Quality Assessment Report Content

Quality Assessment Report Content

Quality Assessment Report Content, the core content of our quality assessment report is also known as quality assessment. In nowadays progressive society, there are more people will go to use the report, then when writing the report to pay attention to the accuracy of the content, the following is the quality assessment report content.

Quality assessment report content 1

Supervision unit of the project quality assessment report issued after the completion of the project pre-acceptance "Construction Engineering Supervision Specification" GB/T50319-2019 provides that after the completion of the project pre-acceptance, the project supervision organization should prepare a project quality assessment report, after the superintendent of supervision engineers and engineering supervision unit of the technical leader of the audit and signature reported to the construction unit.

Engineering quality assessment report fill

1, the basic situation of engineering construction:

(1) engineering situation: should indicate the geographic location of the project, structural form, number of floors, floor area, seismic intensity, fire protection level, the date of opening and completion, the engineering Contract cost, the main building decoration practices, the main content of the installation works, the completion of the construction contract.

(2) the name of the main unit of responsibility: should indicate the full name of the construction, survey, design, supervision, construction units, graphic review organizations, testing organizations (including major subcontracting units).

(3) Supervision Department: should indicate the form and size of the composition of the project supervision department, supervision department staff composition and division of labor, the main testing equipment and tools.

(4) construction unit: should indicate the quality objectives of the construction company, the composition of the quality system and the main quality management measures.

2, supervision of the process of quality control:

(1) Supervision planning and implementation of the rules: Supervision planning of the supervision objectives, scope and measures outlined in the supervision of the details of the implementation of the key parts of the quality control points.

(2) Supervision mode: should indicate the main testing equipment and tools used in the supervision process, to take side, inspection or parallel inspection.

(3) supervision of the construction process stage: it should be noted that the incoming raw materials to test the witness sampling, hidden works acceptance, acceptance of sub-projects, construction organization design review and rectification of quality defects and so on.

(4) completion and acceptance of the stage of supervision: should indicate the supervision of the completion of the data review, the quality of the project for the completion of the pre-acceptance of the situation, the existence of problems in the implementation of rectification.

3, engineering quality assessment:

(1) assessment basis: should be based on the current national norms, specifications (specify the name of the main norms, regulations), design documents, construction contracts, engineering geological survey reports, foundation test reports and settlement observation records and other documents for assessment.

(2) verification of completion data: completion data should be verified in accordance with the provisions of the complete, true, accurate, as-built drawings and whether the entity is consistent with the "unit project quality control data verification record sheet", "unit project safety and functional testing data verification and the main features Spot check record sheet", "unit engineering quality verification record sheet".

(3) production safety.

(4) Implementation of mandatory provisions.

(5) divisional project quality: the quality of each division should be outlined, must indicate the main sub-projects measured passing point rate, fill out the division of the project quality acceptance summary table.

(6) settlement observations and conclusions: indicate the settlement observation unit and the completion of the pre-settlement stage of the settlement observation conclusions.

(7) unit project quality assessment conclusions.

(8) indicate whether the project has dumped unfinished projects, the handling of the remaining issues, what is the proposal for the construction.

Quality assessment report content 2

How to write a quality report

In accordance with the provisions of the superintendent of the project after the engineer signed the inspection report, should be put forward to assess the quality of the project report, and by the superintendent of the engineer and the supervision of the unit of the technical responsible person to review and sign. Thus, the quality assessment report of this important technical documents, not only is the quality of construction projects reflect, but also supervision units, supervision engineers supervision level of a visual display. Therefore, the quality assessment report should cause the supervision unit as well as supervision engineers pay great attention to.

To write a good quality assessment report, we can start from the specifics of the project, the main design changes, the main quality control measures, the main basis for quality assessment, quality assessment of the project and the existence of major problems and other content. And in these contents, especially to engineering quality assessment is important.

In the quality assessment report, first of all, to evaluate the quality of a project, the basic situation of this project should be clear, because this content can give a person an overall impression. Secondly, for the project, whether it is construction or supervision of the work, one of its main basis is the design documents. Therefore, an important evaluation criterion of construction quality is to meet the requirements of the design documents.

Of course, whether to meet the requirements of the design documents, in the acceptance of the project, the design unit will also put forward the corresponding comments, but as a comprehensive and systematic evaluation of the quality of construction works, quality assessment report should also be incompatible with the original design documents of the relevant content of the legitimacy and reasonableness of the explanation. As a quality assessment report, the formation of the quality of construction works should also have a certain description.

The quality of construction works. Formation is a gradual process, in the process of construction quality formation, there are often many uncertain factors affecting the realization of quality objectives, which requires all parties involved in the construction to establish a certain quality control system, take practical and effective measures to control the construction quality objectives. Quality control measures can be described from the construction quality control and supervision quality control two big aspects.

The former, combined with the construction site quality management inspection records to briefly explain; while the latter, an important element of quality control measures, should be differentiated from the supervision work summary, focusing on the main measures of supervision of quality control, including before, during and after the control. In addition, the quality assessment report must also relate to the report based on the name of the standard, the name of the specification and the code name of the standard, the name of the relevant laws and regulations, as well as the relevant contracts.

The assessment of engineering quality is the core of the quality assessment report. If the unit project quality assessment, then, this part of the content should be closely around the unit project quality standards to comment, including:

First, one by one, each division (sub-division) of the acceptance of the situation is explained to conclude that the unit project contains a division (sub-division) of the conclusion of whether the project is qualified;

Second, according to the quality control information in the verification form of the relevant content of the quality control information verification form, and conclude whether the quality control information is complete;

iii. explain whether the testing items, testing procedures, testing methods and the results of the test reports are in accordance with the requirements of the specifications, and conclude whether the testing information on the safety and functionality of the division works included in the unit (sub-unit) works is complete;

iv. for the main functionality of the sampling test items, the sampling test items and the sampling test results carried out in the unit works, and conclude whether the testing information on the safety and functionality of the unit works is complete; and Sampling of the project, the results of sampling can meet the requirements of the relevant professional quality acceptance specifications for description, to conclude that the results of the sampling of the main function of the project is in line with the provisions of the relevant professional quality acceptance specifications;

v. Evaluation of the quality of the perception of the construction project can be combined with the unit of engineering perception of the quality of the inspection record sheet on the inspection items, quality assessment description, and to conclude that the quality of perception The comprehensive evaluation conclusion. When these five aspects are sure, can also be concluded that the unit project quality acceptance of the conclusion.

In the construction process, some problems are inevitable, some problems in the process of control has been resolved, and some have not been resolved. For these unresolved issues should be raised in the quality assessment report. In addition, some problems found in the pre-acceptance process, may not be able to solve all at once, the quality assessment report of the supervision unit should be in the completion of the acceptance of these issues raised to the acceptance of the group report, and how to deal with these issues to put forward the appropriate views.

Quality assessment report content 3

Project quality management main content:

Divided by stage:

(a) decision-making stage of the quality management

This stage of quality management of the main Content is based on extensive data collection, research, analysis, comparison, to determine the feasibility of the project and the best program.

(2) Pre-construction quality management

Pre-construction quality management is mainly:

1, the construction team's qualifications for re-examination, including the qualifications of the various subcontractors review. If the construction unit is found to be inconsistent with the bid, effective measures must be taken to correct it.

2, all contracts and technical documents, reports for detailed review. Such as drawings are complete, there are no errors and vacancies, there is no contradiction between the various design documents, technical standards are complete and so on. Should focus on the review of technical documents in addition to the contract, including:

(1) review the technical qualifications of the relevant units of documents;

(2) review of the report on the commencement of construction, and verified on-site;

(3) review of the construction program, the construction organization and design of the construction and technical measures;

(4) review of the materials, semi-finished products, quality inspection reports;

(4) review of the materials, semi-finished products, quality inspection reports;

(3) review of the construction program, construction organization and technical measures.

(5) review the statistical data reflecting the quality of the process;

(6) review of design changes, drawing modifications and technical approval;

(7) review of quality issues related to the handling of the report;

(8) review of the application of new processes, new materials, new technologies, new structures of the technical appraisal;

(9) review of relevant processes Handover inspection, sub-item, sub-project quality inspection report;

(10) review and sign the site of the relevant technical visas, documents.

3, equipped with testing and experimental means, equipment and instruments, review the contract on the method of inspection, standards, frequency and sampling requirements.

4, review the progress plan and construction program.

5, the construction of new technologies to be adopted, new materials, new technologies for review, verification of identification and experimental reports.

6, the procurement of materials and engineering equipment to check whether the procurement is in line with the specified requirements.

7, to help improve the quality assurance system.

8, further auditing of the persons in charge of all aspects of the site and the main construction machinery.

9, do a good job of design and technical delivery, clear quality requirements for all parts of the project.

10, prepare the resume, quality management forms.

11, ready to guarantee and insurance work.

12, Issue mobilization advance payment certificate.

13, Comprehensive inspection of conditions for commencement of work.

(C) quality management in the construction process

1, process quality control, including the quality of construction operations and the quality of construction technology management.

(1) Determine the process of quality control of the project;

(2) active control of the conditions of the process activities, mainly refers to the factors affecting the quality of the process;

(3) timely inspection of the quality of the process, put forward to the follow-up requirements and measures;

(4) set the control points of the quality of the process.

2, set the quality control points, high technical requirements, construction difficulty of a process or link, set the focus of technology and supervision, focusing on the control of operators, materials, equipment, construction processes, etc.; for quality problems or easy to produce unqualified products process, in advance to formulate effective measures, focusing on the control; for the new process, new materials, new technologies also need special Attention.

3, the quality of the project pre-control

4, quality inspection, including the operator's self-inspection, mutual inspection within the team, the handover inspection between the various processes; inspections of the constructor and the quality inspector's inspection tours; supervision and inspection of the government's quality inspection departments. Specifically include:

(1) quality inspection of decorative materials, semi-finished products, fittings and equipment, and check the corresponding certificate of conformity, quality assurance certificate and laboratory report;

(2) pre-inspection before the construction of sub-projects;

(3) quality inspection of the construction operation, the quality of the hidden works;

(4) quality inspection of the acceptance of the sub-division of the works;

(4) quality inspection of the acceptance of sub-division of the works;

(4) the quality of the acceptance of the sub-division of the works;

(5) quality control and inspection of the construction work.

(5) unit project quality inspection and acceptance;

(6) finished product protection quality inspection.

5, finished product protection

(1) Reasonable arrangement of the construction sequence, to avoid destroying the existing products;

(2) the use of appropriate protective measures;

(3) to strengthen the protection of finished products inspection work.

6, the delivery of technical information, including the following documents: materials and products factory certificate or inspection certificate, equipment maintenance certificate; construction records; hidden project acceptance records; design changes, technical approvals, technical negotiation; water, heating, electricity, sound and telecommunications, equipment installation records; quality inspection reports; as-built drawings, completion and acceptance of the form.

7, quality accidents, general quality accidents by the superintendent engineer organization to analyze the accident, and instructed the relevant units to put forward solutions. Major quality accidents, must be reported to the owner, supervisory departments and relevant units, by all parties **** with the solution.

(D) quality management after the completion of the project

Completion inspection according to the requirements of the contract, check the unfinished work and defects, and timely resolution of quality issues. Produce as-built drawings and as-built information. Responsible for the corresponding maintenance responsibilities during the maintenance period.

Divided by the main factors:

Personnel factors

1, to select a high level of technical skills, strong management capabilities of the project manager and his leadership team members. This "selection and allocation" can be through the bidding, personal inspection and other ways, especially to examine the performance in recent years, and listen to a wide range of relevant personnel reflections.

2, to strictly review the qualifications of subcontracting units. The review object includes the overall quality of the enterprise, the quality of the leadership team and the personal quality of the workforce, in particular, to carefully verify the comprehensive quality of the technical director.

3, skilled workers should be licensed. The technical grade of the technical staff and related documents should be real and effective, and the original should be carefully checked when necessary.

4, to develop a sound management system. To do top-down layer by layer.

5, implement the system of rewards and penalties. Appropriate rewards have a more positive effect than a fine.

6, the site managers should be held regularly quality analysis, timely grasp of the actual situation of the site work, materials, machines, etc., for each sub-projects, each process to set out the quality requirements for the quality of problems that may occur to analyze and study, to do so in advance of the prediction.

Quality of materials and components:

1, first of all, good material procurement. Set up by the relevant departments to participate in the material review procurement team, fully research the raw material supply market, the use of winter and the start of the pre-site investigation of a variety of raw materials, the quality of raw materials, prices and manufacturers qualifications, credibility and so on to do a comprehensive understanding of the best organization of the relevant personnel to go to the manufacturers on-site inspections to determine the bidding manufacturers to bidding, to be ready for the bidding.

2, do a good job of material bidding, strict bidding procedures, good quality, reasonable price, high reputation for the winning principle, the implementation of open and fair bidding.

3, must be for the characteristics of the project, according to the performance of the material, quality standards, scope of application and construction requirements and other aspects of comprehensive consideration, carefully to select and use materials.

4, material testing and inspection. Requirements of the contracting unit of the main raw materials retest, and the results of the retest properly stored. For material testing and inspection units should also be carefully examined.

5, new materials and new products should be verified, identification of its proof and confirmation of the documents.

6, to strengthen the management of the material into the field. To reasonable stacking, there should be obvious signs; there should be a person in charge, often check; to strictly implement the "Construction Engineering Quality Management Regulations", unqualified building materials, components and equipment shall not be used in the project or installation.

Construction machinery and equipment:

1, for the main construction equipment should be examined for its specifications, model is in line with the requirements of the construction organization design. Equipment into the field and debugging qualified, reported to the audit, the need for regular inspection of the equipment, there should be proof of identification.

2, check whether the contractor to provide the project construction machinery equipped with a table to take into account the conditions of the construction site, machinery and equipment performance, construction technology and methods, construction organization and management and other factors, whether to make it reasonably equipped, equipped with the use of organic linkage in order to give full play to the effectiveness of machinery and equipment, and strive to obtain a better overall economic efficiency. For example, in the site construction, bulldozers due to high efficiency, flexible manipulation, easy to operate, so the use of a wider range, but its push distance should be within 100 meters;

Shoveling machine can independently complete the shoveling, transport

soil, unloading soil, filling, compaction and other work, suitable for large area site leveling, excavation of large-scale pits, trenching, as well as filling of roadbeds, embankments and other projects!

3, for the project's equipment quality control, mainly including checking and accepting the quality of equipment installation and commissioning and test run. To carefully review the qualification certificates of supply manufacturers, product certification, imported materials and equipment commodity inspection certificate, and require the contracting unit in accordance with the provisions of the retest. The installation of equipment should comply with the technical requirements and quality standards of the equipment. The installation process to control the cross operation of civil construction and equipment installation. Equipment commissioning should be carried out in accordance with the design requirements and procedures, requiring a test run.

Construction environment:

1, supervise the construction unit project management personnel in the organization of the construction of the combination of site conditions, engineering characteristics, climate conditions in accordance with the local conditions of the organization, management and guidance of construction. Control the start of the season, a reasonable selection of the start of the timing, plan the duration, avoid the rainy season and low temperature weather, to avoid adverse seasonal impact on the quality of the project.

2, with the construction unit to strengthen the management of the construction site, should establish a civilized construction and civilized production environment, to maintain the orderly stacking of materials and tools, smooth roads, clean and tidy workplaces, construction procedures in order, to ensure that the quality to create good conditions.

3, from the leadership to the staff, everyone speaks of quality, pay attention to quality, and gradually form an atmosphere, and then can be integrated into the unit culture, then the unit management of the construction project quality is certainly good, and vice versa.

Design and construction technology:

1, the preparation, review and approval of the construction design should be in accordance with the prescribed procedures.

2, the construction organization design should be in line with the national technical policy, give full consideration to the conditions specified in the contract. The conditions of the construction site and the requirements of regulatory conditions. Attention to its operability, schedule and quality objectives are practicable.

3, the main project, key parts and difficult projects, such as new structures, new materials, new technologies, large span, tall structures and other parts, do a good job in dealing with quality problems of the plan.

4, actively promote the application of new materials, new technologies, has been scientifically identified research results should be boldly applied to production practice, to adopt scientific construction methods to ensure project quality. For example, in the "highway science and education complex" floor concrete pouring, in the template support frame using the "fast-removal head" construction process, to be 30% of the strength of the concrete, release the fast-removal head, so that the bond between the concrete and the template to reduce the concrete to reach 100% strength, the template is very easy to use, and so on. When the concrete reaches 100% strength, the template is easy to remove.

This process compared to previous construction methods, not only reduces the loss rate of the touch plate and reduces the removal of the template process of the damage caused by the floor itself, to ensure the quality of the floor. The main content of quality control: