Integrated wastewater treatment equipment in operation need to pay attention to what

1, the water pump, fan adjusted to the normal state.

2, according to the design of the operating program work, often observe the growth of biofilm.

3, in general, the control cabinet will be placed on the automatic position, the control cabinet for automatic control can be. Usually only need a person every day regular inspection, operation and add disinfectant.

4, must pay attention to the sewage must not have large solid material into the equipment, so as not to block the pipeline and orifice and pump damage.

5, equipment into the hole must be covered to prevent accidents or fall into the large solid matter.

6, into the equipment of the sewage PH value must be between 6-9, acidic and alkaline will affect the normal growth of the biofilm

7, the fan is generally running 6 months or so need to change the oil once, in order to improve the service life of the fan.