Formwork Project Labor Contract Model

Although formwork is a supporting structure, it is vital in concrete construction. How is the formwork project labor contract written? The following is my compilation of formwork project labor contract, welcome to read.

template project labor contract model a

Party A: Party B: ID card number:

According to the "Chinese People's *** and State Contract Law", "Chinese People's *** and State Construction Law", "Construction Project Quality Management Regulations" and relevant laws and regulations, follow the principle of equality, voluntariness, fairness, honesty and credit, combined with the actual situation of the project, in order to better Clearly the rights, obligations and responsibilities of both parties, the two sides carefully negotiated the signing of this contract.

I. Project Overview

(a) Project Name: Zunyi Suiyang Regal Plaza

(b) Project Location:

(c) Project Content: Template Project

(d) Floor Area: about 40,000 square meters

Second, Contracting Mode

Labor measurement contracting. Package machinery and equipment, project quality, duration, safe production, civilized construction.

Third, the site conditions provided by Party A

(a) Party A is responsible for the construction of electricity and water to each floor of each unit of the project,

one, two, three power distribution box installation.

(ii) Party A to provide support for the mold required for the frame materials, templates.

Fourth, the contracting scope and content of Party B

(a) the template production, installation, mold protection, demolition, etc. (including the later ring beam pressure top, structural column template).

(b) the template production and installation of this project, the required tie rod, step tight, through the wall pipe, chainsaw, circular saw, planing machine, nails, wire and other machinery and equipment by Party B is responsible for their own solution.

(c) Party B is responsible for templates, wood, frame materials and other raw materials off the car, including crane range of transit, another subsidy of 5,000 yuan of Party B up and down the car and transit fees.

(d) the construction process template brush mold release agent.

(e) the construction process with other types of cooperation, safety and civilized construction, floor and construction site cleanup, material stacking, template team construction is completed after the demolition of the construction site should reach the masonry team, floor team, plastering team do not need to clean up directly into the site for the next degree of the construction process.

(F) concrete pouring process if the template support caused by bursting mold, mold rise caused by quality problems, Party B should be timely due to their own reasons for concrete picking, slag clearing, and so on.

(vii) The concrete support required for formwork support shall be purchased by Party B.

V. Schedule requirements

Party B should be based on Party A's monthly and weekly construction progress plan and the construction tasks issued by the constructor to be completed on time, such as Party B late completion, Party A has the right to God table section of the weight of Party B to be punished.

Six, quality standards and acceptance requirements

(a) the project quality requirements standard: the project is a qualified project, strive for excellence. Party B must be in accordance with the project's operating instructions and related technical, quality delivery information carefully organized construction to achieve the construction, design, supervision and quality supervision and other departments of the joint acceptance of the assessment standards.

(b) Party B support the template quality of the basic requirements are: to ensure that the cross-section size is correct; to have sufficient strength, rigidity and stability and not leakage of slurry.

(c) the quality of the finished product after demolding, its verticality and flatness must meet the acceptance standards, found that the mold, distortion, unevenness, etc., Party B is responsible for chiseling and leveling. Party B to the contracted works to Party A to assume responsibility for the quality of the problem must be subject to Party A rectification advice deadline rectification; such as late rectification, Party A has the right to penalize Party B. And Party B will be responsible for any resulting damage to the quality of the finished product, and Party B will be responsible for any resulting damage to the finished product. And Party B bear the losses caused by this.

(d) Party B in the completion of each construction part or process, must be carefully self-checked, mutual inspection after passing, before reporting to Party A verification.

(e) according to "building construction safety inspection standards (JGJ59-99)" and the project department prepared by the "construction organization design", "supporting frame construction program" set up template construction required support frame.

VII, limit materials

Party B contracted to implement the project limit materials, Party B must carefully organize the template production and installation, is strictly prohibited long materials short, large materials small, without the consent of the constructor's instructions unauthorized dismemberment of the template materials, by Party B to Party A to compensate for more than twice the price of dismembered materials materials material payments.

Eight, template labor contracting unit price and pricing

This project template labor cost according to the template contact area for calculation, non-standard floor above the ground beam, standard floor unit price are 18 yuan / ㎡, belonging to the Party A issued by the sporadic technical labor, according to the calculation of 200.00 yuan per day, miscellaneous laborers calculated according to the calculation of 80 yuan / workday. The above unit price includes: labor cost, stoppage fee, failure to foresee the fee, management fee, rush fee, risk fee, profit, etc., as well as other auxiliary work required for the completion of the project.

IX. Payment Methods

(a) Party A calculates according to the nodes required to be completed for each unit of work. Party B completed to the main building after the roof, the completion of the list will be given to the Party A constructor to validate, Party A within 10 working days according to the completion of 90% of the amount of payment to the Party B the first labor payment, 10% after the completion of the plastering (demolition, transfer, stacking, as well as deducting the cost of picking and hitting).

(b) Party B into the field after Party A according to the number of people on duty, Party A per person per month to pay Party B labor costs and other costs, per person per month fee of 2,000 yuan

(in the case of a canteen, can be borrowed in the canteen service department meal ticket).

(c) Party A and the company's violation of the fine and the borrowed meal ticket from Party B each time the actual labor fee deducted.

(d) Party B shall prepare a salary settlement program in duplicate according to the team members each time it receives the progress payment, which shall have the settlement amount per person and the signatures of the team members entrusted with the payment, and submit one copy to Party A's financial department.

(e) Party A pays Party B for the project labor, including Party B and the required personnel labor protection costs, social security fees and insurance premiums, basic pension insurance, medical insurance and so on.

X. Delivery and return of deposit

Party B is willing to pay performance bond of 5000 yuan to Party A after understanding Party A's project progress, quality, safety and civilized construction and related systems. Party A in ?000 concrete pouring is completed, a one-time refund to Party B deposit, the deposit does not accrue interest.

XI, Party A's responsibilities and obligations

(a) to Party A to provide construction drawings, templates, templates, templates, materials and work surfaces with construction conditions.

(ii) to Party B for operating procedures, quality standards, quality requirements, safety and civilized construction and other content of the delivery.

(C) the party B construction quality, progress, safety, civilized health and finish the work please work supervision, inspection and acceptance.

(d) according to the contract, to pay party B with payment terms of labor. XII, Party B's responsibilities and obligations

(a) After the signing of this contract should be signed in a timely manner with the members of the employment contract and safety responsibility, to Party A for the record.

(b) Strictly abide by Party A's rules and regulations, safe operating procedures, civilized construction and comprehensive governance provisions.

(c) should be assigned to the line, on-site construction management, and accept the management, guidance and inspection of the construction workers assigned by the labor company, must implement the provisions of the license for all operators, the establishment of a part-time safety, quality, comprehensive governance, adhere to the pre-work briefing, supervision and acceptance of the work after the work, and do a good job of recording the day. And before the work of the construction site of all the safety facilities, machinery and electrical appliances to view the first after the use of safety is not guaranteed in the case of construction, to eliminate unauthorized command, unauthorized operation.

(d) to stop the personnel belonging to the indiscriminate pulling of power in the collective dormitory with electric cooking appliances cooking, cooking, boiling water and heating, once found, Party A has the right to Party B to make the appropriate penalties, and at the same time by Party B to bear the full responsibility for the accidents caused by all the responsibilities and costs.

(e) Obey the supervision and inspection of on-site constructor, quality inspector and safety officer, accept the rectification opinions, and complete the rectification in time to ensure the construction quality.

(F) is responsible for the protection of the speculative surface of the pre-buried pipelines, pre-drilled holes in the completion of the correct location, shall not be arbitrarily blocked or moved.

(VII) every day to do a good job of the construction site *** after the completion of the material clear, clean up the dormitory inside and outside environmental health, to ensure that the construction site is civilized and clean and clean living area clean and hygienic.

(viii) Party B and its members shall not bring non-site personnel into the construction site or living area of Party A. If found, Party A will penalize Party B according to the relevant provisions, such as the resulting accidental loss of Party B is responsible for.

Thirteen, the responsibility for breach of contract

(a) one of the following circumstances, are Party B in breach of contract:

1, Party B contractors are often AWOL from work, or the construction of a serious shortage of personnel, repeated failure to complete the construction task on schedule and should be to the Party's overall progress in construction;

2, Party B in the time specified by the Party's refusal to rectify the situation, and after repeated urging is ineffective;

2, Party B in the Party specified time, and by the repeated urging;

3, Party B in the construction site or living quarters, the Party will be responsible for the accidental damage.

3, Party B construction quality is poor, resulting in waste of materials, progress lag and damage to the reputation of Party A;

4, Party B to give up the contract or subcontracting the project to a third party;

5, Party B mobbing, jacking up the price of the work, pestering the work fee, and disrupting the normal order of the work of Party A. The Party B will be responsible for the construction of the project, and the work will be done in the same way as Party A. The Party B will be responsible for the construction of the project. For Party B's breach of contract, Party A may impose penalties on Party B such as fines, demands for compensation for losses and termination of the contract.

(b) one of the following cases, Party A will compensate Party B for the loss:

1, due to the error of Party A's construction guidance or due to design changes, Party B is required to rework the completed project, Party A will compensate Party B for the actual loss caused by the reworking;

2, Party A owes Party B the construction wages for more than one year without any justifiable reason, Party A will pay Party B at the same bank interest rate for the same period of time. The same period of bank interest rate to pay Party B the interest on the arrears of wages.

XIV, safety, security and fire prevention management

(a) Where Party A unit of production operations of Party B personnel, after entering the site by the person in charge of Party B to provide Party A with the team personnel, making a roster, according to the regulations handed over to Party A. The Party B must provide the personnel to comply with the provisions of the law, and the Party B must provide the personnel to comply with the provisions of the law. Party B must be subordinate to the personnel to comply with the law and comply with Party A unit of safety, security, fire management system of publicity and education.

(b) Party B personnel internal security disputes, cases and accidents, Party B is responsible for investigating and handling. Private take, theft of Party A financial personnel, the Party's security department in accordance with the provisions of the submission, punishment. Loss of equipment in Party A received or borrowed, by the loss of the original price compensation.

(C) Party A has the right to Party B fire inspection, supervision, investigation and handling of fire violations, Party B personnel due to violations of fire alarms, fires, in addition to the investigation and punishment of the responsible personnel in accordance with the law, but also have to bear all the losses caused by the fire, and Party B to carry out penalties, the general fire accidents, a fine of 200.00 yuan, the major fire accidents 200.00-500.00 yuan.

(d) Party B shall not stop work or make trouble for any reason, otherwise all the loss of time and economic losses caused by Party B shall be borne by Party B and punished by RMB

1000.00 Yuan/day, and shall not allow the phenomenon of fighting and brawling, and shall not listen to Party A and the company's on-site management personnel, etc., and once these phenomena occur, depending on the severity of the case, Party A shall carry out the following measures on Party B 50.00-500.00 yuan fine, if the circumstances are serious, according to the public security organs to deal with, and Party A has the right to refuse to pay the project labor.

(e) Party B in the construction process, must do all the safety precautions, subject to Party A management personnel safety command, Party A will not regularly check Party B's safety precautions, the prevention of not in place will, depending on the circumstances, be given a warning, ordered to rectify, and even financial penalties. If a safety accident occurs within 5000.00 yuan, Party B will be responsible for it. If a safety accident occurs above 5000.00 yuan, Party A will be responsible for 80% of the cost, and Party B will be responsible for the rest of 20% of the cost.

XV, other

(a) after the signing of this contract, due to changes in policy, the owner of the untenable force and Party A both the following reasons lead to the construction of the project to stop or slow down the construction of the contract can not continue to perform, Party B should be properly done to complete the protection of the project and handover of the work; such as the need to continue construction to the part of the construction, Party B should be Party A directives to the safe parts of the construction, according to the requirements of the Party A will be brought to the construction site. Tools and personnel will be removed from the construction site according to Party A's requirements. However, Party A must provide conditions for Party B to withdraw and pay for the completed works according to the contract. If Party B withdraws from the construction without any reason, Party A will refuse to pay for the completed part of the project, and Party B will be responsible for the loss. Such as seriously affecting the construction progress or site of Party A, Party B must bear the economic responsibility.

(b) Party B can not meet the quality and schedule requirements due to the quality of workers and other reasons, as well as illegal and disciplinary behavior, Party A has the right to propose a replacement, and Party B will bear all the losses and responsibilities.

XVI, this contract is signed after careful review by Party A and Party B, and has the same legal effect. This contract in two copies, Party A and Party B each holds a copy, both signatures and performance bond execution date effective, the contract is fulfilled, pay the final payment automatically expires. Other outstanding matters, the two sides signed a supplementary contract, as an annex to the same.

XVII, special agreement

Conversion layer below 7 days a floor, conversion layer 15 days to complete the standard layer of 3 days a floor, quality and quantity to complete, such as failing to meet the schedule of the project, Party A will be heavily penalized.

Party A: Party B: Representative: Representative: Tel: Tel:

Year month

template engineering labor contract model two

Contractor (full name): (referred to as Party A)

Contractor (full name): Zhang Zhiping, etc. (see details in the annex to the contract) (referred to as Party B)

According to the "People's Republic of China*** and the State Contract Law", the "Chinese People's Republic of China", the "Chinese People's Republic of China" and the "Chinese People's Republic of China", the "Chinese People's Republic of China" and the "Chinese People's Republic of China Construction Law", the "Chinese People's Republic of China" and the "Chinese People's Republic of China Construction Law". Chinese People's *** and State Construction Law", "Chinese People's *** and State Construction Quality Management Regulations" and other relevant laws and regulations, follow the principle of voluntary and honesty and credit, combined with the specific circumstances of the project, the two sides of the construction labor cooperation consensus, agreed to sign this contract, the two sides *** together to comply with the performance.

I. Project Overview

Project name: Headquarters Economic Park villa A20-22 concrete picking project

Second, the content and scope of the contract

2.1 Party A is responsible for providing on-site construction of water and electricity connection point, Party B need to be connected to the construction of water and electricity from the point, or else all the damages caused by Party B bear full responsibility. (Electricity and water charges shall be borne by Party B and paid to the general contractor).

2.2 Completion of all picking works specified by Party A.

3. Quality standard

3.1 The quality standard of the project is: Party A acceptance can be qualified.