Keywords bidding and tendering equipment installation characteristics practice
The bidding and tendering activities of construction engineering equipment installation project is an important part of the bidding and tendering activities of construction engineering projects, it is accompanied by the development of the development of the bidding and tendering of construction engineering projects. Especially in recent years, the continuous development and improvement of engineering equipment technology, new technologies, new functions continue to appear, the investment in construction engineering equipment installation project investment ratio in engineering construction increases year by year, the number of equipment installation project bidding in the construction project is also increased year by year, the author combined with the recent years in the construction engineering equipment installation project bidding work of the practical experience of the bidding work on the construction engineering equipment installation project bidding The development of activities and characteristics of the following discussion:
I, the development of construction equipment installation project bidding
From the founding of the country until the end of the seventy years, our country has been copied from the Soviet Union's highly planned economic system, the various departments and units of the construction project and construction installation projects, are issued by the competent government departments in accordance with the plan directives, the equipment is a unified plan, the fixed-point production, the installation enterprise production, operation activities are all the same, and the installation of equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment and equipment. Installation enterprise production, business activities are arranged by the government authorities through administrative means.
In 1980, the State Council issued the "Provisional Provisions on the Development and Protection of Socialist Competition", for the first time, some of the production and construction projects suitable for contracting and business projects, can be a trial bidding method.
In 1983, the State Ministry of Urban and Rural Construction and Environmental Protection issued the "Trial Measures for Bidding and Tendering of Construction and Installation Projects", which laid the foundation for the implementation of the bidding and tendering system for China's construction and installation projects, and also opened up China's construction and equipment installation projects to implement the prelude to the bidding and tendering system.
In 1984, the State Planning Commission, the Ministry of Urban and Rural Construction and Environmental Protection jointly issued the "Interim Provisions on Tender Bidding for Construction Projects" (Planning Shi [1984] No. 2410), from the trial approach to the Interim Provisions, marking China's construction project bidding on the institutionalized track.
In 1992, the state promulgated the "Chinese People's **** and the State Bidding Law", which determines the legal status of bidding activities, marking China's construction project bidding into the legal system, procedural era.
Second, the characteristics of the construction project equipment installation project bidding
Construction project equipment installation project has the following characteristics:
1, equipment installation project variety
Housing construction project in the equipment installation project variety, the more common are: elevators, escalators, central air conditioning system, building intelligence system, water supply and drainage equipment, Fire fighting equipment, high and low voltage power distribution equipment.
2, the technical development of construction equipment projects fast
The development of housing projects is mainly reflected in the development of equipment. In the past, most of the housing projects are only three or four stories high, mostly brick structure, equipment installation only simple water supply and drainage system and civil power supply system, accounting for a small proportion of housing investment. With the development of the economy, people's material living standards continue to improve, the requirements of residential and office space also continue to improve, housing construction projects are not only higher and higher, advanced equipment and facilities have entered the housing project. Such as: elevators, escalators have become the main supporting projects of high-rise housing projects; central air-conditioning systems, building intelligence systems have become the main equipment for office and commercial buildings and gradually enter the ordinary residential building projects, it can be imagined that the new equipment will be with the continuous development of new technologies and the emergence of equipment bidding projects will continue to expand.
3, equipment installation project implementation program
Each equipment installation project due to the continuous development of technology, different technologies coexist in the situation, so that the equipment installation project implementation program.
For example: central air-conditioning system has a water-cooled centrifugal air-conditioning system, water-cooled screw machine central air-conditioning system, air-cooled heat pump central air-conditioning system, variable refrigerant flow air-conditioning system, ice-cooled central air-conditioning system.
Elevator equipment from the building is divided into a machine room and no machine room, which can be divided into a machine room with gears and no gears, no machine room can be divided into the upper host and the lower host; from the control is divided into the VVVF (voltage, frequency, speed) control, AC speed control, AC two-speed control. And new technologies and products are emerging again.
4, equipment tenders need to consider a number of factors, and different equipment need to consider different factors
Different types of construction equipment, its main technical parameters, the scope of the tender, manufacturing and acceptance standards, acceptance, after-sales service requirements are not the same.
such as water pumps, transformers and other equipment bidding, only need to consider the main technical parameters, selection of materials, supporting the requirements of the pieces, while the elevator bidding, in addition to consider the main technical parameters, selection of materials, supporting the pieces of factors to be considered in addition to the elevator's use of the function of the decorative, the civil construction of the supporting nature of the installation, the elevator's comfort parameter requirements, the failure rate, the commitment to after-sales service and other conditions.
5, equipment installation project bidding is different from the civil engineering bidding
Because of the formation process of equipment and construction products objectively there is a big difference in the process of formation, so the decision of the construction project equipment bidding and construction bidding is different, construction bidding requirements for the construction of building projects according to the construction design drawings of the construction of the bidding unit, according to the unified volume of quotations. And equipment bidding process, the design can only provide basic specifications, technical parameters, layout plans, the manufacturers in order to achieve the basic requirements set out in the bidding documents, its processing and manufacturing drawings, processing equipment, processing technology is different, processing of construction equipment completed the specific functions of construction engineering, performance configuration, quality, service life is also different, which results in the price of different brands of manufacturers of products Difference is huge, because the basic design requirements of the construction engineering equipment to meet the project there are different grades, high grade manufacturers of its materials, processing accuracy, processing technology, assembly level, the quality of purchased parts, the control system of the advanced, the stability of the performance of the equipment is relatively good, the future use of the process of quality and stability, high efficiency, low rate of repair. The only advantage of low-grade manufacturers, often cheap, high-end products and low-end product price difference.
Three, the practice of bidding and tendering activities for construction equipment installation projects
According to the characteristics of construction equipment installation projects, in the practice of bidding and tendering activities, should also be based on its particularity and construction projects are different.
1, in the process of preparation of bidding documents, the technical requirements of the bidding equipment, specifications parameters, functional requirements, after-sales service requirements, the main terms of the contract should be as clear as possible, so that the bidding products of various manufacturers as close as possible to the technical performance, so as to evaluate the bid.
2, taking into account the construction equipment bidding units from all over the country, the local bidding procedures and practices do not understand the local bidding, in the provisions of the bidding documents, try to avoid non-substantive reasons for the abolition of the bidding, and improve the efficiency of bidding.
3, construction equipment installation project bidding the most special is the evaluation method
Construction equipment installation project bidding using the low price winning method for some simple technology, mature technology equipment is more appropriate, but there is a certain technical content, the processing process requires certain requirements for the installation of equipment is not very suitable, because of the advanced technology and configuration, quality and performance of the stable, comprehensive function of the equipment Installation companies may not be able to win the bid because of the high price, and low-priced equipment can not fully achieve the desired technical qualifications.
The author believes that the use of comprehensive bid evaluation method is more reasonable, the key is to scientifically and rationally prepare the technical requirements of the tender documents. Reasonable setting of the technical bid and offer bid weight, because different types of equipment, the price gap between different manufacturers is not fixed, in setting the weight, that is, taking into account the reasonable competition between different manufacturers, but also to consider the technical advancement and the stability of the use.
4, construction equipment installation project bidding examples
The following is a commercial bank office building intelligent security system bidding documents and evaluation methods for some examples:
Intelligent security system is an important banking office equipment system, the requirements of the equipment has a very high degree of stability and good operation, so the project is bidding using a percentage of comprehensive scoring system, the commercial and technical bidding points. In the business bid and the technical bid on the distribution of the weight of the points focusing on technology, taking into account the business, the technical bid accounted for 60%, the business bid accounted for 40%. In the bidding documents require the bidder's bidding documents to provide the bidding price list and bidding list of goods, the system network to build the connection design program, construction program (installation and construction organization design), personnel training program, and require the bidder in the quality of the product's origin, product quality, service life, system delivery and use of the warranty time to make a commitment to the bidder on the arrival time of the equipment, installation and commissioning time, failure to arrive at the time of installation and commissioning, the time of arrival at the time of failure, the time of arrival at the time of installation and commissioning, In terms of service, the bidder is required to make a commitment to the arrival time of the equipment, installation and commissioning time, the shortest time to arrive at the site in case of failure, and the service after the expiration of the warranty period.
The main contents of the technical specifications in the bidding documents are:
(I) Overview
The bidders are required to put forward a complete solution on the purchase and installation of the intelligent security system equipment for the whole office building project and the construction of the system network to connect the project.
(ii) design and implementation of the basis
1, "Security Engineering Procedures and Requirements" GA/T75-94
2, "Security Engineering Technical Specification" GB0384-2004
3, "Henan Province, the security technology prevention of the management system of the People's Government of Henan Province Decree No. 74
4, "Building Lightning Protection Design Code for Buildings" GBJ57-83
9, "Security Alarm Equipment Safety Requirements and Experimental Methods" GA16796-97
(C) System Components
Requirements of the security system, including closed-circuit television monitoring system, alarm system, access control system, voice prompts and broadcasting system part.
(1) closed-circuit television monitoring system:
1, the vault and parking area, access channel monitoring part;
2, the first floor of the business department teller monitoring part;
3, the administrative office floor and important parts of the vital parts of the monitoring part;
4, before and after the square monitoring part of the office building;
5, self-service area Monitoring part;
6, foreign exchange trading hall monitoring part;
7, underground parking lot monitoring part;
8, safe deposit box library monitoring part.
(2) Alarm system includes:
1, vault alarm control part;
2, business department business and administrative area alarm control system;
3, self-service area, foreign exchange trading hall alarm control part;
4, the administrative office floor and the important and vital parts of the alarm control part;
(3) Access control system includes:
1, vault access control system;
2, safe deposit box warehouse access control part;
3, information center access control part;
4, self-service area access control system.
(4) voice prompts include:
1, the vault and the vault room voice prompts part;
2, the monitoring room voice prompts part;
3, floor voice prompts part.
(D) system requirements
1, the tender is for the entire preventive works.
2, a variety of pipelines must be hidden, vaults, safe deposit boxes and other important parts of the alarm monitoring lines must be buried in the concrete, the use of the pipe, line must use the national standard products, plaza and the perimeter of the line must be buried in the ground.
3, the teller monitoring image data to save 90 days, the security part of the monitoring image data to save 30 days.
4, the monitoring room to make anti-static floor and control cabinets, anti-static floor.
5, can monitor all the people who enter the monitoring room.
6, the production of TV walls, TV walls must be considered business outlets, self-service banking remote image monitoring, and leave the position of the monitor and image processing equipment.
7, monitoring room, guarding the library room to have a closed-circuit television system.
8, the bank president, the relevant business office can be in the office at any time to access all the front desk business monitoring.
9, the construction staff must have good political quality and confidentiality obligations, must have the vault design and construction experience and develop a detailed construction program synchronized with the building.
10, all alarm, monitoring system using cost-effective genuine products, sensitive detectors, image quality is stable and reliable, clear, easy to operate, with Chinese instructions.
11, responsible for the use of personnel technical training, good, thoughtful, fast after-sales service.
The main content of the evaluation method is:
(a) the business part of the bid (40 points)
1, the tender offer (34 points)
Evaluation of the benchmark value = the arithmetic average of all valid bidders tender offer
Evaluation of the benchmark value of the benchmark, the bidder's bidding price and the evaluation of the benchmark value of the bidder is equal to 28 points, the bidding price is higher than the evaluation of the benchmark value, the bidding price is equal to 28 points, the bidding price is higher than the evaluation of the benchmark value, the bidding price is lower than the evaluation of the benchmark value. Higher than the evaluation of the benchmark value, according to each higher than the evaluation of the benchmark value of 1% deduction of 2 points in proportion to the deduction until the end of the deduction; bidding price is lower than the evaluation of the benchmark value, according to each lower than the evaluation of the benchmark value of 1% plus 2 points in proportion to the addition, up to a maximum of 6 points.
2, the quality of goods installation to meet the requirements of the tender documents. 2 points
3, the installation period to meet the requirements of the tender documents. 2 points
4. Preferential terms. 2 points
(1) security system warranty period better than the requirements of the bidding documents, each extension of one year plus 0.5 points, up to a maximum of 2 points.
(B) the technical part of the Department (60 points)
1, the network to build connection design program (25 points)
(1) the program design using mature technology and devices, the key part of the use of domestic and foreign advanced components and technology; (2-4 points)
(2) the design principle of "generalization, modularization, systematization (2) design principle "generalization, modularization, systematization", to achieve standardization, modular design, to ensure the universality of the components, interchangeability; (1-2 points)
(3) network construction should be scalable, serial and parallel interfaces in line with the requirements; (1-2 points)
(4) electromagnetic compatibility design, lightning, to prevent electromagnetic interference; (1-2 points)
(5) to ensure that the system is stable, good and reliable operation; (1-2 points)
(5) to ensure Stable, good and reliable operation of the system; (1-2 points)
(6) the overall design of the structure of the equipment, structural optimization, reasonable layout, to meet the product operation, maintenance and convenience, the product's structural modeling design is beautiful and generous. (1-3 points)
(7) Network planning is clear, and low operating costs. (1-4 points)
(8) Draw a reasonable network wiring diagram for the distribution of monitoring points to network terminals. (1-4 points)
(9) monitoring distribution points have detailed equipment location location map, the layout is reasonable and in line with the surrounding situation. (1-2 points)
2, the system installation organization design (hereinafter referred to as "construction program"): (13 points)
(1) The bidding documents, "construction program" should contain the following eight major elements:
a The main sub-projects construction method;
b. Labor force equipment plan;
c. The main installation machinery and test equipment equipment equipment plan;
d. Ensure the quality of technical and organizational measures;
e. Ensure the safety of technical and organizational measures;
f. Ensure that the civilization of the construction of the organizational measures;
g. Ensure that the duration of the construction plan;
h. Ensure that the construction plan shall contain the following eight main contents Technical and organizational measures to ensure the construction period;
h. Network diagram of the total progress or duration of construction.
The above 8 complete *** 8 points, each missing 1 deduct 1 point.
(2) "construction program" level: for the following content by the judges in the range of 0-5 points discretionary scoring
a, quality, schedule assurance measures, site installation of safety measures, civilized construction measures, such as technical measures are clear, detailed, reasonable; (0-1 points)
b, construction schedule or schedule network diagram. Construction schedule or schedule network diagram scientific and reasonable; (0-1 points)
c, installation staffing to meet the needs of the project; (0-1 points)
d, the main installation of machinery and test equipment table; (0-1 points)
e, installation and commissioning program is reasonable; (0-1 points)
3, the quality of the goods, the performance and technical Advanced (6 points)
a, quality: bidding for the goods specifications, models, brands, places of origin, the narrative is clear, exhaustive, and quality to meet the requirements of the bidding documents scored 1 point;
b, performance: technical parameters of the goods, technical indicators, the goods of the various functions of the bidding documents in line with the requirements of the basic score of 2 points, higher than the requirements of the bidding documents, the jury according to the circumstances of the discretionary addition of 0 ~ 1 points Performance; performance has a slight deviation, the evaluation committee according to the circumstances of the discretionary deduction of 0 ~ 1 points;
c, technological sophistication; bidders have sufficient reasons and evidence to prove that its bidding for the leading position of the goods in the relevant field, and the price of the performance of a reasonable score of 0 ~ 2 points;
4, personnel training and service commitment (6 points)
a, personnel training program; (0-1 points)
b, quality assurance, quality assurance and service commitment (6 points) p>
b, service commitment during the warranty period; (0-2 points)
c, service commitment outside the warranty period. (0-2 points) p>
5, the bidder's qualifications and performance (the original is required to provide when opening bids) (10 points) p>
(1) companies through the ISO9000 series of quality system certification; (2 points) p>
(2) corporate credit rating of AAA; (2 points) p>
(3) bidders within two years, there are three or more public security or banking system Security monitoring system contract and acceptance report of successful cases of engineering (no acceptance report, then must provide the user opinion) (1 point); such as the provision of a single successful case of security monitoring system project costing more than 1 million yuan, plus 2 points for each, up to a maximum of 6 points; (7 points)
The scoring process according to the law of rounding up to the third decimal point, and the final result is taken to the decimal point of the second place!
The top three bidders with the highest total scores are the successful candidates for this project.
After the evaluation of the bid evaluation committee, less than three valid bidding documents make the bid obviously lack of competition, the bid evaluation committee can reject all bids, the bidder shall re-tender according to law.
Construction equipment installation project bidding evaluation activities, with the continuous development of bidding practice, in accordance with the "Bidding Law" and its supporting regulations, rules and regulations continue to improve.