Bidding requirements of supervision unit:
The qualification grade standards of engineering supervision enterprises are as follows:
(A) comprehensive qualification standards
1, with independent legal personality, and its assets comply with relevant state regulations.
2. The technical person in charge of the enterprise shall be a registered supervision engineer with 15 years of engineering construction experience or senior engineering technical title.
3, with more than 5 engineering categories of professional engineering supervision qualification.
4. There shall be no less than 60 registered supervision engineers, no less than 5 registered cost engineers, and no less than 15 registered builders, first-class registered architects, first-class registered structural engineers or other survey and design engineers.
5, the enterprise has a sound organizational structure and quality management system, a sound technology, archives and other management systems.
6, the enterprise has the necessary engineering test equipment.
7. There is no behavior prohibited by Article 16 of Regulations on Qualification Management of Engineering Supervision Enterprises [1] (DecreeNo. 16). The Ministry of Construction 158) applies for the qualification of project supervision within one year before the date.
8. There are no major quality accidents caused by the supervision responsibility of the enterprise within one year before the date of applying for the qualification of engineering supervision.
9. There is no major safety accident of engineering construction above Grade III or safety accident of engineering construction above Grade II within one year before the date of applying for the qualification of engineering supervision.
(2) Professional qualification standards
1, Grade A
(1) has an independent legal person qualification, and its assets comply with relevant state regulations.
(2) The technical person in charge of the enterprise shall be a registered supervision engineer with 15 years of engineering construction experience or senior engineering technical title.
(3) The total number of registered supervision engineers, registered cost engineers, first-class registered construction engineers, first-class registered architects, first-class registered structural engineers or other registered survey and design engineers shall not be less than 25; Among them, the number of registered supervision engineers in the corresponding specialty shall not be less than the number required in the List of Registered Supervision Engineers with Professional Qualifications (attached table 1), and the number of registered cost engineers shall not be less than 2.
(4) In the past two years, the enterprise has independently supervised more than three secondary engineering projects with corresponding majors, except for enterprises with Grade A design qualification or Grade I and above construction general contracting qualification applying for Grade A qualification of this professional engineering category.
(five) the enterprise has a sound organizational structure and quality management system, and a sound technology and file management system.
(6) The enterprise has necessary engineering test and testing equipment.
(seven) there is no behavior prohibited by the provisions of article sixteenth within one year before the date of applying for the qualification of project supervision.
(8) There are no major quality accidents caused by enterprise supervision responsibility within one year before the application for project supervision qualification.
(nine) no major safety accidents or two safety accidents of engineering construction above grade three occurred within one year before the date of applying for the qualification of engineering supervision.
2. Grade B
(1) has an independent legal person qualification, and its assets comply with relevant state regulations.
(2) The technical director of the enterprise shall be a registered supervision engineer with 10 years of engineering construction experience.
(3) The total number of registered supervision engineers, registered cost engineers, first-class registered builders, first-class registered architects, first-class registered structural engineers or other registered survey and design engineers shall not be less than 15. Among them, the number of registered supervision engineers in the corresponding specialty shall not be less than the number required in the List of Registered Supervision Engineers with Professional Qualifications (attached table 1), and the number of registered cost engineers shall not be less than 1.
(4) There is a relatively perfect organization and quality management system, and there are management systems such as technology and archives.
(5) Necessary engineering test and testing equipment.
(six) there is no behavior prohibited by Article sixteenth of these Provisions within one year before the date of applying for the qualification of project supervision.
(7) There are no major quality accidents caused by enterprise supervision responsibility within one year before the application for project supervision qualification.
(8) Within one year before the date of applying for the qualification of engineering supervision, there were no major engineering construction safety accidents above Grade III or two engineering construction safety accidents above Grade IV caused by the supervision responsibility of this enterprise.
3. level c
(1) has an independent legal person qualification, and its assets comply with relevant state regulations.
(2) The technical director of the enterprise should be a registered supervision engineer with more than 8 years of engineering construction experience.
(3) The number of registered supervision engineers in corresponding disciplines shall not be less than the number required in the List of Registered Supervision Engineers with Professional Qualifications (attached table 1).
(4) the necessary quality management system and rules and regulations.
(5) Necessary engineering test and testing equipment.
B. What scale of supervision project needs bidding?
The first tender announcement (applicable to pre-qualification) supervision bidding announcement of engineering construction.
The preliminary design of provincial (city, autonomous region) to highway project has been approved by (full name of examination and approval authority) to (document number), and the project construction unit is. This project has met the bidding conditions. Now, the project construction supervisor [[ 1]] is invited for public bidding. We sincerely invite qualified supervision units to participate in the bidding of this project. This project adopts the post-qualification review method.
1. Project overview and bidding scope
The total length of this tender highway project is kilometers, the technical standard is, and the estimated investment of the project is RMB.
Planned construction period of this project: MM DD YY to MM DD YY, and supervision service period is [[2]].
A first-class supervision organization is set up for this project. Set up the chief supervision engineer's office. The first chief supervision engineer's office consists of the resident supervision engineer's office, and the second chief supervision engineer's office consists of the resident supervision engineer's office. ...
The first supervision contract section is the supervision engineer's office, which is responsible for the construction supervision of the first construction contract section. The pile number is K+~ K+, and the length is km. The main contents of the project are as follows.
The second supervision contract section is the supervision engineer's office, which is responsible for the construction supervision of the first construction contract section. The pile number is K+~ K+, and the length is km. The main contents of the project are as follows.
……
2. Qualification requirements of bidders
Any supervision unit with professional level or above of highway engineering or special engineering supervision qualification certificate issued by the transportation department [[3]], business license of enterprise as a legal person issued by the administrative department for industry and commerce, and experience in engineering construction supervision may put forward to participate in the bidding.
The project was accepted by [[4]] consortium. The consortium bid shall meet the following requirements:
Bidders can participate in the bidding of the contract section of this project supervision.
An affiliated enterprise with investment and shareholding relationship, or a parent company with direct operation and management relationship, or a subsidiary of the same parent company, may not submit a bid application for the same bid section at the same time.
3. Acquisition of bidding documents
Interested bidders hold business license (photocopy), qualification certificate (photocopy), letter of introduction from the unit and the original ID card of the agent 1 copy, and a copy of the official seal of the unit 1 copy [[5]], from [[6]] to [[6]] (except legal public holidays and holidays) every day. The deposit for drawings is RMB [[8]], which will be refunded when the drawings are returned (without interest).
4. Submission of bid documents
The deadline for submission of bid documents is year, month and day. Please submit 65,438 original and 0 copies of bidding documents to (detailed address) before the deadline for bidding.
5. Publishing media
This tender announcement is also published on (name of the media that issued the announcement).
6. Contact information
Tenderee: (full name) Tendering agency: (full name)
Address: Address:
Postal code:
Email: Email:
Tel: Tel:
Fax: Fax:
Contact person: contact person:
Tenderee: (full name) (seal)
Date: Year Month Day
[[ 1]] The scope of construction in supervision bidding should be defined here, such as subgrade engineering, pavement engineering, bridge engineering, tunnel engineering, traffic engineering and facilities engineering along the line.
[[2]] The supervision service period includes construction preparation stage, construction stage, completion acceptance stage and defect liability stage.
[[3]] The tenderee shall put forward clear requirements for the qualification certificate level of the bidder according to the relevant regulations of the transportation department.
[[4]] The tenderer may not accept the consortium bid.
[[5]] All copies in the tender documents refer to color scanned copies or color copies.
[[6]] Pre-qualification documents and post-qualification bidding documents shall be sold for not less than 5 working days.
[[7]] The price of the tender documents shall be determined according to the preparation cost.
[[8]] The tenderer may also sell the drawings, and the selling price shall be determined according to the cost; If the tenderer does not provide drawings, it shall provide reference materials that meet the needs of the bidder in preparing the technical proposal.
C. What are the principles of bidding for construction projects in supervision bidding?
Supervision bidding's bidding activities should follow the principle of openness? Is it fair? The principle of fairness, honesty and credibility?
(1) Open principle?
The principle of openness requires a high degree of transparency in the bidding activities of construction projects in supervision bidding?
(2) the principle of fairness?
The principle of fairness refers to the participation of all parties and intermediaries in the bidding activities of construction projects in supervising the bidding.
D. What principles should supervision bidding follow in highway engineering construction? What conditions should the bidder have?
Supervision bidding bidding for highway engineering construction should follow the principles of openness, fairness, impartiality and good faith. The bidder for highway engineering construction supervision refers to the supervision enterprise that has obtained the qualification of supervision enterprise issued by the transportation department according to law, responded to the bidding and participated in the bidding competition.
Article 26 of the Bidding Law stipulates that a bidder shall have the ability to undertake a project subject to tender; If the relevant provisions of the state stipulate the qualifications of bidders or the bidding documents stipulate the qualifications of bidders, the bidders shall meet the prescribed qualifications.
Bidders should have the ability to undertake bidding projects. To participate in bidding activities, certain conditions must be met, and not all interested legal persons or economic organizations can participate in bidding.
Bidders should generally meet the following conditions:
(1) manpower, material resources and financial resources suitable for the requirements of the tender documents;
(2) the qualification certificate required by the tender documents and the corresponding work experience and performance certificate;
(3) Other conditions stipulated by laws and regulations.
If the relevant provisions of the state stipulate the qualifications of bidders or the bidding documents stipulate the qualifications of bidders, the bidders shall meet the prescribed qualifications. For some large-scale construction projects, suppliers or contractors are required to have certain qualifications. For example, professional management departments such as the Ministry of Water Resources have a series of regulations on viewing major construction projects, and bidders participating in national key construction projects must meet Grade A qualifications. Bidders must have corresponding qualification requirements to participate in this kind of bidding.
Job2299 finishing of China engineering supervision talent network
E. When the construction unit chooses supervision bidding mode, the key factors to be considered are ().
The construction unit shall, according to laws and regulations, project characteristics,
The choice of engineering supervision unit space,
And the urgency of project implementation,
Reasonable selection of bidding methods,
And go to the bidding supervision and management department to handle relevant bidding according to the prescribed procedures.
F. What are the standards in supervision bidding?
Post-qualification review, compliance review and technical bid source review are similar, but the commercial bid is different. The quotation of the supervisor is generally unified in accordance with the provisions of the bidding documents, and there is no competition, while the construction mainly relies on quotation competition. In addition to fees and tax rates, the comprehensive unit price, measures fee and total price of each project should be compared in detail in terms of feasibility and completeness, and a more reasonable low price should be selected to win the bid.
G. What are the characteristics of supervision bidding?
1. The number of bidders invited is very small. Usually, the supervision units are selected by inviting tenders, and the number of invitations should be 3 ~ 5. Because supervision bidding is the choice of comprehensive ability such as knowledge, skills and experience, each bidder will put forward unique opinions or creative implementation suggestions, but each has its own advantages and disadvantages. If too many bidders are invited to participate in the competition, it will not only increase the workload of bid evaluation, but also give some compensation to the unsuccessful bidders after calibration. Compared with the purpose of seeking the best among many bidders, it often produces twice the result with half the effort.
2. Quotation plays a secondary role in the selection. The principle of selecting the winning bidder for project construction and material supply bidding is to mainly consider the price competitiveness on the premise of meeting the required standards technically. Supervision bidding, on the other hand, puts the ability first, because when the price is too low, it is difficult for the supervision unit to put the interests of the tenderee first. In order to safeguard their own economic interests, it is necessary to reduce the number of supervisors or send more personnel with low professional level and low salary, which will inevitably lead to the damage of the project. In addition, the quality service provided by the supervision unit can often make the tenderee obtain the practical benefits of saving project investment and putting into production in advance, and it is not worth the loss to consider the quotation factor too much. But from another point of view, there should be a corresponding balance between service quality and price, so the tenderee should compare the prices among bidders with equal ability.
3. The purpose is to choose the ability of the supervision unit. Supervision service is a highly intelligent investment of supervision units. The quality of service depends not only on whether the standardized management procedures and methods are followed in the implementation of supervision business, but also on the professional expertise, experience, judgment, innovative imagination and risk awareness of the staff involved in supervision. Therefore, when selecting supervision units through bidding, it is the ability competition that is encouraged, not the price competition. If we don't pay enough attention to the qualification and ability of the supervision unit and only determine the winning bidder according to the quotation, we will ignore the quality service, and the bidder with the lowest quotation is not necessarily the most capable worker.
H. What conditions should a supervisor meet in bidding?
According to the Measures for the Administration of Bidding in supervision bidding for Highway Self-engineering Construction promulgated by the Ministry of Communications, supervision bidding for highway engineering construction should meet the following conditions:
(a) the preliminary design documents shall go through the formalities of examination and approval, and have been approved;
(two) the construction funds have been implemented;
(3) A project legal person or an institution undertaking project management has been established according to law.
Supervision bidding is in the process of project implementation, in order to manage and supervise the project quality and prevent the phenomenon of self-supervision by the construction unit.
1. What conditions should supervision bidding meet?
According to the Measures for the Administration of Highway Engineering Construction in supervision bidding promulgated by the Ministry of Communications, a highway project subject to special bidding for construction supervision shall meet the following conditions:
(a) the preliminary design documents shall go through the formalities of examination and approval, and have been approved;
(two) the construction funds have been implemented;
(3) A project legal person or an institution undertaking project management has been established according to law.
Supervision bidding is in the process of project implementation, in order to manage and supervise the project quality and prevent the phenomenon of self-supervision by the construction unit.
ask
1 require the supervision unit to control the quality, safety, progress and measurement in the implementation stage of this project, manage the contract in the survey and supervision stage, and strictly implement the relevant laws and regulations of the national engineering construction supervision system. Supervise on-site operation.
2. Within the scope authorized by the supervision contract, preside over the coordination work of all parties to the project, and prepare the minutes of the operation coordination meeting and technical demonstration meeting.
3. Assist the entrusting party to carry out the acceptance and review of each stage of project implementation according to the relevant provisions of the state, and review the survey reports and materials prepared by the survey unit. 4 The winning bidder shall not subcontract or subcontract the supervision project. Otherwise, the customer has the right to terminate the contract. The winning bidder shall bear all losses caused thereby.
The personnel promised by the winning bidder in the book and the instruments and equipment used in this project must be present at the same time as the supervision personnel, and all the work contents of the investigation stage required by the client must be completed, otherwise it will be regarded as a breach of contract, and the client has the right to refuse to pay the supervision fees until the instruments and equipment arrive at the scene or terminate the contract.
J. Under what circumstances is it necessary to go to supervision bidding?
For services such as survey, design and supervision, if the estimated price of a single contract is more than 500,000 yuan, bidding must be conducted.