Infrastructure Planning

8. 4. 1 Management Office and Station Planning

8. 4. 1. 1 Management Office Planning

( 1) Office Building. Protected area management bureau is located in Bulaotun town forestry station, close to the town government, with convenient transportation, water, electricity, communications and other infrastructure conditions. Planning to build a new office building, construction area of 1,000 square meters, 2-storey, brick structure, with office, reception, library reading and staff activities room. And equipped with office equipment and furniture.

( 2) Treasury. Mainly garage, fire-fighting equipment warehouse and apparatus warehouse, total construction area of 300 square meters, brick structure.

( 3) Staff dormitory and fire fighting team barracks. Mainly to solve the fire fighting team in the fire season and centralized training of the residential problem, as well as the bureau in the organization of the single staff accommodation problem. Building area of 1200 square meters, brick structure.

( 4) ecological public **** toilet. After the establishment of the protected area, the management office resident BuLaoTun become the protected area science and technology and information exchange center, the flow of people increased. In addition to indoor toilets inside the building, the outdoor should establish a high standard, ecological public **** toilet. Planning construction area of 50 square meters, brick structure.

8. 4. 1. 2 Protection Station Planning

Planning to build 3 new protection management stations, the area under the jurisdiction of the protected area covers most of the protected area. In addition to the construction of management rooms, it is also necessary to repair the fence wall 180 meters, using "24" clear water brick wall or iron fence with hedges. Zhongmen Temple protection management station needs to build 150 meters of walls, using "24" clear water brick wall or iron fence with hedges.

8. 4. 1. 3 Planning of Ecological Monitoring Stations

Three ecological monitoring stations are planned to be constructed in the protected area, which are located in Nanshuiyu of Gushiyu, Mizhuangzi of Bianzhuangzi, and Shengshui Mountain of Xueyi Factory. Constructed with clear water brick wall.

8. 4. 2 Transportation Planning

( 1) External connecting road improvement. At present, the external transportation road network of the protected area, as well as the transportation road network between the management office site BuLaoTun and the protection management station is basically formed, which is more convenient. However, the mountain paths in the reserve, also known as fire roads, still need to be renovated, with a total length of about 15 kilometers.

( 2) Half City Reservoir - Shi Zhuangzi road construction. Because of the protected area half city reservoir to ShiZhuangZi section is still gravel road, not conducive to forest fire prevention and carry out eco-tourism. Planning to expand the road from Half City Reservoir to Gushiyu, according to the forest level 3 road construction standards, roadbed width 6.5 meters, road width 3.75 meters, gravel road surface, total length of 10.5 kilometers.

( 3) Parking lot construction. In the Authority site, the construction of a parking lot, an area of 2,000 square meters, not only to meet the parking needs of foreign vehicles, but also the formation of hardened plaza, providing outdoor activities for workers.

In addition, in order to ensure the normal development of protection work and daily reception work, the new life supply car 3, patrol and fire command car 3.

8. 4. 3 Power Supply and Communication Planning

8. 4. 3. 1 Power Supply

( 1) Management Office. According to the calculation of the electricity load of the office building, scientific and technological experiment building, staff dormitory and fire-fighting team barracks and other buildings in the protected area, the electricity load of the protected area will reach 1,000 kilovolt-amperes. Therefore, it is planned to build a new power distribution room with a building area of 70 square meters and brick structure. At the same time, 1 set of transformer equipment with a capacity of 1000kVA will be equipped, 1500 meters of high-voltage transmission line and 500 meters of low-voltage power supply line will be set up to ensure the electricity consumption of the management office. In addition, in order to prevent temporary power outages affecting the normal protection, forest fire prevention, scientific research, office work, etc., planning to configure a 50kW diesel generator.

( 2) Protection management station. In the semi-city sub-protection management station set up 200 meters of high-voltage transmission lines, low-voltage power supply line 100 meters; build a power distribution room, an area of 30 square meters.

8. 4. 3. 2 Communication

Yunfeng Mountain Nature Reserve communication links are extremely smooth, program-controlled telephone lines have been connected to the management office and the protection of the management station near the installation of program-controlled telephone is extremely convenient. In order to improve the communication effect of the protected area management work and forest protection and fire prevention, taking into account the actual situation of the protected area, it is proposed to use the combination of program-controlled telephone, cell phone and walkie-talkie. Planning in the management office building equipped with capacity 100 doors of program-controlled switchboard 1, in the protected area forest fire command center and fire lookout equipped with cell phones 5, satellite phone 2, walkie-talkie 12, in the ancient stone valley protection management station equipped with fixed telephone 3, cell phone 3, walkie-talkie 4, in the side of the Zhuangzi protection management station is equipped with fixed telephone 2, cell phone 2, walkie-talkie 4.

8. 4. 4 Water Supply and Drainage Planning

8. 4. 4. 4. 1 Water Supply

( 1) Protected Area Management Office: The water supply of the management office can rely on the existing water supply facilities of the forestry station of the town of Biluotun, and it is only necessary to lay a new water supply pipeline from the water reservoir to the management office of 500 m.

( 2) The water supply of the management office can rely on the existing water supply facilities of the forestry station of the town of Biluotun.

( 2) Protection management station: 3 protection management station water supply can use the original village water supply facilities, need to lay water supply pipeline 300 meters.

8. 4. 4. 4.2 Drainage

The main consideration is the treatment and discharge of domestic sewage, and the relatively large amount of domestic sewage discharged in the protected area is the three protection management station sites. The protection management stations will build sewage facilities, and the domestic sewage will be collected by concealed pipes and directly discharged to the municipal sewage system. Need to lay 500 meters of sewage pipeline.

8. 4. 4. 4. 3 Heating

( 1) Protection Management Office: preliminary calculations, after the completion of the management office of the protected area, various types of building area will reach about 2000 square meters, heating heat load is about 3. 3 × 105 kcal/h (heating heat consumption calculated at 60 kcal/square meter - hour). After comparison, taking into account the coal-fired boiler pollution is too large, gas boiler pollution is small, but the management office site is not connected to the specific situation of natural gas, the protected area of the heating equipment using electric boilers, both pollution-free, but also in line with the purpose of environmental protection. Planning in the management office site of a new boiler room, construction area of 100 square meters, frame structure, according to the heat load, equipped with a set of storage type electric boiler (recommended model L - WDR0.500), laying heating pipeline 600 meters.

( 2) protection management station: 3 protection management station building area are small, planning to use direct electric boiler heating, each with a new building area of 30 square meters of the boiler room, brick structure, the recommended boiler model L - WDR0. 042 (heating area of 500 ~ 1000 square meters), laying heating pipeline 240 meters.