Engineer personal work summary selected 5

1. Engineer's personal work summary

Time rushes by in the busyness, and a year has passed. With the help of the company's leadership and colleagues, I feel that I have made great improvements in my work. In engaged in Daan supervision work period, I work hard, conscientious dare not burnout, with good professional ethics and strong sense of responsibility to work seriously and carefully. Now on the 20xx year's work and supervision experience to do the following summary report.

First, the work situation

This year, I mainly supervised the laying of fiber-optic cable project of about 121 kilometers, the wireless network upgrading and renovation project of 42 base stations (including the landscape tower of nine. Macro station 1), broadband network box 160, pipeline 2.1 kilometers, integrated cabling project *** count 3600 meters of which Guangchang County fiber optic cable laying project is about 93 kilometers, pipeline 2.1 kilometers, wireless network upgrading and renovation project 22 base stations, 6 landscape tower base station, 1 macro station (*** counting the number of supervisory base stations for 29), broadband access project network box *** count about 160, integrated Wiring project *** counted about 3600 meters, August 13 to December, Dongxiang County fiber optic cable laying project of about 28 kilometers, line network upgrading and renovation project 13 base stations (including 8 indoor distribution sites), 3 landscape tower base stations (Dongxiang County *** counted the number of supervisory base stations for 13). I supervised these projects in strict accordance with the requirements of Daan. And in the supervision of the project can be very good and the construction unit and the mobile company communication, *** with the control of project quality, and by the Guangchang County Mobile written praise.

In November, I participated in the information system supervision engineer examination, and successfully passed the examination. This is a great help to my work, in order to supervise the work of a solid foundation.

Second, obey the arrangement, can suffer

I obeyed the company's arrangements in April from Ganzhou Xinfeng County adjusted to the project department in Fuzhou, in May, the company will be adjusted from the project department in Guangchang County, Fuzhou to Guangchang County, a round-trip ride takes more than 6 hours, Guangchang to Fuzhou, the earliest bus is 7:00 (summer time), each meeting to 6:00 to catch a bus to Fuzhou meeting. To go to Fuzhou for meetings, in the heat of the day to live in the 8th floor of the room without insulation, a few times have heat stroke, but still dedicated efforts to do a better job, and in the heat of the day to the mobile company, riding a bike back and forth to 1 hour, every time it is sweaty.

In August, the company will be adjusted from Guangchang County to Dongxiang County, Dongxiang County and the county mobile relationship is also getting along very well, and can be high-quality leadership to complete all the work, won the head of the various projects have been praised.

At the beginning of December, the company once again adjusted me from Dongxiang County to Guangchang County, and again back to the round trip to Fuzhou more than 6 hours, 6 o'clock up to catch the car to go to Fuzhou for a meeting, back and forth to move an hour's work, so that I am still working hard to do a better job, and more outstanding.

This year *** counts the company will be adjusted to different places *** counted 4 times, moving *** counted 6 times, to Fuzhou *** counted 8 months, the average did not 2 months to adjust 1 time.

2. Engineer's personal work summary

20xx year, in the company's chairman, the general manager of the wise decision-making and the correct leadership of the company's staff *** with the efforts and support to the development of the company's policy as the guiding ideology, and adhere to the principle of continuous learning, continuous improvement. Diligently and conscientiously carry out all the work, so that I have successfully completed my work. To be a competent engineer is my duty goal; to be a qualified engineer, first of all, I have to be sincere, proficient in business, and have good professional ethics and a strong sense of corporate responsibility. Since I entered the Longzheng real estate company, always with diligence, down-to-earth attitude to my work, to be a qualified chief engineer to strictly require themselves, now I 20xx year's personal work is summarized as follows:

First, planning and design management work

1, according to the general manager of the implementation of the refinement of the management of the instructions, in order to guide the company in the construction project design document review work, so that the reviewer in the process of reviewing drawings clear drawing review points, standardize the company's construction project planning and design document preparation, management and planning and design stage of the project monitoring the whole process, to ensure the integrity of the design documents of each design stage, so that the design is in a state of control, to put an end to the design of the common errors, omissions, touching, lack of problems, improve the company Construction project quality, to ensure quality, progress, and can control the reasonable cost of the purpose, according to the Ministry of Construction "" Construction Engineering Construction Drawing Design Document Review Points " requirements, to complete the" Residential Design Unified Technical Measures ":" Guangxi xx Real Estate Co. The preparation of the work.

2, in the work of 20xx, to complete the "xx Mansion", xx Central Ocean Park 5 # building type change design program, "xx Mansion landscape design program" and "xx Central Ocean Park", "xx Central Ocean Park", "xx Mansion", "xx Central Ocean Park", "xx Mansion", "xx Central Ocean Park", "xx Mansion" and "xx Central Ocean Park". "XX Central Ocean Park Phase II outdoor supporting landscape design program" review work; in the review work to correct the landscape design focuses only on the visual pursuit of high-grade, luxurious form of beauty, without regard to the project's investment costs and future management costs and household design and other irrational design programs, improve the quality of planning and design of residential areas and Reduce project investment costs.

Second, the new technology and new technology learning and application

In 20xx work, constantly learning and researching relevant design specifications, construction norms, new technology in the construction industry, new technology, and new technology in the construction industry, new technology, new technology applied to the development of the project, not only to the company to bring a good economic and social benefits, but also the use of environmental protection and social resources also play a role in the development of the project. environmental protection and the utilization of social resources also plays an important role.

1, with the rapid development of China's economy, the face of the construction industry is changing day by day, and the demand for floor slabs in the construction market has also changed greatly. In order to adapt to the needs of economic development, the new technology of the construction industry "cast-in-place concrete hollow core floor cover structure technology" is applied to the basement of A and B areas, so that the self-weight of the building is reduced, shorten the construction period, reduce the overall cost, and improve the company's economic and social benefits. Under the strong support of the company's leadership, the design and company personnel went to Guangzhou and other places to conduct site visits; according to the "feasibility report" provided by the design unit to carry out multi-faceted "feasibility study", demonstration, and detailed economic analysis after the preparation of the Optimization results report. Completed the "cast-in-place concrete hollow core building cover structure technology" for the application of A, B basement, bringing certain economic and social benefits to the company.

2, energy is a country's national economy and social development of the foundation, is the entire human society depends on the survival and development of material security; with the rapid development of China's national economy, energy and resource shortages and environmental pollution has become a very serious problem. According to the general manager: the application of renewable energy to the "xx Central Ocean Park" building instructions, carefully study the Ministry of Housing and Urban-Rural Development to build science [20xx] No. 72 issued "'Twelfth Five-Year" Building Energy Efficiency Special Planning "requirements and access to a large number of renewable energy building application information. The application of renewable energy building information. According to the "Fangchenggang xx Central Ocean Park Renewable Energy Building Application Design Demonstration Report" provided by the Renewable Energy Building Application Technical Support Unit, the feasibility study and detailed economic and technical analysis are carried out to utilize renewable energy. Ground source heat pump hot water system, using the soil source as a heat source, for 5 to 9 # **** counting 5 residential buildings 753 households need to provide hot water throughout the year, the application of renewable energy to the "xx Central Ocean Park" building, to the company to bring significant economic and social benefits.

Third, the project implementation phase of the management of technical documents

20xx in the project implementation phase of the management of technical documents, completed the "xx Central Ocean Park 3 - 4 # building waterproofing project construction program", "5 #, 6 # building and A area". Basement manually dug pile project construction program", "xx Central Ocean Park, a landscape project construction program", "5 #, 6 # building and A basement manually dug pile project supervision management rules" and other technical documents for the record, to standardize the company's management of technical documents, the major technical documents to focus on the gatekeeper to ensure that the document preparation of the correctness, legitimacy. So that the company to carry out production and management (quality, safety, progress, settlement management, etc.) work *** with the technical basis for improving the company's management system of scientific rationality, so that the technical documents to become a "controlled" and normal operation of the document.

Fourth, 20xx year work ideas and prospects

20xx year is about to pass, the new year is coming, summing up the past, look forward to the future, with the development of the times, the face of the construction industry is changing day by day, in the new year, we must seriously study the "Chinese People's Republic of China and the State of the urban real estate management law", seriously study and research! Application of information technology, green building core technology, new energy building application technology, ten new technologies in the construction industry, more new technologies to play an effective role in the company's prosperity and save more natural resources and make a positive contribution.

Profit is the basis of survival of enterprises, the pursuit of profitability is the main task of all business managers, in the new year's work, the strict implementation of the company's management system, and seriously study the company's "planning and design of unified technical measures", reasonable control of investment costs; to do their jobs, love and dedication; Diligently study new technology, new technology. Apply more new technologies to the company's development projects, make new contributions to the company's economic benefits, and strive to be a qualified engineer. The above is my 20xx year work summary, I hope that the company leadership in the new year's work can give me more understanding and greater support, and strive to make more contributions to the company!

3. Engineer's personal work summary

I graduated from the Inner Mongolia University of Science and Technology, Automation Department, Measurement and Control in 20xx, 20xx came to Zhuozhi Power Plant to engage in the 200MW unit of the thermal engineering maintenance work. In these five years, through their own unremitting efforts to learn professional technology, and constantly improve the level of business, from theory to practice, and from practice to theory, will be their own textbook knowledge learned in school and the actual organic combination, so as to be more enriched their own minds, armed with their own talents, but also become a professional position and professional and technical skills of the profession. Review of the journey taken in these years, full of professional and technical learning, the love of the workplace and the diligence of the work. Now summarized as follows:

I. Continuously strengthen the study, strict requirements for themselves, to enhance their comprehensive quality, to adapt to the needs of modern power plants. With the development and progress of society, the development of power production is also increasingly towards modernization, I plant four units of dust, ash and slag removal system are used PLC program control system to control the entire process, the degree of automation is high. In order to better harness the system, the need to master the knowledge must be more comprehensive, more solid, in order to adapt to the development of the power system, I in order to adapt to the needs of modern power plants, in their spare time to strengthen their computer knowledge training and learning, learning network knowledge and PLC, DCS system knowledge, follow the manufacturer to learn the logic and configuration, in order to lay a solid foundation for the future of the main inspection of the thermal engineering work. During this period I have an in-depth understanding of the working principle, composition and assembly of the microcomputer, especially the operation of the computer more comfortable, so that I am quite skilled in the operation of the site microcomputer for the safe and stable operation of the unit to get a guarantee for the accident treatment to win the time.

Second, to the company's thermal engineering profession has been five years, in the last two years of life, I served as a thermal boiler group leader, thermal steam engine group leader position, the heart is very much within the heart of thanks to the leadership of the help and guidance, not only in the two years in the professional and technical aspects of the development of a more comprehensive, but also in the people of the more opportunities to learn.

In 20xx in the thermal peripheral group, engaged in 2 years of thermal inspection position, the periphery of the thermal equipment varieties, but this also creates a learning opportunity for me, that is, in that is fortunate to be able to understand the DCS control system, slag, ash removal system PLC logic control, and in the maintenance of the measuring element installation location and its use have a preliminary understanding, it is in these 2 years, in this way, I am very grateful to the leadership help and guidance. Understanding, it is in this 2 years of unremitting efforts to lay a hard foundation for my future path.

In July 20xx, I had the honor to participate in the thermal engineering training organized by Huadian Group Corporation, in the training mainly for the power plant PLC and thermal automatic control learning, through this training I have a deeper understanding of the structure of the DCS control system layout, network connection, the thermal engineering maintenance work in the future has a very big help, in the maintenance of the work of the more The training is very helpful for the future maintenance of the thermal engineering work, in the future maintenance work, more basis for judging the fault, and better guarantee the safe operation of the unit.

During 20xx, the maintenance of the coal mill slagging door for pneumatic valves, and the cylinder connection part of the plastic pipe, in the repeated maintenance of the coal mill in the process of slagging temperature is very high very easy to connect the cylinder of the gas source tube burned, from time to time to replace the gas source tube, resulting in unnecessary economic losses. Therefore, the gas supply pipe are changed to iron pipe, after the transformation of the effect is obvious, the coal mill due to slagging door failure downtime is greatly reduced.

During 20xx, I served as boiler team leader of the thermal engineering specialty, participated in the #1 unit overhaul, boiler oil gun modification, coal feeder modification debugging work, further thermal engineering equipment has a detailed understanding of the same time in the #2 unit of coal feeder accumulator modification, the protection of the coal feeder and its control have a full grasp of the whole, and put forward a number of changes to the views, to facilitate the coal feeder, and the coal feeder, the coal feeder, the coal feeder, the coal feeder, and the coal feeder, the coal feeder, the coal feeder, and the coal feeder. At the same time, in #2 unit coal feeder accumulator modification, I have a full grasp of the coal feeder protection and its control, and proposed some changes to facilitate the coal feeder coal control, so that the boiler combustion is stable and the unit load fluctuations are reduced. In the coal feeder transformation I put forward the coal feeder PLC transformation proposals and won the third prize for rationalization proposals, specific reengineering is as follows:

The original coal feeder is through the combination of PLC and accumulator to achieve remote local control of coal and related alarms, due to the operation of the site environment found that the poor local coal feeder control cabinet of the PLC and its easy to fail, it is proposed to change it to a contactor circuit, so that the coal feeder can be controlled by a contactor. Suggested to change it to contactor circuit, the alarm is realized by DCS so as to meet the remote control and also realize the corresponding alarm, which greatly saves the cost of equipment and its failure rate. In October, I participated in the renovation work of the heat network control station, not only had a preliminary understanding of the new heat network system, but also consolidated the knowledge of DCS and DEH system, i.e., DCS network loop and its control of the internal structure of the composition, the logic loop, the card connecting the loop, the card communication part of the DEH, the establishment of the communication mode between the upper computer and the lower computer as well as the invocation of the trend of the upper computer have a deep understanding.

The DEH card communication part, the establishment of the communication method between the upper and lower computer, and the call of the upper computer trend are all y understood.

In 20xx, I served as the thermal engineering professional steam engine team leader position, in July during the privilege to participate in the coordinated control system improvement work, in the Daxi power plant experts under the guidance of the success of the coordinated control system of the four units of logic modification work is completed, and ultimately can realize the coordinated automatic control. Although the debugging time is a little short, but my professional inspiration is very big, since the school out of the school did not realize that the knowledge learned in school and our life work is closely related.

In short, because I studied in the school of thermal automation, the theory of the machine, the furnace, have a full understanding, and after years of practice in the field operation, whether in the ideological understanding, or in the field work, strict requirements for their own, and continue to strive to learn the level of business, and has accumulated a wealth of experience in the field, analyze and deal with a lot of accidents.

From this, their comprehensive quality has improved very much, at the same time, I am in the Zhuozhi Power Plant in these years, from infrastructure to production, from operation to overhaul, from the preparation of regulations to establish rules and regulations, from the training of personnel to the actual operation, I really feel that these years are hard, but I have also accumulated a lot of experience for their own in the profession, especially from the infrastructure to production, I benefited a lot. I have benefited a lot from this process. I hope to contribute to the power plant with my own light and heat.

4. Engineer's personal work summary

The civil engineer is the first job I engaged in, it is the beginning of my career, I also cherish this, and try my best to adapt to this position. Through a year of continuous learning, as well as colleagues, the leadership of the help, I have been fully integrated into the company's family, personal work skills have improved significantly, although there are still such and such shortcomings in the work, but I should say that this year paid a lot of money, but also gained a lot of my own growth, but also gradually mature. Now on this year's work is summarized as follows:

A year after my unremitting efforts to complete a phase, the second phase of the project construction data collation and transfer of work, the second phase of the project landscaping, landscaping work, c group of pre-start preparatory work, c group model house project and other work delivered to the leadership of the company.

1, the second phase of the project construction data collation and transfer of work

The first half of this year, the second phase of the project was successfully handed over and delivered to the owners to use, the project must be handed over before the handover of the construction data collation handover is complete, I carefully check the construction data of each building are carefully reviewed, and strive to achieve a not missing, not missing, directory neat, to ensure that the information is complete, before the handover of the second phase of the project, the construction data is not missing. The information is complete, before the handover of the second phase of the 13 buildings of all the floor plans, warranty certificates, manuals, I have to prepare in advance complete, ready for the handover to the owners to give full protection.

All of the record information of the 13 buildings in the second phase was sorted out by my hand, and then under the guidance of the leadership, I successfully completed all the information before the handover of the organizing work. After the handover, due to too much information and its importance, it needs to be transferred to the company's archives for safekeeping. During the handover period, I had to reorganize more than 100 boxes of data of 30 buildings in the second phase, so that each one of them had a record and made a catalog from which I could find out any one of the data. During this period, I spent a lot of energy, spending nearly a month's time, and finally lived up to the leader's request to reorganize all the information.

2, the second phase of the project landscape, greening work

At the beginning of the year, I took over the second phase of the project landscape, greening work. Landscape, greening work relative to the modernization of the district, although the proportion is small, but significant. It is indispensable to the modern new living quarters. Due to adequate preparation, the second phase of the landscape, greening work went very smoothly.

However, the late acceptance, due to the specifications of the seedlings, a variety of species to our acceptance of the work has brought a lot of trouble, and ultimately, I through the cooperation with the technical department, the species of all seedlings, the number of specifications of all the verification in place. Finally successfully completed the leadership of the delivery of this work.

3, engineering

At the beginning of September, the leadership instructions. To build group c model house. It is 10 years in the national real estate downturn, the company's leaders wisely decided to group construction, the formation of this new house type of a microcosm. It is good or bad directly affects the three-dimensional superposition after the opening of the sales performance, but also the company this year, that is, after the sales of group b is not optimistic, a new initiative, its success or failure directly affects the company's success or failure this year.

After receiving the instructions of the leadership, I quickly put into the actual work, in order to achieve the expected results, I 3 times in 2 days to locate the line, and ultimately meet the leadership of the expected results. In the construction process, I am not afraid of hard work, hard work, and strive to work at the scene, after work due to the need for the project many times overtime work.

Later due to the intervention of the decoration company, which requires good coordination and organizational skills. Efforts to deal with the friction and conflicts between the two sides in the construction process. Finally successfully completed the model house project before the opening. For the company after the opening of the sizable sales situation and turn around the loss to make due contributions. After the successful opening, I also cooperate with the technical department. Participated in the model house late finalization matters.

4, a year of work experience

(1) to maintain a good state of mind and positive in the work attitude. As a member of the company, I consciously abide by the company's rules and regulations, and obey the higher leadership of the work arrangements; to the company's absolute loyalty to the attitude of the work into the work of the company, the company's things as their own home to do, in the solution to the site of construction management, coordination and other work, based on the actual situation of the site to think proactively, their own considerations should be accomplished by all the work, rather than waiting for the leadership to arrange. I will not wait for the leadership to arrange. With the master's mind into the work, to maintain the company's image and interests are not damaged.

(2) to integrate themselves into the company's collective, relying on collective wisdom and strength to complete the work. In the many jobs I have completed this year, the support and help of leaders and colleagues at all levels.

(3) through a year's work to find themselves there are many shortcomings: in the work of dealing with the scene, the management is not strong enough; to deal with the problem is not too careful, these problems I will be in the new 20xx year pay more attention to overcome.

20xx year, for me is to explore, learning, progress of the year, in the face of the work content is not the same as before, I corrected their own mentality, give full play to the competent initiative, proactive thinking. In such a year, I have enriched myself through my own labor, and broadened my horizons through the opportunities given to me by the leadership.

5. Engineer's personal work summary

In the blink of an eye, I came to the maintenance center has been a year's time, in the maintenance center I served as a laptop maintenance engineer position. In the leadership, colleagues care, help, I quickly into the role of the XX repair center is currently XX by the electronic city of their own IT repair service departments, but also XX state-owned repair center. The company's spirit of doing China's science and technology service providers, to provide customers with first-class after-sales service, "integrity-based, customer service as a friend" service purpose, "real, trustworthy", and constantly strive. As an XX employee, I feel very honored and proud. At the same time, I also know that only by constantly improving their business level, maintenance technology and work harder, in order to fit and meet the needs of the rapid development of the maintenance center. The following is a summary of my work over the past year.

I. Mainly responsible for the work:

1, in the repair center, I am mainly responsible for the reception of customers at the front desk, for the customer laptop problems to answer, as well as customer computer repair test.

2, answer the phone visits, the customer's questions to answer.

3, desktop computer repair, etc.

Second, the recent plan:

1, efforts to learn professional knowledge, notebook repair, desktop repair, monitor repair, data recovery. Strive to be a multi-faceted maintenance.

2, efforts to learn management knowledge, self-sublimation, for the leadership of worry.

Self-evaluation: strong communication, adaptation, management, innovation, motivation, teamwork, affinity, like to meet new challenges, the electronics industry in the village of Zhongguancun more understanding.

The leadership gave me a lot of space for development, so that I can better play their own ability, in this thank you to the leadership, I will continue to work for the development of the company's ability to play. I represent the Hailong maintenance center, always in mind, in word and deed, constantly ask for their own, to serve customers with a smile, so that customer satisfaction, satisfaction and return.