What are the emergency plans for the construction site?

1, comprehensive emergency response plan

From the general exposition of the accident emergency policy, policy, emergency organizational structure and related emergency duties, emergency response, measures and guarantees and other basic requirements and procedures, is to deal with various types of accidents comprehensive documents.

2, special emergency plan

Aiming at the specific accident category of hazardous sources and emergency security and the development of plans or programs, is a part of the comprehensive emergency plan, should be developed in accordance with the procedures and requirements of the emergency plan organization, and as an annex to the comprehensive emergency plan. Specialized emergency plan should develop clear rescue procedures and specific emergency rescue measures.

3, on-site disposal program

For specific installations, places or facilities, positions developed by the emergency disposal measures. Site disposal program should be specific, simple, targeted. On-site disposal program should be based on risk assessment and hazardous control measures prepared one by one, so that the accident-related personnel should be aware of should know, master, and through emergency drills, to achieve rapid response, correct disposal.

Expanded Information:

.

Construction site management elements

1, safety management

Mainly about fire prevention, prohibit indiscriminate wiring, wearing helmets, scaffolding, safety belts, and other corresponding construction safety issues, need to set up a special safety team to grasp the day-to-day, every day to talk about the training of more learning and prevention of problems before they occur.

Construction project site management is a systematic project, involving all levels of corporate management and construction site of each operation of the workers, coupled with the long production cycle of construction products, external influences and other characteristics of the decision of the site management is more difficult.

2, materials management

Projects before the start of construction, to the enterprise materials department to put forward a one-time plan, as the supply of materials based on preparation. In the construction, according to the project's construction material consumption quota and engineering changes and adjustments to the construction budget, timely to the construction enterprise materials department to adjust the material supply plan, so as to ensure that the material supply according to the actual demand.

3, quality management

Engineering quality inspection is generally used on-site production workers self-inspection, mutual inspection and full-time inspectors combined, based on national or departmental methods of engineering construction acceptance and acceptance specifications, engineering construction technical specifications, engineering quality inspection and evaluation standards.