How to move large equipment in factories

Nearly seal moving company received factory relocation orders, there are large equipment in the factory, handling equipment, there are several kinds of machinery, 2 tons of manual hydraulic forklift, 2 to 5 tons of hydraulic trucks, 8 to 200 tons of cranes, etc., and hand cranking the top of the roof, iron plate, logs, winches, all kinds of lifting straps and other professional tools.

Nearly seal moving company received the factory relocation order, the factory has large equipment, handling equipment, there are several kinds of machinery, 2 tons of hand-operated hydraulic forklift, 2 to 5 tons of hydraulic trucks, 8 to 200 tons of cranes, etc., as well as hand-cranked satchel tops, iron plate, logs, winches, all kinds of lifting straps and other professional tools.

Seal Moving Company in the whole process of equipment moving in an orderly manner, the machine does not have a piece of the phenomenon of bumping wear and tear, and in a few days earlier than the factory expected time to complete the factory moving. A few days after the start of the moving company's people will also call to ask whether the equipment can operate normally and so on.

Tell us how Seal Moving selected which moving operation for Daxing Equipment Keeney.

1, large equipment handling before, should be through the route and the two ends of the loading and unloading conditions to do a detailed investigation, to understand the situation of the transport route, to draw up the transportation program, put forward security measures, and develop equipment handling measures. (For the preliminary work to make the pad)

2, large equipment handling before, should be the roadbed sinking, road surface soft and permafrost open and take measures to investigate and prevent tilting in the process of handling, overthrow; along the way through the bridges, culverts, ditches, etc. should be a detailed inspection and calculation, if necessary, should be reinforced. (Thus reflecting the professionalism of the seal people)

3, large equipment transportation road slope shall not be greater than 15 degrees; such as can not meet the requirements, must seek the consent of the manufacturer and take reliable safety measures.

4, the transportation road above the transmission line, if any, through the safety distance should be maintained, otherwise isolation measures must be taken.

5, the trailer with the shipment of large equipment, stability calculations should be made and take measures to prevent severe shock or vibration. The horn should be sounded before starting, the speed shall not exceed 5km/h-10km/h when loading, and the trailer should be equipped with an open car and escort liaison.

6, in the vehicle unloading large equipment, unloading, platform should be firm, and should have enough width and length. After loading the platform shall not have uneven sinking phenomenon.

7, set up unloading platform, should take into account the car unloading spring spring up and the hull of the ship floating caused by the height difference.

8, the use of two different speeds of traction machinery unloading the car, should take measures to make the equipment force uniformity, traction speed, traction should be below the center of gravity of the equipment point of gravity.

9, the center of gravity of the towed object should be placed in the center of the towing board, towing round objects, should be padded with sleeper wedges; on the high and small bottom area of the object, should be taken to prevent tipping measures; thin-walled or easily deformed objects, should be taken to strengthen the measures.

10, hauling skidder set of ground radium should be calculated, use should be frequently checked. It is strictly prohibited to tie the towing skidder group in the unsound building or running equipment, piling and tying the towing skidder group, should be aware of the underground facilities and calculate its bearing capacity.

11, in the towing wire rope guided pulley inside the danger zone is strictly prohibited people through or stay.

12, intermediate stopping, should take measures to prevent the object rolling. At night should be set up red light warning, and set up a person to watch.

Seal Moving Company has many years of experience in transportation, handling and transportation of large pieces of transportation has done a lot of practical experience, handling and transportation of large wind power equipment, various large excavators, precision equipment and instruments, large machinery and equipment. Welcome to all walks of life to guide the work.