shelf-life test,

metal corrosion test, suspension quantitative sterilization test, carrier quantitative sterilization test, simulation of the field test, field test of the operation process, and in the colleague to know the application of practice, and can be requested to design and carry out part of the disinfection products, effective content determination test, suspension quantitative sterilization test. The test is a test to determine the effective content of some disinfectant products, a quantitative sterilization test of suspensions, and a quantitative sterilization test of carriers.

Second, physical and chemical experiments

1. Learning the calibration method of the nitrite colorimeter, and assisting the R & D staff to carry out the calibration of the nitrite colorimeter.

2. Assist R & D personnel to carry out chlorine dioxide stability test (shelf-life experiments), mainly for different time to stay

of the various samples of chlorine dioxide disinfectant active ingredient determination and ph detection, and then observe the stability of chlorine dioxide.

3. Assist R & D staff to conduct metal corrosion experiments, learn metal corrosion experimental methods test, assist the operation of the basic process, and make relevant test records.

4. Learning to use the five iodine measurement method to determine the content of chlorine dioxide principles and methods.

5. Assist the quality control personnel to carry out the quality control of the products in the department.

Third, microbiological experiments

1. Familiar with the basic operation of disinfection and sterilization experiments, including media preparation, autoclave use, strain transfer, bacterial dilution, pouring plate, microbial cultivation, and to do a good job of preparing for the test.

2. Assist the R&D staff to carry out the disinfectant minimum inhibitory concentration determination experiment, the first disinfectant-related experiment, colleagues patiently told me about some disinfectant experiment basic operation and precautions, combined with the theoretical knowledge, the elimination of experiments have a basic understanding.

3. Assist the technical support staff to carry out chlorine dioxide on Clostridium perfringens killing test (twice). According to the design of the quality control personnel, to assist technical support staff to carry out the mineral water bacterial colony total and mold colony total determination.

4. Chlorine dioxide and peroxyacetic acid on the water bacteria (water plant to get back bacteria) killing experiment. Assist the technical support staff to pass o3 sterilization and not pass o3 mineral water bacteria and mold count. The results showed that two of them were positive without o3 and two of them were negative without o3. Mineral water with o3 was negative.

9. Chlorine dioxide and peracetic acid on lychee bacteria and mold killing test (twice).

Four, summary

In the ring Kai work practice in two months, I realize that their lack of experience and lack of professional theoretical knowledge, for these shortcomings, I will not retreat, in the days to come I will be more efforts, open-minded colleagues and leaders to learn, and strive for more experiments, enrich themselves, and strive to do the best.

R & D probationary period work summary 6

20xx, under the guidance of the company's leadership, we focus on the company's business objectives and work tasks, to overcome the unfavorable factors of fewer personnel, thin base, and actively carry out all the work. Completed work is mainly drawings digitization, with new people, new plant process equipment stereotypes and other three parts, the specific content is as follows:

1, the first half of the year 20xx, based on the plant equipment drawings of the old, mutilated and incomplete, more errors, find the difficulties and other reasons, my department of the old equipment drawings for review, improve, digitize. The digitization of drawings is conducive to the reduction of drawing errors, access, preservation, modification and innovation. In the first half of the year, our department has completed the digitization of 3-1 overturning machine drawings (210 drawings in total), 6-17 cage drawings digitized (115 drawings in total), ts0301-301-04 blocker drawings digitized (96 drawings in total), 1-17 cage drawings digitized (115 drawings in total), 1-301-04 blocker drawings digitized (96 drawings in total), 1-301-04 blocker drawings digitized (96 drawings in total). Drawings), 1-23 digitization of drawings of fixed overhead cranes (total 21 drawings), 2-9 digitization of drawings of catchers (total 92 drawings) 3-3 digitization of tippers, 16-4 digitization of drawings of forward tilting gangway racks, k3 / k4 Digitization of drawings of coal feeder, 3-8 high level tipper and other drawings. Now each department needs the above production drawings, directly to the digitized drawings, eliminating the need to find in the many old drawings need drawings 'time, but also reduces the drawings in the circulation process due to data changes caused by the error. Drawings digitized in the process of the old drawings found in a number of places of the error, but also found not in line with the current production of the place, after discussion with the departments of research, these old drawings do not meet the current production of the place to improve.

2, 20xx year the second half of my department comrade Li Wei was seconded to the west plant work. To assist the west plant quality control, technical departments such as drawing digitization work, accessories drawing and other technical work. For the smooth progress of the production work of the west plant has played a positive role.

3, 20xx year the second half of my department also led the new plant equipment layout and process planning. Mainly includes the new plant new equipment stereotypes, technical certification, new plant equipment layout design, new and old plant equipment installation in place and other work. Promote the construction speed of the new plant, for the new plant into production quickly played a positive role.

4, 20xx year-end, iso9000 certification review work in my plant, my department staff to prepare a lot of work materials, and actively coordinate with various departments to meet the certification work, with the certification teacher to carry out the inspection of the enterprise guidance and other work, and successfully passed the iso9000 certification review. Through this iso9000 certification review work, found the shortcomings and shortcomings of my factory, and strive to improve in the next year, the implementation of the factory system, in order to comply with iso9001-20xx quality management content, so that the company into the formalization.

20xx annual work objectives plan:

1, because the department for the first time for iso9000 certification work, many places still exist unfamiliar. We are ready in the next year, between the departments to implement and implement the specific content and provisions of iso9000, in strict accordance with iso9000 quality management system regulations. Next year, the information required for the audit is prepared in advance to improve the documents need to continue to handle in advance, and actively cooperate with the next audit to meet the work. Supervise the work of the enterprise quality management system, effective organization and coordination of various departments, do a good job of quality management system audit and certification.

2, the use of the new plant roof, and Linuo solar energy cooperation, to take the combination of photovoltaic and roof construction of photovoltaic power station to the enterprise production and other power supply, in order to alleviate the situation of the peak of the tension of electricity. The project can generate an average of 720,000kwh of electricity per year after completion of production, saving about 200 tons of standard coal and reducing carbon dioxide emissions by about 500 tons per year, which is environmentally friendly and energy-saving

beneficial.

3, actively involved in the design and development of new products, supervise the completion of new products progress, to ensure the completion of the new product development program (recommended to visit this site:) planning. Preparation of the company's technology development in the medium and long term planning, development research and design of new products for the enterprise to provide leapfrog development of products. Strengthen external technical exchanges, collect information about new products, new technologies, new techniques, new equipment and other technical information for the leadership reference decision-making.

In short, this year, we have gained and lost, there are bitter and sweet, but no matter what the achievements or lessons learned, will be our department's valuable experience. A new year means a new starting point, new opportunities, new challenges. All the members of our department are determined to make persistent efforts to make the work better.

R & D probationary period summary 7

Time as a white horse, two months of probationary period is coming to an end, in the colleagues of the care and guidance, coupled with their own unremitting efforts, all aspects of the progress has been made, is now the probationary period summary of the work of the following report:

First, the relevant theoretical knowledge of the study

1, Understanding of the company's profile, organizational structure and overall operation, familiar with the company's corporate culture, learning and compliance with the company's rules and regulations; understanding of the plant production, technology, marketing department of the various functions and the relationship between each other, and can communicate and coordinate with the relevant functional departments, good cooperation.

2, familiar with the use and maintenance of a variety of laboratory equipment

3, familiar with the department of a variety of washing and disinfection products, including the scope of use of the product, the use of methods and precautions, the main technical indicators and their test methods; familiar with the department of the existing variety of physical and chemical rapid test kits and colorimetry products, product characteristics, the scope of use and use of methods.

4, study the "disinfection specifications" 20xx version of the disinfection products, effective content determination test, shelf-life test, metal corrosion test, suspension quantitative sterilization test, carrier quantitative sterilization test, simulation of field test, field test of the operation process, and in the colleague to know the application of practice, and can be required to design and carry out some of the disinfection products, effective content determination test, suspension quantitative sterilization test, carrier quantitative sterilization test, and can also design and carry out some disinfection products. Quantitative sterilization test, carrier quantitative sterilization test.

Second, physical and chemical experiments

1, learn the calibration method of the nitrite colorimeter, and assist the R & D staff to carry out the calibration of the nitrite colorimeter.

2, to assist research and development personnel to carry out chlorine dioxide stability test (shelf-life experiments), mainly for different time to stay in a variety of samples of chlorine dioxide disinfectant active ingredient determination and ph detection, and then observe the stability of chlorine dioxide.

3, to assist R & D personnel to carry out metal corrosion experiments, learning metal corrosion experimental methods test, to assist in the operation of the basic process, and make relevant test records.

4, learning to use the five iodine quantity method to determine the content of chlorine dioxide principle and method.

5, to assist the quality inspection staff to carry out the quality inspection of the department's products.

Three, microbiological experiments

1, familiar with the basic operation of disinfection and sterilization experiments, including media preparation, autoclave use, strain transfer, bacterial dilution, pouring plate, microbial cultivation, and to do a good job of work before the test preparation.

2, to assist the R & D staff to carry out disinfectant minimum inhibitory concentration determination experiment, the first disinfectant-related experiments, colleagues patiently told me some disinfectant experiments on the basic operation and precautions, combined with the theoretical knowledge of the elimination of experiments have a basic understanding.

3, to assist the technical support staff to carry out chlorine dioxide on Clostridium perfringens killing test (twice). According to the design of the quality inspection personnel to assist technical support staff to carry out mineral water bacterial colony total and mold colony total determination.

4, chlorine dioxide and peroxyacetic acid on the water bacteria (water plant to get back bacteria) killing experiment. Assist technical support staff to pass o3 sterilization and did not pass o3 mineral water bacteria and mold count. The results showed that two of them were positive without o3 and two of them were negative without o3. Mineral water with o3 was negative.

9, chlorine dioxide and peroxyacetic acid on lychee bacteria and mold killing test (twice).

Fourth, the summary

In the ring Kai work practice in two months, I realize that their lack of experience and lack of professional theoretical knowledge, for these shortcomings, I will not retreat, in the days to come I will be more efforts, open-minded to colleagues and leaders to learn, and strive to do more experiments, enrich themselves, and strive to do the best.