Environmental protection engineer work summary

Introduction: the trivial and heavy work of engineers, from the design of the program to the completion and acceptance, each link can not slack. Below I would like to introduce you to the environmental protection engineer work summary article, just for reference!

The environmental protection engineer work summary article a

Sun and moon like a shuttle, time like a shooting star fleeting. Step into the design institute engaged in design work has been more than a year. In this more than a year of work, I have experienced, just set foot on the workplace of the kind of freshness; and feel the designer's hard work and labor. In the first half of the year, I try to adapt to the new working environment; the second half of my work focus is to develop their own good study habits and serious and practical learning attitude, for the first time Assistant Engineer and make unremitting efforts.

As a "double new" designers, both new to work, but also coincided with the recent reform of the hospital, just out of school and into the design institute, although the environment has changed greatly, but still learning-oriented. In this short year, I am both excited and thrilled. Under the enthusiastic support and help of the leaders and old bosses, I seriously do a good job of design work, and actively complete the tasks assigned by the Institute. I have a lot of thoughts and feelings about their own business and design work, now more than a year's work to make a brief report:

First, the political and ideological aspects:

In the design work of more than a year, I y appreciate the engineer's work of the trivial and heavy, from the design of the program to the completion of the acceptance of each link can not be slack. In the design process, I continue to learn and reflect, progress in learning, growth in reflection, so that I can become a good engineer in the future someday. Design purpose is clear, the attitude is correct, study the business, diligent and hardworking. Passionate about their own careers, group of colleagues, humbly seeking advice, abide by labor discipline. Participated in the Wenchuan earthquake relief donations to promote the spirit of collectivism of the whole hospital staff. Strengthen the cultivation and improvement of their own quality, starting from themselves. The special nature of the profession of engineers determines the inevitability of our people-oriented, safety first.

Second, the business ability:

work gap through the talk with several old engineers and communication, in a relatively short period of time on the architectural design and structure of the design of the initial understanding, and secondly, in the leadership of the old master of the new version of the norms of the eight years of study at the same time also for us to design the method of guidance and security awareness of the psychological counseling for a number of fresh graduates due to the design of only accessory type of building and the self-sustainability of the design of the building, the design of the building is not only the design of the building. The psychological guidance for some fresh graduates, who can only design the affiliated buildings and have low self-esteem, worry, disappointment and other psychological guidance, inspired our self-confidence, cultivated our enthusiasm and initiative in design.

I was y touched: the director inspired my sense of ownership, and gradually cultivated my ability to boldly take responsibility for the project, so that our group of freshly graduated students to enhance the sense of responsibility for the work of the Institute and take the initiative to participate in the management of the awareness of the formation of a group, willing to work, work responsible design team, led to the members of the Institute of the **** with the progress. In addition, the director also taught us, in the process of negotiation with the A party to "words must be done, action must be fruitful", people-oriented, integrity first.

In eight years, the new version of the norms under the tide of reform, I and all the engineers together into the new version of the norms of the wave of learning. Since the implementation of the new specification, the old masters in the process of reviewing the drawings, and actively cultivate our ability to independent learning, the spirit of scientific inquiry, no longer the design specification filler taught to us, but let us through independent inquiry way to raise questions, analyze the problem, find out the problem, solve the problem, to come up with the theory, validation of the theory, application of the theory of problem solving. Focusing on the process of cultivation in the review of drawings and the total number of points, it has improved our interest in learning and cultivated our creative spirit. Serious design, humble and seek advice. As a young designer, in order to improve their own design level, I insist on often looking at the building specifications atlas, often from the Internet to find some excellent architectural design drawings to study. Usually, I seriously and humbly consult experienced bosses to learn from their experience and the kind of serious and responsible attitude towards the project, and constantly improve my own design level and understand the design art. Lu Xun said: "There are a thousand Hamlets in a thousand readers." I have to say, a thousand designers, there will be a thousand design styles, each style, has its unique and charismatic 'glittering side, and I would like to be a hard-working bee, can learn from the best, and strive to design excellent works! Third, the work performance:

In Jingzhou Jingzhou Architectural Design Institute works:

Jingzhou City Inspection Center facade renovation program, Qu Yuan Road and South Ring Road facade renovation program, Jingzhou City Senmao Forestry Limited office building program, Jingzhou City detachment of the Armed Forces City Squadron Facade Renovation Program, Chen Kun private house program, Jingzhou City Leprosy Hospital medical office building building architecture, Jingzhou City Tobacco Monopoly Bureau cafeteria building structure, Jingzhou City Genesis Transgenic Technology Co., Ltd. gate gatehouse building structure, Jingzhou City Genesis Transgenic Technology Co., Ltd. office building, Jingzhou City Genesis Transgenic Technology Co., Ltd. distribution room building structure, Jingzhou City Highway Hotel elevator renovation building structure, Hou Zuoming private house program, Jingjian garage building, Liu Qingde private house program, Jingzhou City Funeral Hall gate plaque building structure, Jingzhou City, Taihu Lake private building, Jingzhou City, Yingnan Village relocation of residents in small areas of private housing program, Zhang Liuzhu private housing program ......

In Xiangfan City, the second architectural design institute's works:

Longzhong Management Committee, two bridges (vehicular bridges, pedestrian bridges) architectural structure of the Temple of Guangde, Xiangfan Children's Welfare Institute planning program (modified part) ), Xiangfan first people's hospital old inpatient surgical department building renovation program (structure reinforcement construction plan, water pump room building structure), Zaoyang wu store erlang industrial park (clean up grinding workshop, material warehouse, finished product warehouse, casting workshop) building construction plan and gate enclosure attached building structure, xiangcheng district victory street, the fourth bureau of China railway residential community planning program, xiangfan wanzhou electric group limited company office office building program (revised part), Xiangfan Children's Welfare Institute (rehabilitation building, office building, teaching building, infant dormitory, children's dormitory) structure construction plan, Xiangfan City Light Industry Association staff building structure, Xiangfan City Taipingdian Finance Comprehensive Building structure part, Xiangfan City New Street commercial and residential building building program part, Xiangfan College Academic Exchange Center Longzhong Hotel gate building structure, Xiangfan City Jiufeng real estate high-rise residential and commercial building building program part, Xiangfan City Munda Decoration company business building construction program part of ......

This year in the leadership and colleagues care and guidance, through my own learning and study, the theoretical knowledge learned from books against the actual work, with theoretical knowledge to deepen the understanding of the actual work, with the actual verification of the theoretical knowledge learned, and strive to rapidly accumulate design experience, so that I can more Rapid accumulation of design experience, so that they are faster and better integrated into the work.

Fourth, the direction of future efforts:

① Improve their own design level, listen more, think more, do more, more exchanges, and work harder.

② often learn from the old engineers, can learn more knowledge in the master, to be able to stand alone;

③ often look at the specification of the atlas, in practice, constantly enrich their own experience and skills.

④ Improve your design quality and professional ethics.

⑤ Actively prepare for the examination: registered construction engineers, second level registered construction engineers, first level construction engineers, registered cost engineers, registered supervision engineers, focusing on the first three.

In the future, I will further strengthen the technical learning, solid work, give full play to personal strengths, and make more contributions to the hospital. Design experience is a little by little accumulation. Progress a little bit every day, is a process of continuous improvement. There is no best, only better. If you want to go faster, you can't go faster. You must make step-by-step progress and continuous improvement.

Design work, is a constant new, never-ending work. A spring, a fall, let me put a will to design the heart of the wish for the cause of the construction of a fire, the most precious love of their own dedication to the design of the building structure, I believe that today I have a bud in my heart, tomorrow will be able to bloom gorgeous flowers.

This year, is my rapid growth with sweat for a full year. But this is just a beginning, "the road is long and far away, I will go up and down to seek".

Environmental protection engineer work summary of the second

I came to the production office on November 30, 20XX to work, fixed post environmental protection engineer. Four months, I started from the production process, equipment, site, safety and environmental aspects of the five, learning and understanding of the management functions of the Production Division, and gradually realized the transition from production learning to environmental management, and from the operation of the post to the change of mind of the manager. Now the environmental work is summarized as follows:

I. Environmental protection facilities management system continues to improve and maintain

The company's environmental protection equipment for the monthly inspection, in the original environmental protection equipment management system to organize the basis of the addition of environmental protection equipment operating parameters and processing effect evaluation of the two inspections, further reflecting the operation of environmental protection equipment. Completed the sintering plant white ash rotary kiln dust removal equipment file establishment and archiving, the addition of dust point records and dust production point records two, for the future maintenance of environmental protection facilities to provide accurate support.

II. Online monitoring facilities maintenance work into the right track

20XX so far, pollution sources online monitoring has been the national, provincial and municipal environmental protection departments as the key work of environmental protection engineers work summary 20XX environmental protection engineers work summary 20XX. from the fine control and normal operation of the two aspects of the establishment of online monitoring equipment daily maintenance management accounts, daily record of the online facilities operation for the problems and malfunctions appear frequently in the FGDs. Problems and failures appear frequently in the flue gas online monitoring system for the exit of the desulfurization system, had many times and manufacturers and staff managers to contact, in-depth study of the way the equipment operates, carefully study the principle of the instrument calibration gas, for the desulfurization facilities start and stop and lead to the data drift of the situation for a number of tracking and analysis, summarize the approach to deal with the March to ensure that the export of the concentration of SO2, desulfurization efficiency, and other data reliability of more than 85% to Meet the national requirements. Quarterly with the city environmental protection bureau staff on the online equipment for comparison monitoring, to ensure the accuracy of online equipment measurement.

III. Participate in environmental protection annual, quarterly and monthly reports

Through the company's comprehensive utilization of pollutants, pollutants discharged and environmental protection facilities synchronous operation rate of the survey, for environmental protection annual, monthly and quarterly reports to fill in the data support.

IV. Participate in the sewage declaration work to fill in the 20XX annual sewage declaration statistical table, for the leadership to provide comparative data

V. Cooperate with the environmental protection department work in a timely manner to submit environmental protection information required by the environmental protection department.

VI. Environmental protection file set up to re-establish the environmental protection file catalog and to achieve the update at any time.

VII. Daily environmental management work to find the company's environmental protection work problems, put forward corrective measures and tracking supervision.

In the original work to summarize and organize at the same time, I have sorted out the direction of the next step

1. Consolidate the management of environmental protection facilities and online management, improve the environmental protection equipment operation rate and processing effect, standardize the operation of environmental protection positions, records and behavior of employees;

2. To recycling ideas as a guide to increase the recycling rate of pollutants to reduce emissions;

2. Emissions;

3. Strengthen the study and research of pollutant generation process, to make up for the lack of ability to fill out environmental statements;

4. Grasp the opportunity of the April "sewage license" replacement, fully familiar with the "sewage license" replacement process, share the leadership of the workload;

5. Improve the management of online monitoring of pollution sources to ensure that the indicators to meet the national requirements.

End of report.