Hardware facilities of Lijiang Sanyi International Airport

The apron: The airport has an apron area of 40,000 square meters. There are 19 parking spaces, of which 15 are for C-type aircraft and 4 are for D-type aircraft. The airport has a domestic terminal building of 33,000 square meters and an international terminal building of 5,300 square meters.

Baggage handling system: It consists of departure system, arrival system***5 conveyor belts, and 1 pick-up carousel. The total length of the conveyor belt is 200 meters.

Flight display system: according to the flights of the day in a timely manner to the passengers to release the arrival and departure of each flight information.

Broadcasting system: it can complete the partition call to the passengers, background music and so on. The system is networked with the fire alarm system of the terminal building, which can automatically make emergency broadcasts according to the area where the fire occurs and guide passengers to evacuate.

The ATC building and tower: the ATC building has a total area of square meters. The ATC tower has a floor area of square meters and a total height of meters.

Meteorological security system: 1. automatic observation system a set. 2. 711B conventional weather radar a, can detect 300 kilometers within the range of clouds, precipitation, thunderstorms, hail and typhoons and other meteorological targets. 3. geostationary meteorological satellite data processing systems. It mainly provides infrared, visible raw projection and ground and high altitude weather data and objective analysis. 4. Automatic map filling system.

Fire-fighting equipment and facilities to ensure the ability to: airport fire department, can ensure that the airport fire alarm, rescue, extinguish fires. The airport has a fire pool, 200 fire hydrants, advanced fire fighting equipment, complete fire fighting equipment, has four fire fighting vehicles, including an imported Jaguar fire truck.

Lijiang Sanyi Airport terminal building construction area of 7900 square meters, the peak hourly handling capacity of 1800 people. The terminal building main body of one floor, local two floors, passengers in and out of the port diversion: set up a domestic outbound passenger processing hall, waiting room, welcome to the living room. At present, there are three boarding bridges in the building; there are four domestic passenger check-in counters. The building management system to be constructed carries out the whole process of monitoring and automatic control on the systems of electromechanical, air-conditioning, waterway, electrical, baggage transportation, escalator, boarding bridge, fire-fighting facilities, lighting, etc. of the terminal building and the auxiliary area, so as to keep them in the best working condition.