Installation requirements of soft water treatment equipment

1) The equipment needs simple horizontal foundation; about 250~450mm from the wall, can be arranged according to the actual situation by the corners;

2) Because the equipment itself is light, generally only need to take into account the weight of the resin and water loaded on the equipment;

3) The water inlet and outlet pipes are connected by standard flanges or threads, which need to be fixed and supported, and can not be supported by the body of the valve in order to prevent the stress;

4) The water pressure meter should be installed on the water inlet pipe;

5) The water pressure meter should be installed on the water inlet pipe.

4) Water pressure gauge should be installed on the water inlet pipe. When the equipment is running with rinse water discharge, set up a floor drain or drain nearby

5) brine pipe: brine tank should be as close as possible to the softening tank, brine pipe the shorter the better;

6) the drain pipe should not be longer than 6 meters, do not install a shut-off valve, the outlet should not be higher than the valve, the end of the openings in order to avoid siphonage, elbows the fewer the better;

7) in the vicinity of the equipment on the wall to be placed on the distribution of electrical outlets, should be equipped with an insurance policy. Electrical outlets, should be equipped with a fuse (generally do not install switches), requires good grounding.