In the study, work or life, it is not guaranteed that there will be some emergencies, in order to minimize the adverse impact of the accident, it is possible that you need to develop an emergency plan in advance. Then the preparation of emergency plans need to pay attention to what problems? The following is my collection of emergency plans for hospital power outages, for reference only, we take a look at it.

Hospital power outage emergency plan 1

First, the purpose of the exercise:

Improve the ability to respond to sudden power outages, to protect the normal conduct of medical work.

Second, the content of the exercise:

The normal 1 transformer failure caused by power outages in the department quickly switched by the normal 2 transformer power supply.

Third, the drill time: May 31, 20xx 13:30 pm

Fourth, the drill location: outpatient clinic building, inpatient building, high distribution room.

V. Emergency Command Group:

Commander-in-chief:

Deputy Commander-in-chief:

Sixth, the working group

Leader:

Deputy Leader:

Members: Engineering Department, Security Department

VII. Preparation for the exercise:

Notify the exercise program to all departments of the power outage, prepare the emergency lights etc.

VIII, exercise description:

May 30, 20xx, high distribution room often 1 transformer failure, resulting in outpatient building, medical building, inpatient building multi-sector blackout, the property engineering department quickly in accordance with the plan repair, 15 minutes later, the power supply will be switched to the often 2 transformer, restoring power supply. (The drill, does not affect the operating room, blood dialysis room, ICU and other key departments, because these departments are equipped with the end of the automatic switching bit, in case of emergency can be automatically switched to the normal 2 transformer, to ensure normal power supply)

Nine, the drill procedures:

1, the commander-in-chief announced the start of the drill.

2, the high distribution room often 1 transformer failure lights, staff quickly reported to the Department of Logistics, property managers, while the implementation of repair.

3, Logistics Department received the report immediately after the command security center, the use of public **** broadcasting system to issue a sudden power outage notice, notify the outpatient emergency room, ward medical staff to maintain order. Comforting propaganda to stabilize outpatient emergency and about the mood of the patients or family members in the elevator (elevator trapped in the implementation of the plan).

4, the property was notified, the engineering department six staff divided into three groups, respectively, into the door building, inpatient building of the high distribution room and the total high distribution room, the power supply transformer from the normal 1 switch to the normal 2, to restore power supply, and to the normal 1 for troubleshooting.

5, elevator class is responsible for each elevator patrol.

6, the security guard is responsible for emergency room patrol.

7, after filling out the emergency reported to the hospital office.

X. Notes:

1, the drill before the preparatory work should be adequate, publicity work should be in place.

2, the electrician to switch the power supply in strict accordance with the operating procedures to implement.

The hospital power outage emergency plan 2

I. Usually should do the work:

① softened water tank water level should be more than three molecules of two, the high water tank should be full of water level.

② boiler should maintain a normal water level.

③ Emergency lights should be in good condition, and a strong flashlight, ready for use at any time.

④ Strict equipment inspection system to ensure that the equipment has emergency capacity.

II. Emergency measures in the event of a power failure:

① need to remain calm and make a judgment on the accident.

② need to be judged as a sudden plant-wide power outage, immediately open the emergency flue gas discharge valve, so that the flue gas is discharged from the emergency discharge channel to prevent deflagration.

③ All the equipment in the control room cabinet power to the "stop" position, to prevent the sudden start of the wrong call.

④ In the water distribution tank, open the high water tank to the water distribution tank contact valve, check whether there is water overflow in the water jacket next to the feeder. ⑤ Check whether the water outlet valve of the high level water tank is always open, observe the water level in the high level water tank, and estimate how long the amount of water stored in the high level water tank can be maintained.

⑥ Close and gradually close the split cylinder outlet valve to reduce boiler water consumption.

⑦ shut down the furnace jacket cooling water replenishment valve, the lower material water jacket cooling water valve, two combustion chamber roof cooling water valve, flue cooling water valve, check who overflow can be.

⑧ check the high water tank water consumption and water level decline, the high water tank water to maintain the time once again estimated. ⑨ check the silo situation, the silo material level situation, the silo iron rod insertion stick, to prevent the silo burn through. ⑩ Contact the power plant, ask about power outages, determine the time to restore power.

Need to report to the leadership, the site situation, emergency measures to deal with the situation, the power plant power outage feedback, there are still problems to the leadership report.

Need to boiler water level, the water jacket water whether overflow, high water tank water storage, sub-cylinder pressure, steam packet pressure, site conditions, power outage situation for the moment monitoring.

III. Measures after the incoming call:

① A comprehensive inspection of the plant equipment, to determine the absence of major damage, ready to resume system operation. ② will be in the control room cabinet equipment power to "automatic" position, start the induced draft fan, the production line flue blowing, so that the flue to return to negative pressure operating conditions. Close the emergency flue gas discharge valve.

③ Start the circulating water pump to replenish the high level water tank, when the high level water tank is full of water, close the water distribution tank to the high level water tank contact valve, restore the water distribution tank to the water jacket valve opening and closing, to ensure that there is enough cooling water to cool the water jacket.

④Start the boiler feed pump to feed water to the boiler.

⑤ When everything is normal, restore the normal combustion of the incinerator and the second combustion chamber, restore the normal operation of the medical waste incineration system.

The hospital power outage emergency plan3

First, the development of the purpose

In order to cope with the hospital sudden large-area power outage, rapid and orderly organization and restoration of power supply to ensure the safety of patients' lives and reduce the loss of property, to ensure that the hospital power smooth, to promote the institutionalization of the emergency response to accidents and standardization of the work, based on the relevant laws and regulations, according to the state. Combined with the actual situation of our hospital, the development of this plan.

Second, the scope of application

This plan refers to the "sudden large-scale power accidents" (hereinafter referred to as "large-area blackout") refers to the sudden and sudden damage caused by serious natural disasters or damage to important facilities. Or suffered damage and other causes of sudden hospital-wide large-scale power system security failures, power grid disintegration or collapse of a large area of the accident.

Three, emergency principles

Large-area power outage accident handling work to implement the "prevention-oriented, unremitting" policy, follow the "unified leadership, improve the mechanism, clear responsibility, strengthen cooperation, rapid response, measures decisive" principle. Measures decisive" principle.

Fourth, the organization

The hospital set up a large power outage emergency leading group, under the emergency repair team.

1, the hospital large power outage emergency leading group

Leader: General Manager

Deputy Leader: President

Members: Personnel and Administration Manager

Logistics Supervisor

Electric repairman duties:

(1) do a good job of daily safety and power supply, the implementation of the responsibility system of production safety, to prevent the occurrence of large-scale power outages. The accident occurs.

(2) in the event of a large-scale power outage, do a good job in a timely manner in the event of power outage emergency work, as soon as possible to restore power.

(3) According to the severity of the large-scale blackout, the decision to start and terminate the emergency plan.

(4) timely report to the higher levels of the accident and publicize to the community.

(5) If necessary, request external support.

(6) The leader of the leading group is to fulfill the provisions of this plan the first responsible person. Members of the unit should be under the unified command of the leading group, each in its own way, each responsible for its own responsibility, full cooperation, and do a good job in the large-scale blackout accident when the social integration of emergency work.

2, emergency repair team

Captain: logistics supervisor

Members: electric repairman

Responsibilities: in the event of an accident, the organization of personnel to implement the rescue operation; to the command team to report the accident, if necessary, to the power supply department to send a request for assistance, and then summed up the lessons learned from the emergency rescue work.

V. Emergency procedures

(a) logistics department electrician class emergency procedures

1, planned blackout emergency procedures

(1) electrician in the power supply company notification of blackout of the phone or other forms of blackout notification, you must ask the time of the power outage, how long the blackout and blackout reasons, and make a record. Make a good record, such as not in this shift, should be in the handover handover clear.

(2) notify the head of the emergency leadership team (notify the general duty officer at midnight), explain the reasons for the power outage, the specific time of the power outage, how long the power outage, and do a good job of the backup second power supply. Preparation work.

(3) such as during normal working hours, time permitting, should be issued by the Department of Personnel Administration in writing to the departments.

Hospital power outage emergency plan model

(4) If the time is urgent, it should be immediately notified to the head of the emergency leadership team (night notification of the general duty officer) after receiving the notice of the power supply company, to explain the situation, by the Ministry of Personnel and Administration to the departments to send a notice, the important departments should be told with the head of the department head of the head of nurses of the power outage time, and make a good plan for the power outage.

(5) 30 minutes before the power outage to the distribution room, do a good job of switching to the second backup power supply pre-check. When the power outage to ensure the normal startup and delivery of the standby second power supply in 15 minutes.

(6) 10 minutes before the power outage, all passenger elevators will be parked in the 1st floor position.

(7) When the external network power outage, start the generator power supply to ensure that the operating room emergency department and other key departments of the power supply.

(8) Make a good record of the operation of the second backup power supply and after the restoration of utility power supply.

2, temporary power outage emergency procedures

(1) a temporary power outage, you should immediately ask the power company by phone, ask the reason for the power outage and the duration of the power outage.

(2) Notify the head of the emergency response team or the general duty to explain the situation.

(3) If the blackout time is short (within 10 minutes), you should wait for the utility to send high and low voltage power.

(4) If the blackout time is longer, you should immediately prepare to switch the backup second power.

(5) For various reasons, the dual power supply can not start, should start as soon as possible standby generator, to ensure that the key departments of power supply.

(6) Make a good record of the operation of the second backup power supply.

(7) hospital internal reasons for power outages, to identify the cause of the power outage, high-voltage circuits or low-voltage circuits. If the high-voltage circuit failure, the hospital electrician immediately introduced into the backup power supply, should be promptly contacted with the power supply department repair class, as soon as possible to restore, to ensure that the electricity; if the hospital mortgage circuit failure, should quickly identify the cause, in accordance with the operating regulations to restore the circuit.

(B) departmental sections of emergency procedures

1, the departments received a power outage notice, should be allowed to bar all of its power cut off, to be put back into use after the circuit is restored to normal.

2, received a power outage notice, immediately do a good job in preparation for the power outage. If there is a patient rescue use the backup power.

3, after a sudden blackout, immediately look for ways to rescue patients and their operation of the power to maintain the rescue work, and open the emergency lights lighting, etc.. And should promptly notify the electrician or the general duty.

4, critical patients using a ventilator in surgery should normally have a simple respirator next to the machine, in the event of a sudden power outage, health care workers immediately disengage the ventilator, the use of simple respirator to maintain breathing. The use of electric nitrogen suction patients, with a 50ML syringe connected to the nitrogen suction tube suction nitrogen.

5, such as double line are suddenly power supply failure, the hospital generator power supply, medical staff should first ensure that the patient resuscitation; nurses should be calm and collected, on the ventilator on the hand holding the ball method, on the monitor on the use of manual measurement of blood pressure and pulse, electric nitrogen inhalation is used to use the 50 ml syringe connected to the nitrogen suction tube suction, such as, close observation and please change, the rest of the staff immediately notify the electrician by phone, the Department of Personnel Administration, and the use of emergency lights. Personnel Administration, and the use of emergency lights for lighting.

6, strengthen the patrol ward, appease the patients, while paying attention to fire and theft.

7, the elevator encountered a sudden blackout, logistics staff to do a good job of passenger thinking, to the outside call, with artificial methods to put all the passengers out.

Six, safeguards

1, the electrician should do a good job of generator maintenance daily to ensure that the generator is always in use.

2, the electrician usually master the knowledge of power supply and operating norms, pay attention to operational safety.

3, clinical departments routinely equipped with emergency lights, torches and other lighting, regular checks, to maintain a perfect state.

4, the logistics department should be organized to carry out emergency power outage drills, 1-2 times a year, through drills, so that everyone is familiar with the emergency procedures for emergency disposal of sudden power outages to ensure patient safety.

;