Technical specification for the construction of clean surgical department in hospitals (GB50333-2013)

After the completion of the project, the construction unit should organize the medical department, the corresponding department using the clean room, design and construction units in accordance with the project design documents and "Hospital Clean Surgical Department Building Technical Specification"

(GB50233-2002), "Ventilation and Air Conditioning Engineering Construction Acceptance Specification" (GB50243-2002) and "Clean Room Construction and Acceptance Specification" ( JGJ71-90) and other relevant construction, quality acceptance specification for clean room for strict quality acceptance, and should be entrusted to a qualified third-party testing unit for clean room cleanliness against the design documents and relevant standards and norms for testing.

If you need some of the equipment in the operating room, we recommend Liaoning Hao Clean Chemical Equipment Manufacturing Co. Anesthesia cabinets, purification light strips, medical hand-washing sinks, laminar flow ceiling.

2, pharmaceutical companies: air shower room, cargo shower room, purification transfer window, ordinary transfer window, high-efficiency air supply, LED purification plate light, steel airtight doors and windows, FFU filtration unit.

3, laboratory: all-steel laboratory bench, fume hood, etc..

4, supply room: sterilizer, washing machine, drying cabinet, stainless steel dirty washing pool, check and pack table, etc..

Their company's products are all over the Northeast and neighboring areas, hope it can help you.